Draglines are extremely large machines that are widely used in open-cut coal mines for overburden stripping. Since 1994 we have been working toward the development of a computer control system capable of automatically driving a dragline for a large portion of its operating cycle. This has necessitated the development and experimental evaluation of sensor systems, machines models, closed-loop control controllers, and an operator interface. This paper describes our steps toward the goal through scale-model and full-scale field experimentation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a study on the effectiveness of two forms of reinforced grout confining systems for hollow concrete block masonry. The systems considered are: (1) a layer of grout directly confining the unreinforced masonry, and (2) a layer of grout indirectly confining the unreinforced masonry through block shells. The study involves experimental testing and finite-element (FE) modeling of six diagonally loaded masonry panels containing the two confining systems. The failure mode, the ultimate load, and the load-deformation behaviors of the diagonally loaded panels were successfully simulated using the finite-element model. In-plane shear strength and stiffness of the masonry thus determined are used to evaluate some selected models of the confined masonry shear including the strut-and-tie model reported in the literature. The evaluated strut width is compared with the prediction of the FE model and then extended for rational prediction of the strength of confined masonry shear walls.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Identifying genetic variants influencing human brain structures may reveal new biological mechanisms underlying cognition and neuropsychiatric illness. The volume of the hippocampus is a biomarker of incipient Alzheimer's disease and is reduced in schizophrenia, major depression and mesial temporal lobe epilepsy. Whereas many brain imaging phenotypes are highly heritable, identifying and replicating genetic influences has been difficult, as small effects and the high costs of magnetic resonance imaging (MRI) have led to underpowered studies. Here we report genome-wide association meta-analyses and replication for mean bilateral hippocampal, total brain and intracranial volumes from a large multinational consortium. The intergenic variant rs7294919 was associated with hippocampal volume (12q24.22; N = 21,151; P = 6.70 × 10 -16) and the expression levels of the positional candidate gene TESC in brain tissue. Additionally, rs10784502, located within HMGA2, was associated with intracranial volume (12q14.3; N = 15,782; P = 1.12 × 10 -12). We also identified a suggestive association with total brain volume at rs10494373 within DDR2 (1q23.3; N = 6,500; P = 5.81 × 10 -7).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Enhancing NeuroImaging Genetics through Meta-Analysis (ENIGMA) Consortium is a collaborative network of researchers working together on a range of large-scale studies that integrate data from 70 institutions worldwide. Organized into Working Groups that tackle questions in neuroscience, genetics, and medicine, ENIGMA studies have analyzed neuroimaging data from over 12,826 subjects. In addition, data from 12,171 individuals were provided by the CHARGE consortium for replication of findings, in a total of 24,997 subjects. By meta-analyzing results from many sites, ENIGMA has detected factors that affect the brain that no individual site could detect on its own, and that require larger numbers of subjects than any individual neuroimaging study has currently collected. ENIGMA's first project was a genome-wide association study identifying common variants in the genome associated with hippocampal volume or intracranial volume. Continuing work is exploring genetic associations with subcortical volumes (ENIGMA2) and white matter microstructure (ENIGMA-DTI). Working groups also focus on understanding how schizophrenia, bipolar illness, major depression and attention deficit/hyperactivity disorder (ADHD) affect the brain. We review the current progress of the ENIGMA Consortium, along with challenges and unexpected discoveries made on the way.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction professional service (CPS) in the international arena has been very competitive despite that the industry is proliferating at a high rate. To excel in international business, CPS firms have the importance of building overseas competition strategies on a proper understanding of the international CPS (I-CPS) market. However, subject to borderless trade, information technology–based networking, global outsourcing, and changing forms of procurement, the I-CPS market structure has become more covert, intricate, and unstraightforward than before. Through examining business competition among top international design firms, this study aims to identify the attributes of the I-CPS market structure from two perspectives—concentration and turnover. Data from Engineering News-Record over the period 2001–2011 were collected to calculate market concentration ratios and turnover indices. The results show that I-CPS competition is characterized by atomism, much turbulence with a steady increase in competition intensity, and the predominant role of new entrants and exiting firms in market turnovers. The combination of concentration and turnover is found useful to address the attributes of the I-CPS market structure, which favors I-CPS firms to formulate international competition strategies in due ways.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents the results of a research project aimed at examining the capabilities and challenges of two distinct but not mutually exclusive approaches to in-service bridge assessment: visual inspection and installed monitoring systems. In this study, the intended functionality of both approaches was evaluated on its ability to identify potential structural damage and to provide decision-making support. Inspection and monitoring are compared in terms of their functional performance, cost, and barriers (real and perceived) to implementation. Both methods have strengths and weaknesses across the metrics analyzed, and it is likely that a hybrid evaluation technique that adopts both approaches will optimize efficiency of condition assessment and ultimately lead to better decision making.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper reviews current design standards and test methods for blast-resistant glazing design and compares a typical design outcome with that from comprehensive finite-element (FE) analysis. Design standards are conservative and are limited to the design of relatively small glazed panels. Standard test methods are expensive, create environmental pollution, and can classify the hazard ratings of only smaller glazed panels. Here the design of a laminated glass (LG) panel is carried out according to an existing design standard, and then its performance is examined using comprehensive FE modeling and analysis. Finite-element results indicate that both glass panes crack, the interlayer yields with little damage, and the sealant joints do not fail for the designed blast load. This failure pattern satisfies some of the requirements for minimal hazard rating in the design standard. It is evident that interlayer thickness and material properties are important during the post-crack stage of an LG panel, but they are not accounted for in the design standards. The new information generated in this paper will contribute toward an enhanced blast design of LG panels.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper investigates the influence of structural sealant joints on the blast performance of laminated glass (LG) panels, using a comprehensive numerical procedure. A parametric study was carried out by varying the width, thickness and the Young’s modulus (E) of the structural silicone sealant joints and the behavior of the LG panel was studied under two different blast loads. Results show that these parameters influence the blast response of LG panels, especially under the higher blast load. Sealant joints that are thicker, have smaller widths and lower E values increase the flexibility at the supports and hence increase the energy absorption of the LG panel while reducing the support reactions. Results also confirmed that sealant joints designed according to current standards perform well under blast loads. Modeling techniques presented in this paper could be used to complement and supplement the guidance in existing design standards. The new information generated in this paper will contribute towards safer and more economical designs of entire facade systems including window glazing, frames and supporting structures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Employees’ safety climate perceptions dictate their safety behavior because individuals act based on their perceptions of reality. Extensive empirical research in applied psychology has confirmed this relationship. However, rare efforts have been made to investigate the factors contributing to a favorable safety climate in construction research. As an initial effort to address the knowledge gap, this paper examines factors contributing to a psychological safety climate, an operationalization of a safety climate at the individual level, and, hence, the basic element of a safety climate at higher levels. A multiperspective framework of contributors to a psychological safety climate is estimated by a structural equation modeling technique using individual questionnaire responses from a random sample of construction project personnel. The results inform management of three routes to psychological safety climate: a client’s proactive involvement in safety management, a workforce-friendly workplace created by the project team, and transformational supervisors’ communication about safety matters with the workforce. This paper contributes to the field of construction engineering and management by highlighting a broader contextual influence in a systematic formation of psychological safety climate perceptions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fire safety plays a vital role in building design because appropriate level of fire safety is important to safeguard lives and property. Cold-formed steel channel sections along with fire-resistive plasterboards are used to construct light-gauge steel frame (LSF) floor systems to provide adequate fire resistance ratings (FRR). It is common practice to use lipped channel sections (LCS) as joists in LSF floor systems, and past research has only considered such systems. This research focuses on adopting improved joist sections such as hollow flange channel (HFC) sections to improve the structural performance and FRR of cold-formed LSF floor systems under standard fire conditions. The structural and thermal performances of LSF floor systems made of a welded HFC, LiteSteel Beams (LSB), with different plasterboard and insulation configurations, were investigated using four full-scale fire tests under standard fires. These fire tests showed that the new LSF floor system with LSB joists improved the FRR in comparison to that of conventional LCS joists. Fire tests have provided valuable structural and thermal performance data of tested floor systems that included time-temperature profiles and failure times, temperatures, and modes. This paper presents the details of the fire tests conducted in this study and their results along with some important findings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To meet clients/owners’ multidimensional and changing requirements, construction management consultants (CMCs) ought to possess a diverse and dynamic knowledge structure. In China, although the population of CMCs has grown to the point of their being indispensable in the industry, their knowledge structure has not been explored explicitly. The study presented in this paper investigated this by first conducting a comprehensive content analysis of the curricula of the highest ranked construction management university courses in China. This was followed by in-depth interviews with experts, resulting in the identification of 22 main knowledge areas that can be grouped into technology, economy, management and law. A questionnaire survey was then conducted among 115 experienced CMCs to evaluate the current level of knowledge in these areas together with their importance and need-for-improvement. The main findings demonstrate the significance of the identified 22 knowledge areas, and they also need substantial improvement in practice. The research has practical implications for China's CMCs to develop necessary knowledge and the extent to which they need to be improved to provide a better quality of services in future.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.