903 resultados para Regular Polygon


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: Whilst the benefits of physical activity in preventing progression from impaired glucose tolerance to overt diabetes in older adults are well recognised, it is not clear which strategies may prevent progression to overt diabetes in women with recent gestational diabetes. We sought to devise and pilot test a convenient, home based exercise program with telephone support, suited to the early post partum period. Twenty eight women with recent gestational diabetes were enrolled six weeks post partum into a 12 week randomised controlled trial of Usual Care ("UC" Controls (n= 13)) vs. Supported Care ("SC" individualised exercise program with regular telephone support (n= 15)). Findings: Baseline characteristics for the whole cohort at six weeks post partum (Mean ± SD) were Age 33 ± 4 years, Weight 80 ± 20 kg and Body Mass Index (BMI) 30.0 ± 9.7 kg / m2. The primary outcome, planned physical activity, increased by Median (Range) 60 (0-540) mins/wk in the SC group vs. 0 (0-580) mins/wk in the UC group (p = 0.234, Mann Whitney U test). The change in planned physical activity predominantly comprised planned walking. Body weight, BMI, waist circumference, % body fat (measured by bioimpedance), fasting glucose and insulin did not change significantly over time in either group. Conclusions: The intervention designed to increase physical activity in post partum women with previous gestational diabetes was feasible. However, no evidence to suggest that this type of program provides any measurable improvement in metabolic or biometric parameters over a three month post partum follow up was observed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.