943 resultados para Tension loads


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The deregulation of electricity markets has diversified the range of financial transaction modes between independent system operator (ISO), generation companies (GENCO) and load-serving entities (LSE) as the main interacting players of a day-ahead market (DAM). LSEs sell electricity to end-users and retail customers. The LSE that owns distributed generation (DG) or energy storage units can supply part of its serving loads when the nodal price of electricity rises. This opportunity stimulates them to have storage or generation facilities at the buses with higher locational marginal prices (LMP). The short-term advantage of this model is reducing the risk of financial losses for LSEs in DAMs and its long-term benefit for the LSEs and the whole system is market power mitigation by virtually increasing the price elasticity of demand. This model also enables the LSEs to manage the financial risks with a stochastic programming framework.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In competitive electricity markets it is necessary for a profit-seeking load-serving entity (LSE) to optimally adjust the financial incentives offering the end users that buy electricity at regulated rates to reduce the consumption during high market prices. The LSE in this model manages the demand response (DR) by offering financial incentives to retail customers, in order to maximize its expected profit and reduce the risk of market power experience. The stochastic formulation is implemented into a test system where a number of loads are supplied through LSEs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Following the deregulation experience of retail electricity markets in most countries, the majority of the new entrants of the liberalized retail market were pure REP (retail electricity providers). These entities were subject to financial risks because of the unexpected price variations, price spikes, volatile loads and the potential for market power exertion by GENCO (generation companies). A REP can manage the market risks by employing the DR (demand response) programs and using its' generation and storage assets at the distribution network to serve the customers. The proposed model suggests how a REP with light physical assets, such as DG (distributed generation) units and ESS (energy storage systems), can survive in a competitive retail market. The paper discusses the effective risk management strategies for the REPs to deal with the uncertainties of the DAM (day-ahead market) and how to hedge the financial losses in the market. A two-stage stochastic programming problem is formulated. It aims to establish the financial incentive-based DR programs and the optimal dispatch of the DG units and ESSs. The uncertainty of the forecasted day-ahead load demand and electricity price is also taken into account with a scenario-based approach. The principal advantage of this model for REPs is reducing the risk of financial losses in DAMs, and the main benefit for the whole system is market power mitigation by virtually increasing the price elasticity of demand and reducing the peak demand.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The recent changes concerning the consumers’ active participation in the efficient management of load devices for one’s own interest and for the interest of the network operator, namely in the context of demand response, leads to the need for improved algorithms and tools. A continuous consumption optimization algorithm has been improved in order to better manage the shifted demand. It has been done in a simulation and user-interaction tool capable of being integrated in a multi-agent smart grid simulator already developed, and also capable of integrating several optimization algorithms to manage real and simulated loads. The case study of this paper enhances the advantages of the proposed algorithm and the benefits of using the developed simulation and user interaction tool.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Smart Grid environment allows the integration of resources of small and medium players through the use of Demand Response programs. Despite the clear advantages for the grid, the integration of consumers must be carefully done. This paper proposes a system which simulates small and medium players. The system is essential to produce tests and studies about the active participation of small and medium players in the Smart Grid environment. When comparing to similar systems, the advantages comprise the capability to deal with three types of loads – virtual, contextual and real. It can have several loads optimization modules and it can run in real time. The use of modules and the dynamic configuration of the player results in a system which can represent different players in an easy and independent way. This paper describes the system and all its capabilities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent changes of paradigm in power systems opened the opportunity to the active participation of new players. The small and medium players gain new opportunities while participating in demand response programs. This paper explores the optimal resources scheduling in two distinct levels. First, the network operator facing large wind power variations makes use of real time pricing to induce consumers to meet wind power variations. Then, at the consumer level, each load is managed according to the consumer preferences. The two-level resources schedule has been implemented in a real-time simulation platform, which uses hardware for consumer’ loads control. The illustrative example includes a situation of large lack of wind power and focuses on a consumer with 18 loads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The integration of the Smart Grid concept into the electric grid brings to the need for an active participation of small and medium players. This active participation can be achieved using decentralized decisions, in which the end consumer can manage loads regarding the Smart Grid needs. The management of loads must handle the users’ preferences, wills and needs. However, the users’ preferences, wills and needs can suffer changes when faced with exceptional events. This paper proposes the integration of exceptional events into the SCADA House Intelligent Management (SHIM) system developed by the authors, to handle machine learning issues in the domestic consumption context. An illustrative application and learning case study is provided in this paper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Gradually smart grids and smart meters are closer to the home consumers. Several countries has developed studies focused in the impacts arising from the introduction of these technologies and one of the main advantages are related to energy efficiency, observed through the awareness of the population on behalf of a more efficient consumption. These benefits are felt directly by consumers through the savings on electricity bills and also by the concessionaires through the minimization of losses in transmission and distribution, system stability, smaller loading during peak hours, among others. In this article two projects that demonstrate the potential energy savings through smart meters and smart grids are presented. The first performed in Korea, focusing on the installation of smart meters and the impact of use of user interfaces. The second performed in Portugal, focusing on the control of loads in a residence with distributed generation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Some of the properties sought in seismic design of buildings are also considered fundamental to guarantee structural robustness. Moreover, some key concepts are common to both seismic and robustness design. In fact, both analyses consider events with a very small probability of occurrence, and consequently, a significant level of damage is admissible. As very rare events,in both cases, the actions are extremely hard to quantify. The acceptance of limited damage requires a system based analysis of structures, rather than an element by element methodology, as employed for other load cases. As for robustness analysis, in seismic design the main objective is to guarantee that the structure survives an earthquake, without extensive damage. In the case of seismic design, this is achieved by guaranteeing the dissipation of energy through plastic hinges distributed in the structure. For this to be possible, some key properties must be assured, in particular ductility and redundancy. The same properties could be fundamental in robustness design, as a structure can only sustain significant damage if capable of distributing stresses to parts of the structure unaffected by the triggering event. Timber is often used for primary load‐bearing elements in single storey long‐span structures for public buildings and arenas, where severe consequences can be expected if one or more of the primary load bearing elements fail. The structural system used for these structures consists of main frames, secondary elements and bracing elements. The main frame, composed by columns and beams, can be seen as key elements in the system and should be designed with high safety against failure and under strict quality control. The main frames may sometimes be designed with moment resisting joints between columns and beams. Scenarios, where one or more of these key elements, fail should be considered at least for high consequence buildings. Two alternative strategies may be applied: isolation of collapsing sections and, provision of alternate load paths [1]. The first one is relatively straightforward to provide by deliberately designing the secondary structural system less strong and stiff. Alternatively, the secondary structural system and the bracing system can be design so that loss of capacity in the main frame does not lead to the collapse. A case study has been selected aiming to assess the consequences of these two different strategies, in particular, under seismic loads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The question of how interventions from the Competition Authority (CA) affect investment is not a straightforward one: a tougher competition policy might, by reducing the ability to exert market power, either stimulate firms to invest more to counter the restrictions on their actions, or make firms invest less because of the reduced ability to have a return on investment. This tension is illustrated using two models. In one model investment is own-cost-reducing whereas in the other investment is anti-competitive. Anti-competitive investments are defined as investments that increase competitors’ costs. In both models the optimal level of investment is reduced with a tougher competition policy. Furthermore, while in the case of an anti-competitive investment a tougher authority necessarily leads to lower prices, in the case of a cost- reducing investment the opposite may happen when the impact of the investment on cost is sufficiently high. Results for total welfare are ambiguous in the cost- reducing investment model, whereas in the anti-competitive investment model welfare unambiguously increases due to a tougher competition polic

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Com as variações e instabilidade dos preços do petróleo, assim como as políticas europeias para adoção de estratégias para o desenvolvimento sustentável, têm levado à procura de forma crescente de novas tecnologias e fontes de energia alternativas. Neste contexto, tem-se assistido a políticas energéticas que estimulam o aumento da produção e a utilização do gás natural, visto que é considerado uma fonte de energia limpa. O crescimento do mercado do gás natural implica um reforço significativo das redes de transporte deste combustível, quer ao nível do armazenamento e fornecimento, quer ao nível dos gasodutos e da sua gestão. O investimento em gasodutos de transporte implica grandes investimentos, que poderiam não ser remunerados da forma esperada, sendo um dos motivos para que exista em Portugal cinco distritos se veem privados deste tipo de infraestruturas. O transporte de gás natural acarreta custos elevados para os consumidores, tanto maiores quanto maior forem as quantidades de gás transacionadas e quanto maior for o percurso pelo gás natural percorrido. Assim assume especial importância a realização de um despacho de gás natural: quais as cargas que cada unidade de fornecimento de gás irá alimentar, qual a quantidade de gás natural que cada UFGs deve injetar na rede, qual o menor percurso possível para o fazer, o tipo de transporte que será utilizado? Estas questões são abordadas na presente dissertação, por forma a minimizar a função custo de transporte, diminuindo assim as perdas na rede de alta pressão e os custos de transporte que serão suportados pelos consumidores. A rede de testes adotada foi a rede nacional de transporte, constituída por 18 nós de consumos, e os tipos de transporte considerados, foram o transporte por gasoduto físico e o transporte através de gasoduto virtual – rotas de transporte rodoviário de gás natural liquefeito. Foram criados diversos cenários, baseados em períodos de inverno e verão, os diferentes cenários abrangeram de forma distinta as variáveis de forma a analisar os impactos que estas variáveis teriam no custo relativo ao transporte de gás natural. Para dar suporte ao modelo de despacho económico, foi desenvolvida uma aplicação computacional – Despacho_GN com o objetivo de despachar as quantidades de gás natural que cada UFG deveria injetar na rede, assim como apresentar os custos acumulados relativos ao transporte. Com o apoio desta aplicação foram testados diversos cenários, sendo apresentados os respectivos resultados. A metodologia elaborada para a criação de um despacho através da aplicação “Despacho_GN” demonstrou ser eficiente na obtenção das soluções, mostrando ser suficientemente rápida para realizar as simulações em poucos segundos. A dissertação proporciona uma contribuição para a exploração de problemas relacionados com o despacho de gás natural, e sugere perspectivas futuras de investigação e desenvolvimento.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Após o enquadramento da canoagem, como modalidade Olímpica, verificou-se um aumento significativo de estudos e pesquisas acerca da biomecânica da modalidade, o que contribuiu para uma diminuição dos tempos na competição. Contudo poucos foram os que se focaram nas forças desenvolvidas e aplicadas ao caiaque através do finca-pés, criado assim oportunidade de desenvolvimento de dispositivos para a medição das mesmas. Assim, o objectivo primordial é desenvolver um sistema experimental capaz de quantificar as forças geradas em cada um dos lados do finca-pés (esquerdo e direito). Este, deverá não só ser passível de se utilizar em caiaque ergómetro como também num caiaque de pista, permitido avaliar as forças aplicadas durante o ciclo de pagaiada, tanto em compressão como em tracção. A sua concepção baseou-se num modelo de finca-pés já existente, tornando-o compatível com os caiaques de competição mais comercializados, e permitindo que no futuro se possa utilizar na água, bastando para isso apenas possuir um caiaque e embarcar o sistema de medição. Este sistema experimental foi testado em caiaque ergómetro por 7 (sete) sujeitos com níveis distintos: seis homens (um atleta olímpico medalhado e cinco de nível nacional) e uma mulher (de nível de selecção Portuguesa) que, entre outros, realizaram um plano definido por 60s a uma frequência de 75 pagaiadas por minuto, seguido de uma intensa mudança de ritmo e força (Sprint). Após análise dos dados obtidos em cada um dos diferentes sujeitos, conseguimos identificar algumas das suas características, tais como: esforço assimétrico dos membros inferiores; utilização de forma heterogénea da fita do finca-pés; diferença de forças máximas aplicadas entre atletas (Ex.: para um atleta olímpico as forças medidas (Min; Max): Pé Esquerdo (- 444; 1087) N e Pé Direito (- 476; 1068) N); etc. Os resultados não só são bastante promissores como também são motivantes e congruentes com estudos anteriores, nomeadamente Begon et al. 2008 e Sturm 2010 e 2012. Finalmente, consegue-se afirmar, com segurança, que foram alcançados os objectivos propostos com a concepção deste dispositivo de medição de forças. Este permite caracterizar os esforços desenvolvidos no finca-pés por cada membro inferior, com ou sem a fita de suporte, possibilitando aos treinadores e atletas uma visão, para muitos desconhecida, das forças transmitidas e das suas assimetrias. No final, este conhecimento permitirá aos atletas melhorar o seu desempenho desportivo bem como facilitar a gestão desportiva, com base nos principais princípios mecânicos inerentes ao movimento dos atletas desde desporto Olímpico.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Os Transformadores de potência são máquinas de elevada importância ao nível dos Sistemas Elétricos de Energia (SEE) uma vez que são estas máquinas que possibilitam a interligação dos diferentes níveis de tensão da rede e a transmissão de energia elétrica em Corrente Alternada (CA). Geralmente, estas máquinas são de grandes dimensões e de elevado nível de complexidade construtiva. Caracterizam-se por possuírem períodos de vida útil bastante elevados (vinte a trinta anos) e preços elevados, o que conduz a um nível de exigência de fiabilidade muito elevada, uma vez que não e viável a existência de muitos equipamentos de reserva nos SEE. Com o objetivo de tentar maximizar o período de vida útil dos transformadores de potência e a sua fiabilidade, tenta-se, cada vez mais, implementar conceitos de manutenção preventiva a este tipo de máquinas. No entanto, a gestão da sua vida útil e extremamente complexa na medida em que, estas máquinas têm vários componentes cruciais e suscetiveis de originar falhas e, quase todos eles, encontram-se no interior de uma cuba. Desta forma, não e possível obter uma imagem do seu estado, em tempo real, sem colocar o transformador fora de serviço, algo que acarreta custos elevados. Por este motivo, desenvolveu-se uma técnica que permite obter uma indicação do estado do transformador, em tempo real, sem o retirar de serviço, colhendo amostras do óleo isolante e procedendo a sua análise físico-química e Analise Gases Dissolvidos (DGA). As análises aos óleos isolantes tem vindo a adquirir uma preponderância muito elevada no diagnóstico de falhas e na analise do estado de conservação destes equipamentos tendo-se desenvolvido regras para interpretação dos parâmetros dos óleos com carácter normativo. Considerando o conhecimento relativo a interpretação dos ensaios físico-químicos e DGA ao oleol, e possível desenvolver ferramentas capazes de otimizar essas mesmas interpretações e aplicar esse conhecimento no sentido de prever a sua evolução, assim como o surgimento de possíveis falhas em transformadores, para assim otimizar os processos de manutenção. Neste campo as Redes Neuronais Artificiais (RNAs) têm um papel fundamental

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A presente tese surgiu da cooperação entre a empresa Semog Racing e o Instituto Superior de Engenharia do Porto, no âmbito da unidade curricular de DPEST, englobado no 2º ano do Mestrado de Engenharia Mecânica, ramo de Construções Mecânicas. Esta dissertação tem como objetivo principal, o projeto de um novo centro de roda para substituir o existente num veículo de competição da Semog Racing. Este centro deverá ser dimensionado para suportar o peso do veículo e os esforços transmitidos à roda. Pretende-se igualmente que o novo modelo apresente um design apelativo e um baixo custo de produção para poder vir ser a comercializado. Na primeira fase, será estudado o centro de roda original fornecido pela Semog Racing. Este estudo engloba a modelação do componente através do software SolidWorks® e uma fase de simulações para diferentes condições de carregamento. O estudo será complementado com a realização de ensaios experimentais para validação do modelo numérico. A segunda fase é dedicada ao desenvolvimento do novo modelo de centro de roda, focando as características mecânicas e o design. Este tem como base o estudo numérico realizado para a roda original, tendo sempre como objetivo final garantir que o novo centro de roda cumpra todos os requisitos. O caminho seguido no processo de otimização é suportado em simulações numéricas pelo método dos elementos finitos, o qual permite aferir quais os pontos críticos a corrigir. No final, será apresentado um novo modelo de centro de roda capaz de suportar as cargas previstas de serviço, que apresente um baixo custo de fabrico e design apelativo.