902 resultados para national assessment
Resumo:
Existing widely known environmental assessment models, primarily those for Life Cycle Assessment of manufactured products and buildings, were reviewed to grasp their characteristics, since the past several years have seen a significant increase in interest and research activity in the development of building environmental assessment methods. Each method or tool was assessed under the headings of description, data requirement, end-use, assessment criteria (scale of assessment and scoring/ weighting system)and present status
Resumo:
This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.
Resumo:
The National survey was the third phase in an ongoing initiative to identify critical success factors in ICT mediated supply chains. This study has been designed to harness the tacit and explicit knowledge to be found on the subject from the widest range of appropriate sources. At its core is the assumption that, provided with the fullest list of candidate success factors, a representative sample of experienced industry-based practitioners will (with the aid of statistical analysis) reveal a set of critical success factors. A postal survey has been judged to be the most appropriate mechanism for achieving this outcome.
Resumo:
Under the Alien Tort Statute United States of America (“America”) Federal Courts have the jurisdiction to hear claims for civil wrongs, committed against non-American citizens, which were perpetrated outside America’s national borders. The operation of this law has confronted American Federal Courts with difficulties on how to manage conflicts between American executive foreign policy and judicial interpretations of international law. Courts began to pass judgment over conduct which was approved by foreign governments. Then in 2005 the American Supreme Court wound back the scope of the Alien Tort Statute. This article will review the problems with the expansion of the Alien Tort Statute and the reasons for its subsequent narrowing.
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
In 2008 the Australian Government embarked on the development of a National Curriculum. To date, announcements about development of learning areas in Phase 1 (English, mathematics, science and history) and Phase 2 (geography and languages) have been released. But where are the arts positioned? This article traces the advocacy strategy employed by Drama Australia and the National Advocates for Arts Education (NAAE) in the fight for the arts to be included in National Curriculum Board (NCB) timeline for development, trial and implementation.
Resumo:
This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.
Resumo:
A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology
Resumo:
With the current National Road Safety Strategy [1] coming to the end of its term, it is timely to consider ways in which the next iteration of this strategy can be enhanced. Strategic planning should be a cyclic process in which learning and adaptation are just as important as planning and implementation. It will always be the case that some actions are not as effective as expected, or that barriers to effective implementation will emerge. Rather than being setbacks, these are opportunities for learning about the validity of our assumptions. They are also opportunities for us to adapt to meet unanticipated or emerging challenges. One of the positive aspects of the implementation of the first and second National Road Safety Strategies has been the willingness of road safety agencies to critically assess progress and to identify where and how actions would be better focused. This has been reflected in the evolving nature of the periodic National Road Safety Action Plans. As the decade of the current Strategy reaches an end, there is a need to take this process further, and undertake a thorough critical evaluation of the Strategy development and implementation. While not an attempt to be exhaustive, the following article will identify some key priorities for consideration as part of this process.
Resumo:
This paper will report on the evaluation of a new undergraduate legal workplace unit, LWB421 Learning in Professional Practice. LWB421 was developed in response to the QUT’s strategic planning and a growing view that work experience is essential to developing the skills that law graduates need in order to be effective legal practitioners (Stuckey, 2007). Work integrated learning provides a context for students to develop their skills, to see the link between theory and practice and support students in making the transition from university to practice (Shirley, 2006). The literature in Australian legal education has given little consideration to the design of legal internship subjects (as distinct from legal clinic programs). Accordingly the design of placement subjects needs to be carefully considered to ensure alignment of learning objectives, learning tasks and assessment. Legal placements offer students the opportunity to develop their professional skills in practice, reflect on their own learning and job performance and take responsibility for their career development and planning. This paper will examine the literature relating to the design of placement subjects, particularly in a legal context. It will propose a collaborative model to facilitate learning and assessment of legal work placement subjects. The basis of the model is a negotiated learning contract between the student, workplace supervisor and academic supervisor. Finally the paper will evaluate the model in the context of LWB421. The evaluation will be based on data from surveys of students and supervisors and focus group sessions.
Resumo:
Australia has had many inquiries into teaching and teacher education over the last decade. Standards for teaching have been produced by national education systems with many state systems following suit. The Queensland College of Teachers (QCT) advocates ten professional teaching standards for teachers and preservice teachers. How can preservice teachers be measured against advocated professional standards? This study investigated 106 second-year preservice teachers’ perceptions of their development against the QCT standards. A pretest-posttest survey instrument was developed based on the QCT standards and administered to these preservice teachers before and after their science education coursework. Percentages, ANOVAs and t-tests were generated to analyse the results. Findings indicated that 22 of the 24 paired pretest-posttest items were highly significant (p<.001). Percentage increases ranged from as low as 27% in the pretest to as high as 97% in the posttest, yet, there were two items with lower significance (i.e., working in professional science education teams and supporting students’ participation in society). Understanding preservice teachers’ perceptions of their abilities to implement these standards may be a step towards the process of determining the achievement of teaching standards; however, more rigorous measurements will need to be developed for both teachers and preservice teachers. University coursework and related assessments can provide an indication of achieving these standards, especially authentic assessment of preservice teachers’ practices.
Resumo:
Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.
Resumo:
This paper provides an overview of a new framework for a design stage Building Environmental Assessment (BEA) tool and a discussion of strategic responses to existing tool issues and relative stakeholder requirements that lead to the development of this tool founded on new information and communication technology (ICT) related to developments in 3D CAD technology. After introducing the context of the BEA and some of their team’s new work the authors • Critique current BEA tool theory; • Review previous assessments of stakeholder needs; • Introduce a new framework applied to analyse such tools • Highlight and key results considering illustrative ICT capabilities and • Discuss their potential significance upon BEA tool stakeholders.