996 resultados para track survey
Resumo:
Research on the impact of Information Systems (IS) reported in both academic literature and popular press has reported confounding results. Some studies have reported encouraging results of IS, while others have reported nil or detrimental results. The contradictory results of these research studies can be partially attributed to the weaknesses in survey instruments. In an attempt to increase the validity of conclusions of IS assessment studies, survey instrument design should follow a rigorous and scientific procedure. This paper illustrates key validity and reliability issues in measuring Information Systems performance, using examples from a study designed to assess Enterprise Resource Planning systems success. The article emphasizes on the importance of the survey method and the theoretical considerations of item derivation, scale development and item evaluation. Examples are provided from the ERP assessment study to supplement the readers understanding of the theoretical concepts of survey design.
Resumo:
This paper focuses on the development and delivery of a core construction management (CM) unit, which forms the capstone of a four-unit CM stream in an undergraduate programme in the Faculty of Built Environment and Engineering at the Queensland University of Technology. UDB410 (Construction Management) is a final year unit that consolidates skills students have learned throughout their degree, hopefully graduating them as work-ready construction managers. It was developed in consultation with the Queensland Chapter of the Australian Institute of Building (AIB) and is a final year unit in the undergraduate Bachelor of Urban Development (CM) course. The unit uses various tools such as the OSIRIS business database (Bureau van Dijk Electronic Publishing, 2009), the AROUSAL (UK Version) construction business simulation (Lansley, 2009) and the Denison Organisational Culture Survey (Denison, 2000) to facilitate the development of skills in managing a construction company. The objectives of the paper are: • To track the rationale and development of the UDB410 unit sand describe the way in which this final year unit integrates learning from other parts of the course within which it is located as well as capping-off the CM stream of core units; • To highlight the difficulties of blending a balance of technology and management in a single unit; and • To explain how partnering with the construction industry benefited the learning quality of the unit.
Resumo:
The National survey was the third phase in an ongoing initiative to identify critical success factors in ICT mediated supply chains. This study has been designed to harness the tacit and explicit knowledge to be found on the subject from the widest range of appropriate sources. At its core is the assumption that, provided with the fullest list of candidate success factors, a representative sample of experienced industry-based practitioners will (with the aid of statistical analysis) reveal a set of critical success factors. A postal survey has been judged to be the most appropriate mechanism for achieving this outcome.
Resumo:
This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.