962 resultados para Nonlinear programming problem
Resumo:
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
We prove existence, uniqueness, and stability of solutions of the prescribed curvature problem (u'/root 1 + u'(2))' = au - b/root 1 + u'(2) in [0, 1], u'(0) = u(1) = 0, for any given a > 0 and b > 0. We also develop a linear monotone iterative scheme for approximating the solution. This equation has been proposed as a model of the corneal shape in the recent paper (Okrasinski and Plociniczak in Nonlinear Anal., Real World Appl. 13:1498-1505, 2012), where a simplified version obtained by partial linearization has been investigated.
Resumo:
The trajectory planning of redundant robots is an important area of research and efficient optimization algorithms are needed. The pseudoinverse control is not repeatable, causing drift in joint space which is undesirable for physical control. This paper presents a new technique that combines the closed-loop pseudoinverse method with genetic algorithms, leading to an optimization criterion for repeatable control of redundant manipulators, and avoiding the joint angle drift problem. Computer simulations performed based on redundant and hyper-redundant planar manipulators show that, when the end-effector traces a closed path in the workspace, the robot returns to its initial configuration. The solution is repeatable for a workspace with and without obstacles in the sense that, after executing several cycles, the initial and final states of the manipulator are very close.
Resumo:
This study addresses the optimization of rational fraction approximations for the discrete-time calculation of fractional derivatives. The article starts by analyzing the standard techniques based on Taylor series and Padé expansions. In a second phase the paper re-evaluates the problem in an optimization perspective by tacking advantage of the flexibility of the genetic algorithms.
Resumo:
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
This paper addresses the calculation of fractional order expressions through rational fractions. The article starts by analyzing the techniques adopted in the continuous to discrete time conversion. The problem is re-evaluated in an optimization perspective by tacking advantage of the degree of freedom provided by the generalized mean formula. The results demonstrate the superior performance of the new algorithm.
Resumo:
This paper studies the describing function (DF) of systems consisting in a mass subjected to nonlinear friction. The friction force is composed in three components namely, the viscous, the Coulomb and the static forces. The system dynamics is analyzed in the DF perspective revealing a fractional-order behaviour. The reliability of the DF method is evaluated through the signal harmonic content and the limit cycle prediction.
Resumo:
Dissertation submitted for a PhD degree in Electrical Engineering, speciality of Robotics and Integrated Manufacturing from the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
Num mercado cada vez mais competitivo, torna-se fundamental para as empresas produzirem mais com menos recursos, aumentando a eficiência interna, através da otimização dos seus processos. Neste contexto aparece o Lean Manufacturing, metodologia que tem como objetivo criar valor para os stakeholders, através da eliminação de desperdício na cadeia de valor. Este projeto descreve a análise e a formulação de soluções do processo de produção de um Módulo de Serviço, produto que faz parte do sistema elétrico de um elevador. Para análise do problema utilizamos técnicas e ferramentas lean, tais como, o value stream mapping (VSM), o diagrama de processo e o diagrama de spaghetti. Para formulação do problema usamos o value stream design (VSD), a metodologia 5S, o sistema Kanban e a criação de fluxo contínuo, através do conceito takt time, do sistema Pull, da definição do processo pacemaker, da programação nivelada (Heijunka), do conceito pitch time e da caixa de nivelamento (Heijunka Box). Com este projeto pretendemos demonstrar que a implementação de um fluxo unitário de peças através da filosofia Lean Manufacturing, acrescenta qualidade ao produto, cria flexibilidade, aumenta a produtividade, liberta áreas de produção, aumenta a segurança, reduz o custo com o stock e aumenta a motivação organizacional.
Resumo:
A stochastic programming approach is proposed in this paper for the development of offering strategies for a wind power producer. The optimization model is characterized by making the analysis of several scenarios and treating simultaneously two kinds of uncertainty: wind power and electricity market prices. The approach developed allows evaluating alternative production and offers strategies to submit to the electricity market with the ultimate goal of maximizing profits. An innovative comparative study is provided, where the imbalances are treated differently. Also, an application to two new realistic case studies is presented. Finally, conclusions are duly drawn.
Resumo:
A alta e crescente participação da energia eólica na matriz da produção traz grandes desafios aos operadores do sistema na gestão da rede e planeamento da produção. A incerteza associada à produção eólica condiciona os processos de escalonamento e despacho económico dos geradores térmicos, uma vez que a produção eólica efetiva pode ser muito diferente da produção prevista. O presente trabalho propõe duas metodologias de otimização do escalonamento de geradores térmicos baseadas em Programação Inteira Mista. Pretende-se encontrar soluções de escalonamento que minimizem as influências negativas da integração de energia eólica no sistema elétrico. Inicialmente o problema de escalonamento de geradores é formulado sem considerar a integração da energia eólica. Posteriormente foi considerada a penetração da energia eólica no sistema elétrico. No primeiro modelo proposto, o problema é formulado como um problema de otimização estocástico. Nesta formulação todos os cenários de produção eólica são levados em consideração no processo de otimização. No segundo modelo, o problema é formulado como um problema de otimização determinística. Nesta formulação, o escalonamento é feito para cada cenário de produção eólica e no fim determina-se a melhor solução por meio de indicadores de avaliação. Foram feitas simulações para diferentes níveis de reserva girante e os resultados obtidos mostraram que a alta participação da energia eólica na matriz da produção põe em causa a segurança e garantia de produção devido às características volátil e intermitente da produção eólica e para manter os mesmos níveis de segurança é preciso dispor no sistema de capacidade reserva girante suficiente capaz de compensar os erros de previsão.
Resumo:
In this paper, a mixed-integer quadratic programming approach is proposed for the short-term hydro scheduling problem, considering head-dependency, discontinuous operating regions and discharge ramping constraints. As new contributions to earlier studies, market uncertainty is introduced in the model via price scenarios, and risk aversion is also incorporated by limiting the volatility of the expected profit through the conditional value-at-risk. Our approach has been applied successfully to solve a case Study based on one of the main Portuguese cascaded hydro systems, requiring a negligible computational time.
Resumo:
O presente trabalho foi realizado com o intuito de resolver o problema de alocação de vigilantes a exames do Instituto Superior de Engenharia do Porto, no departamento de Engenharia Mecânica. O modelo apresentado faz a atribuição das vigilâncias de uma forma hierárquica, utilizando vários critérios, desde a regência da unidade curricular até à simples vigilância. Devido ao facto de estar implementado informaticamente, apresenta reduzidos tempos na formulação e obtenção de uma solução, o que o torna uma boa ferramenta para a criação de cenários alternativos. Em suma, o modelo proposto neste trabalho apresenta soluções de melhor qualidade, em que a distribuição de afetações é proporcional entre os docentes, e o seu tempo de obtenção é muito reduzido em comparação com a alternativa atual.
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.