993 resultados para Forest View


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study focused on the different ways that forest-related rights can be devolved to the local level according to the current legal frameworks in Laos, Nepal, Vietnam, Kenya, Mozambique and Tanzania. The eleven case studies represented the main ways in which forest-related rights can be devolved to communities or households in these countries. The objectives of this study were to 1) analyse the contents and extent of forest-related rights that can be devolved to the local level, 2) develop an empirical typology that represents the main types of devolution, and 3) compare the cases against a theoretical ideal type to assess in what way and to what extent the cases are similar to or differ from the theoretical construct. Fuzzy set theory, Qualitative Comparative Analysis and ideal type analysis were used in analysing the case studies and in developing an empirical typology. The theoretical framework, which guided data collection and analyses, was based on institutional economics and theories on property rights, common pool resources and collective action. On the basis of the theoretical and empirical knowledge, the most important attributes of rights were defined as use rights, management rights, exclusion rights, transfer rights and the duration and security of the rights. The ideal type was defined as one where local actors have been devolved comprehensive use rights, extensive management rights, rights to exclude others from the resource and rights to transfer these rights. In addition, the rights are to be secure and held perpetually. The ideal type was used to structure the analysis and as a tool against which the cases were analysed. The contents, extent and duration of the devolved rights varied greatly. In general, the results show that devolution has mainly meant the transfer of use rights to the local level, and has not really changed the overall state control over forest resources. In most cases the right holders participate, or have a limited role in the decision making regarding the harvesting and management of the resource. There was a clear tendency to devolve the rights to enforce rules and to monitor resource use and condition more extensively than the powers to decide on the management and development of the resource. The empirical typology of the cases differentiated between five different types of devolution. The types can be characterised by the devolution of 1) restricted use and control rights, 2) extensive use rights but restricted control rights, 3) extensive rights, 4) insecure, short term use and restricted control rights, and 5) insecure extensive rights. Overall, the case studies conformity to the ideal type was very low: only two cases were similar to the ideal type, all other cases differed considerably from the ideal type. The restricted management rights were the most common reason for the low conformity to the ideal type (eight cases). In three cases, the short term of the rights, restricted transfer rights, restricted use rights or restricted exclusion rights were the reason or one of the reasons for the low conformity to the ideal type. In two cases the rights were not secure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The forest simulator is a computerized model for predicting forest growth and future development as well as effects of forest harvests and treatments. The forest planning system is a decision support tool, usually including a forest simulator and an optimisation model, for finding the optimal forest management actions. The information produced by forest simulators and forest planning systems is used for various analytical purposes and in support of decision making. However, the quality and reliability of this information can often be questioned. Natural variation in forest growth and estimation errors in forest inventory, among other things, cause uncertainty in predictions of forest growth and development. This uncertainty stemming from different sources has various undesirable effects. In many cases outcomes of decisions based on uncertain information are something else than desired. The objective of this thesis was to study various sources of uncertainty and their effects in forest simulators and forest planning systems. The study focused on three notable sources of uncertainty: errors in forest growth predictions, errors in forest inventory data, and stochastic fluctuation of timber assortment prices. Effects of uncertainty were studied using two types of forest growth models, individual tree-level models and stand-level models, and with various error simulation methods. New method for simulating more realistic forest inventory errors was introduced and tested. Also, three notable sources of uncertainty were combined and their joint effects on stand-level net present value estimates were simulated. According to the results, the various sources of uncertainty can have distinct effects in different forest growth simulators. The new forest inventory error simulation method proved to produce more realistic errors. The analysis on the joint effects of various sources of uncertainty provided interesting knowledge about uncertainty in forest simulators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Originally from Asia, Rubus niveus has become one of the most widespread invasive plant species in the Galapagos Islands. It has invaded open vegetation, shrubland and forest alike. It forms dense thickets up to 4 m high, appearing to displace native vegetation, and threaten the integrity of several native communities. This study used correlation analysis between a R. niveus cover gradient and a number of biotic (vascular plant species richness, cover and vegetation structure) and abiotic (light and soil properties) parameters to help understand possible impacts in one of the last remaining fragments of the Scalesia forest in Santa Cruz Island, Galapagos. Higher cover of R. niveus was associated with significantly lower native species richness and cover, and a different forest structure. Results illustrated that 60% R. niveus cover could be considered a threshold for these impacts. We suggest that a maximum of 40% R. niveus cover could be a suitable management target.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Socio-economic and demographic changes among family forest owners and demands for versatile forestry decision aid motivated this study, which sought grounds for owner-driven forest planning. Finnish family forest owners’ forest-related decision making was analyzed in two interview-based qualitative studies, the main findings of which were surveyed quantitatively. Thereafter, a scheme for adaptively mixing methods in individually tailored decision support processes was constructed. The first study assessed owners’ decision-making strategies by examining varying levels of the sharing of decision-making power and the desire to learn. Five decision-making modes – trusting, learning, managing, pondering, and decisive – were discerned and discussed against conformable decision-aid approaches. The second study conceptualized smooth communication and assessed emotional, practical, and institutional boosters of and barriers to such smoothness in communicative decision support. The results emphasize the roles of trust, comprehension, and contextual services in owners’ communicative decision making. In the third study, a questionnaire tool to measure owners’ attitudes towards communicative planning was constructed by using trusting, learning, and decisive dimensions. Through a multivariate analysis of survey data, three owner groups were identified as fusions of the original decision-making modes: trusting learners (53%), decisive learners (27%), and decisive managers (20%). Differently weighted communicative services are recommended for these compound wishes. The findings of the studies above were synthesized in a form of adaptive decision analysis (ADA), which allows and encourages the decision-maker (owner) to make deliberate choices concerning the phases of a decision aid (planning) process. The ADA model relies on adaptability and feedback management, which foster smooth communication with the owner and (inter-)organizational learning of the planning institution(s). The summarized results indicate that recognizing the communication-related amenity values of family forest owners may be crucial in developing planning and extension services. It is therefore recommended that owners, root-level planners, consultation professionals, and pragmatic researchers collaboratively continue to seek stable change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Phosphorus (P) retention properties of soils typical for boreal forest, i.e. podzolic soil and peat soils, vary significantly, but the range of this variation has not been sufficiently documented. To assess the usefulness of buffer zones used in forestry in removing P from the discharge by chemical sorption in soil, and to estimate the risk of P leaching after forestry operations, more data is needed on soil P retention properties. P retention properties of soils were studied at clear-cut areas, unharvested buffer zones adjoining the clear-cut and at peatland buffer zone areas. Desorption-sorption isotherms were determined for the humus layer, the mineral soil horizons E, B and C of the Podzol profile and for the surface layer peat (0-15 cm) and the subsurface layer peat (15-30 cm). The efficiency of buffer zones in retaining P was studied at six peatland buffer zone areas by adding P-containing solute in the inflow. A tracer study was conducted at one of the buffer zone areas to determine the allocation of the added P in soil and vegetation. Measured sorption or desorption rather than parameter values of fitted sorption equations described P desorption and sorption behaviour in soil. The highest P retention efficiency was in the B horizon and consequently, if contact occurred or was established between the soluble P in the water and the soil B horizon, the risk of P leaching was low. Humus layer was completely incapable of retaining P after clear-cutting. In the buffer zones, the decrease in P retention properties in the humus layer and the low amount of P sorbed by it indicated that the importance of the layer in the functioning of buffer zones is low. The peatland buffer zone areas were efficient in retaining soluble P from inflow. P sorption properties of the peat soil at the buffer zone areas varied largely but the contribution of P sorption in the peat was particularly important during high flow in spring, when the vegetation was not fully developed. Factors contributing to efficient P retention were large buffer size and low hydrological load whereas high hydrological load combined with the formation of preferential flow paths, especially during early spring or late autumn was disadvantageous. However, small buffer zone areas, too, may be efficient in reducing P load.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Scots pine (Pinus sylvestris L.) and Norway spruce (Picea abies (L.) Karst.) forests dominate in Finnish Lapland. The need to study the effect of both soil factors and site preparation on the performance of planted Scots pine has increased due to the problems encountered in reforestation, especially on mesic and moist, formerly spruce-dominated sites. The present thesis examines soil hydrological properties and conditions, and effect of site preparation on them on 10 pine- and 10 spruce-dominated upland forest sites. Finally, the effects of both the site preparation and reforestation methods, and soil hydrology on the long-term performance of planted Scots pine are summarized. The results showed that pine and spruce sites differ significantly in their soil physical properties. Under field capacity or wetter soil moisture conditions, planted pines presumably suffer from excessive soil water and poor soil aeration on most of the originally spruce sites, but not on the pine sites. The results also suggested that site preparation affects the soil-water regime and thus prerequisites for forest growth over two decades after site preparation. High variation in the survival and mean height of planted pine was found. The study suggested that on spruce sites, pine survival is the lowest on sites that dry out slowly after rainfall events, and that height growth is the fastest on soils that reach favourable aeration conditions for root growth soon after saturation, and/or where the average air-filled porosity near field capacity is large enough for good root growth. Survival, but not mean height can be enhanced by employing intensive site preparation methods on spruce sites. On coarser-textured pine sites, site preparation methods don t affect survival, but methods affecting soil fertility, such as prescribed burning and ploughing, seem to enhance the height growth of planted Scots pines over several decades. The use of soil water content in situ as the sole criterion for sites suitable for pine reforestation was tested and found to be a relatively uncertain parameter. The thesis identified new potential soil variables, which should be tested using other data in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Department of Forest Resource Management in the University of Helsinki has in years 2004?2007 carried out so-called SIMO -project to develop a new generation planning system for forest management. Project parties are organisations doing most of Finnish forest planning in government, industry and private owned forests. Aim of this study was to find out the needs and requirements for new forest planning system and to clarify how parties see targets and processes in today's forest planning. Representatives responsible for forest planning in each organisation were interviewed one by one. According to study the stand-based system for managing and treating forests continues in the future. Because of variable data acquisition methods with different accuracy and sources, and development of single tree interpretation, more and more forest data is collected without field work. The benefits of using more specific forest data also calls for use of information units smaller than tree stand. In Finland the traditional way to arrange forest planning computation is divided in two elements. After updating the forest data to present situation every stand unit's growth is simulated with different alternative treatment schedule. After simulation, optimisation selects for every stand one treatment schedule so that the management program satisfies the owner's goals in the best possible way. This arrangement will be maintained in the future system. The parties' requirements to add multi-criteria problem solving, group decision support methods as well as heuristic and spatial optimisation into system make the programming work more challenging. Generally the new system is expected to be adjustable and transparent. Strict documentation and free source code helps to bring these expectations into effect. Variable growing models and treatment schedules with different source information, accuracy, methods and the speed of processing are supposed to work easily in system. Also possibilities to calibrate models regionally and to set local parameters changing in time are required. In future the forest planning system will be integrated in comprehensive data management systems together with geographic, economic and work supervision information. This requires a modular method of implementing the system and the use of a simple data transmission interface between modules and together with other systems. No major differences in parties' view of the systems requirements were noticed in this study. Rather the interviews completed the full picture from slightly different angles. In organisation the forest management is considered quite inflexible and it only draws the strategic lines. It does not yet have a role in operative activity, although the need and benefits of team level forest planning are admitted. Demands and opportunities of variable forest data, new planning goals and development of information technology are known. Party organisations want to keep on track with development. One example is the engagement in extensive SIMO-project which connects the whole field of forest planning in Finland.