938 resultados para engineering management


Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The primary goal of this work is to quantify any bene?ts that the use of digital manufacturing methods can offer when used upstream from production, for manufacturing process design, and tool development. Learning at this stage of product development is referred to as management learning. Animated build simulations have been used to develop build procedures and tooling for a panel assembly for the new Bombardier CRJ1000 (Canadair Regional Jet, 100 seat). When the jig format was developed, its simulated performance was compared to that of current CRJ700/900 panel builds to identify and quantify any improvements in terms of tooling cost and panel build time. When comparing like-for-like functions between existing CRJ700/900 (Canadair Regional Jet, 70/90 seat) and the
CRJ1000 tooling, it was predicted that the digitally assisted improvements had brought about a 4.9% reduction in jig cost. An evaluation of the build process for the CRJ1000 uplock panel predicted a 5.2% reduction in the assembly time. In addition to the improvement of existing tooling functions, new jig functionality was added so that both the drilling and riveting functions could be carried out in a single jig for the new RJ1000 panel.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A queue manager (QM) is a core traffic management (TM) function used to provide per-flow queuing in access andmetro networks; however current designs have limited scalability. An on-demand QM (OD-QM) which is part of a new modular field-programmable gate-array (FPGA)-based TM is presented that dynamically maps active flows to the available physical resources; its scalability is derived from exploiting the observation that there are only a few hundred active flows in a high speed network. Simulations with real traffic show that it is a scalable, cost-effective approach that enhances per-flow queuing performance, thereby allowing per-flow QM without the need for extra external memory at speeds up to 10 Gbps. It utilizes 2.3%–16.3% of a Xilinx XC5VSX50t FPGA and works at 111 MHz.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A new technique based on adaptive code-to-user allocation for interference management on the downlink of BPSK based TDD DS-CDMA systems is presented. The principle of the proposed technique is to exploit the dependency of multiple access interference on the instantaneous symbol values of the active users. The objective is to adaptively allocate the available spreading sequences to users on a symbol-by-symbol basis to optimize the decision variables at the downlink receivers. The presented simulations show an overall system BER performance improvement of more than an order of a magnitude with the proposed technique while the adaptation overhead is kept less than 10% of the available bandwidth.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a class of defects in software requirements specification, inconsistency has been widely studied in both requirements engineering and software engineering. It has been increasingly recognized that maintaining consistency alone often results in some other types of non-canonical requirements, including incompleteness of a requirements specification, vague requirements statements, and redundant requirements statements. It is therefore desirable for inconsistency handling to take into account the related non-canonical requirements in requirements engineering. To address this issue, we propose an intuitive generalization of logical techniques for handling inconsistency to those that are suitable for managing non-canonical requirements, which deals with incompleteness and redundancy, in addition to inconsistency. We first argue that measuring non-canonical requirements plays a crucial role in handling them effectively. We then present a measure-driven logic framework for managing non-canonical requirements. The framework consists of five main parts, identifying non-canonical requirements, measuring them, generating candidate proposals for handling them, choosing commonly acceptable proposals, and revising them according to the chosen proposals. This generalization can be considered as an attempt to handle non-canonical requirements along with logic-based inconsistency handling in requirements engineering.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In responding to the demand for change and improvement, local government has applied a plethora of operations management-based methods, tools and techniques. This article explores how these methods, specifically in the form of performance management models, are used to improve alignment between central government policy and local government practice, an area which has thus far been neglected in the literature. Using multiple case studies from Environmental Waste Management Services, this research reports that models derived in the private sector are often directly ‘implanted’ into the public sector. This has challenged the efficacy of all performance management models. However, those organisations which used models most effectively did so by embedding (contextualisation) and extending (reconceptualisation) them beyond their original scope. Moreover, success with these models created a cumulative effect whereby other operations management approaches were probed, adapted and used.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Larsen and Toubro (L&T) Limited is India’s largest construction conglomerate. L&T’s expertise is harnessed to execute high value projects that demand adherence to stringent timelines in a scenario where disparate disciplines of engineering are required to be coordinated on a critical path. However, no company can acquire such a feat without systematic management of its human resource. An investigation on the human resource management practices in orienting L&T’s success can help to identify some of the ethical human resource practices, especially in the context of Indian market. Accordingly, a well-designed employee satisfaction survey was conducted for assessment of the HRM practices being followed in L&T. Unlike other companies, L&T aims to meet the long-term needs of its employees rather than short-term needs. There were however few areas of concerns, such as yearly appraisal system and equality to treat the employees. It is postulated that the inequality to treat the male and female employees is primarily a typical stereotype due to the fact that construction is conventionally believed to be a male dominant activity. A periodic survey intended to provide 360° feedback system can help to avoid such irregularities. This study is thus expected to provide healthy practices of HRM to nurture the young talents of India. This may help them to evaluate their decisions by analyzing the complex relationship between HRM practices and output of an organization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents and investigates a dynamic
buffer management scheme for QoS control of multimedia
services in a 3.5G wireless system i.e. the High Speed Downlink
Packet Access (HSDPA). HSDPA was introduced to enhance
UMTS for high-speed packet switched services. With HSDPA,
packet scheduling and HARQ mechanisms in the base station
require data buffering at the air interface thus introducing a
potential bottleneck to end-to-end communication. Hence, for
multimedia services with multiplexed parallel diverse flows
such as video and data in the same end-user session, buffer
management schemes in the base station are essential to support
end-to-end QoS provision. We propose a dynamic buffer management
scheme for HSDPA multimedia sessions with aggregated real-time and non real-time flows in the paper. The end-to-end performance impact of the scheme is evaluated with an example multimedia session comprising a real-time streaming
flow concurrent with TCP-based non real-time flow via extensive HSDPA simulations. Results demonstrate that the scheme can guarantee the end-to-end QoS of the real-time streaming flow, whilst simultaneously protecting non real-time flow from starvation resulting in improved end-to-end throughput performance

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reactive power has become a vital resource in modern electricity networks due to increased penetration of distributed generation. This paper examines the extended reactive power capability of DFIGs to improve network stability and capability to manage network voltage profile during transient faults and dynamic operating conditions. A coordinated reactive power controller is designed by considering the reactive power capabilities of the rotor-side converter (RSC) and the grid-side converter (GSC) of the DFIG in order to maximise the reactive power support from DFIGs. The study has illustrated that, a significant reactive power contribution can be obtained from partially loaded DFIG wind farms for stability enhancement by using the proposed capability curve based reactive power controller; hence DFIG wind farms can function as vital dynamic reactive power resources for power utilities without commissioning additional dynamic reactive power devices. Several network adaptive droop control schemes are also proposed for network voltage management and their performance has been investigated during variable wind conditions. Furthermore, the influence of reactive power capability on network adaptive droop control strategies has been investigated and it has also been shown that enhanced reactive power capability of DFIGs can substantially improve the voltage control performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Waste management and sustainability are two core underlying philosophies that the construction sector must acknowledge and implement; however, this can prove difficult and time consuming. To this end, the aim of this paper is to examine waste management strategies and the possible benefits, advantages and disadvantages to their introduction and use, while also to examine any inter-relationship with sustainability, particularly at the design stage. The purpose of this paper is to gather, examine and review published works and investigate factors which influence economic decisions at the design phase of a construction project. In addressing this aim, a three tiered sequential research approach is adopted; in-depth literature review, interviews/focus groups and qualitative analysis. The resulting data is analyzed, discussed, with potential conclusions identified; paying particular attention to implications for practice within architectural firms. This research is of importance, particularly to the architectural sector, as it can add to the industry’s understanding of the design process, while also considering the application and integration of waste management into the design procedure. Results indicate that the researched topic had many advantages but also had inherent disadvantages. It was found that the potential advantages outweighed disadvantages, but uptake within industry was still slow and that better promotion and their benefits to; sustainability, the environment, society and the industry were required.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The reverse engineering of a skeleton based programming environment and redesign to distribute management activities of the system and thereby remove a potential single point of failure is considered. The Ore notation is used to facilitate abstraction of the design and analysis of its properties. It is argued that Ore is particularly suited to this role as this type of management is essentially an orchestration activity. The Ore specification of the original version of the system is modified via a series of semi-formally justified derivation steps to obtain a specification of the decentralized management version which is then used as a basis for its implementation. Analysis of the two specifications allows qualitative prediction of the expected performance of the derived version with respect to the original, and this prediction is borne out in practice.