943 resultados para Industry partnered projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The expectation to integrate sustainability aspects (social, environmental, and economic success) into the design, delivery, and operation of infrastructure assets is growing rapidly and globally. There are now several tools and frameworks available to benchmark and measure sustainable performance of infrastructure projects and assets. This paper briefly describes the infrastructure sustainability (IS) rating tool developed by the Australian Green Infrastructure Council (AGIC) that was launched in February 2012. This tool evaluates sustainability initiatives and potential environmental, social, and economic impacts of infrastructure projects and assets. The rating tool provides the following benefits to industry: a common national language for sustainability; a vehicle for consistent application and evaluation of sustainability in tendering processes; assists in scoping whole-of-life sustainability risks, enabling smarter solutions that reduce risks and costs; fosters resource efficiency and waste reduction, reducing costs; fosters innovation and continuous improvement in sustainability outcomes; and builds an organization’s credentials and reputation in its approach to sustainability. The infrastructure types covered by this tool include transport, energy, water, and communication. The key themes of sustainability evaluation will be briefly presented in this paper, and they include management and governance; use of resources; emissions, pollution, and waste; ecology; people and place; and innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study models the joint production of desirable and undesirable output production (that is, CO2 emissions) of airlines. The Malmquist–Luenberger productivity index is employed to measure productivity growth when undesirable output production is incorporated into the production model. The results show that pollution abatement activities of airlines lowers productivity growth, which suggests that the traditional approach of measuring productivity growth, which ignores CO2 emissions, overstates ‘true’ productivity growth. The reliability of the results is also tested and verified using confidence intervals based on bootstrapping.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In making this submission, we suggest that Australia learn from the experiences of other jurisdictions, and avoid some of the mistakes that have been made. In particular, this involves: * Ensuring that adequate information is available to evaluate the success of the scheme * Ensuring that notices sent to consumers provide full and accurate information that helps them understand their rights and options * Limiting the potential abuse of the system, and particularly attempts to intimidate consumers into paying unfair penalties through ‘speculative invoicing’ * Avoiding the potential for actual or perceived bias in the scheme’s oversight body

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ability to estimate the expected Remaining Useful Life (RUL) is critical to reduce maintenance costs, operational downtime and safety hazards. In most industries, reliability analysis is based on the Reliability Centred Maintenance (RCM) and lifetime distribution models. In these models, the lifetime of an asset is estimated using failure time data; however, statistically sufficient failure time data are often difficult to attain in practice due to the fixed time-based replacement and the small population of identical assets. When condition indicator data are available in addition to failure time data, one of the alternate approaches to the traditional reliability models is the Condition-Based Maintenance (CBM). The covariate-based hazard modelling is one of CBM approaches. There are a number of covariate-based hazard models; however, little study has been conducted to evaluate the performance of these models in asset life prediction using various condition indicators and data availability. This paper reviews two covariate-based hazard models, Proportional Hazard Model (PHM) and Proportional Covariate Model (PCM). To assess these models’ performance, the expected RUL is compared to the actual RUL. Outcomes demonstrate that both models achieve convincingly good results in RUL prediction; however, PCM has smaller absolute prediction error. In addition, PHM shows over-smoothing tendency compared to PCM in sudden changes of condition data. Moreover, the case studies show PCM is not being biased in the case of small sample size.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Joint ventures are formed and dissolved regularly in the mining industry. What impact do such changes have on the viability of mineral exploration projects? The Australian Centre for Entrepreneurship Research (ACE) has taken 9 years' worth of data (2002-2011) on 1,025 joint ventures in the Australasian mining industry and studied trends in fomentation, dissolution, and reconfiguration and how they impact project outcomes. This research is generously sponsored by the Queensland Exploration Council (QEC) and the Australian Research Council (ARC).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: While the global education debate remains focused on graduate skills and employability, the absence of a shared language between student, academic and industry stakeholder groups means that defining industry skills requirements is both essential and difficult. The aim of this study was to assess graduate skills requirements in a knowledge intensive industry from a demand perspective as distinct from a curriculum (supply) viewpoint. Design/methodology/approach: Skills items were derived from a breadth of disciplines across academic, policy and industry literature. CEOs and senior managers in the innovation and commercialisation industry were surveyed regarding perceptions of skills in graduates and skills in demand by the firm. Two rounds of exploratory factor analyses were undertaken to examine employers’ perceptions of the skills gap. Findings: First order analysis resolved 10 broad constructs that represent cognitive, interpersonal and intrapersonal skills domains as applied in this industry. Knowledge, leadership and interprofessional collaboration feature as prominent skills. Second order analysis revealed employers’ perceptions of graduate skills specifically centre on organisational fit and organisational success. An over-arching theme relates to performance of the individual in organisations. Research limitations/implications: Our findings suggest that the discourse on employability and the design of curriculum need to shift from instilling lists of skills towards enabling graduates to perform in a diversity of workplace contexts and expectations centred on organisational purpose. Originality/value: In contrast to the heterogeneous nature of industry surveys, we targeted a homogenous sector that is representative of knowledge intensive industries. This study contributes to the broader stakeholder dialogue of the value and application of graduate skills in this and other industry sectors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is strong evidence across the media that humanity has finally come to recognize the certainty and imminence of a global environmental crisis due to man-triggered ecological alterations. This widespread recognition of what is happening around us has matured even further as studies acknowledging that everything on Earth is interconnected begin to mount across various branches of learning. The appreciation of this simple linear and two-dimensional relationship implies enormous consequences for economic and management studies, as alternative business models will eventually have to supersede the old practices that still govern major industry sectors (e.g. energy, cement, agriculture, automotive, pharmaceutical, etc.). This paper argues that traditional knowledge found in developing countries can sometimes harness the potential of sparking genuine alternatives to established business practices. With a focus on the most fundamental geochemical cycles on Earth − nitrogen, water, and carbon − and the primary resources they govern (soil, water, and air), three case studies are presented to illustrate how traditional knowledge in the context of GRI (Grassroots Innovation) projects can lead to challenge the dominant logic, when allowed to thrive in terms of adoption and scalability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On 19 June 2015, representatives from over 40 Australian research institutions gathered in Canberra to launch their Open Data Collections. The one day event, hosted by the Australian National Data Service (ANDS), showcased to government and a range of national stakeholders the rich variety of data collections that have been generated through the Major Open Data Collections (MODC) project. Colin Eustace attended the showcase for QUT Library and presented a poster that reflected the work that he and Jodie Vaughan generated through the project. QUT’s Blueprint 4, the University’s five-year institutional strategic plan, outlines the key priorities of developing a commitment to working in partnership with industry, as well as combining disciplinary strengths with interdisciplinary application. The Division of Technology, Information and Learning Support (TILS) has undertaken a number of Australian National Data Service (ANDS) funded projects since 2009 with the aim of developing improved research data management services within the University to support these strategic aims. By leveraging existing tools and systems developed during these projects, the Major Open Data Collection (MODC) project delivered support to multi-disciplinary collaborative research activities through partnership building between QUT researchers and Queensland government agencies, in order to add to and promote the discovery and reuse of a collection of spatially referenced datasets. The MODC project built upon existing Research Data Finder infrastructure (which uses VIVO open source software, developed by Cornell University) to develop a separate collection, Spatial Data Finder (https://researchdatafinder.qut.edu.au/spatial) as the interface to display the spatial data collection. During the course of the project, 62 dataset descriptions were added to Spatial Data Finder, 7 added to Research Data Finder and two added to Software Finder, another separate collection. The project team met with 116 individual researchers and attended 13 school and faculty meetings to promote the MODC project and raise awareness of the Library’s services and resources for research data management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

More creatives work outside the creative industries than inside them. Recent Australian Census data show that 52 per cent of creatives work outside of the core creative industries. These embedded creatives make up 2 per cent of manufacturing industry employees. There is little qualitative research into embedded creatives. This paper aims to address this by exploring the contribution of creative skills to manufacturing in Australia. Through four case studies of designers and marketing staff in lighting and car seat manufacturing companies, this paper demonstrates some of the work that embedded creatives undertake in the manufacturing industry and some of the ways that they contribute to innovation. The paper also considers perspectives embedded creatives bring to manufacturing and challenges involved in being a creative worker in a non-creative industry. This research is important to economic development issues, demonstrating some of the roles of key innovators in an important industry. This work also informs the education of creative industries students who will go on to contribute in a variety of industries. Furthermore, this research exemplifies one industry where employment is available to creatives outside of the creative industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Queensland Transport Industry Workplace Health Intervention project was a Participatory Action Research (PAR) project to investigate the effectiveness of workplace-based nutrition and physical activity health promotion interventions for truck drivers in transport industry workplaces in south-east Queensland. The project was conducted by a research team at the Queensland University of Technology (QUT), and was funded by the Queensland Government under the Healthier.Happier.Workplaces initiative.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.