924 resultados para software project
Resumo:
Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability
Resumo:
Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.
Resumo:
This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.
Resumo:
What does it mean when we design for accessibility, inclusivity and "dissolving boundaries" -- particularly those boundaries between the design philosophy, the software/interface actuality and the stated goals? This paper is about the principles underlying a research project called 'The Little Grey Cat engine' or greyCat. GreyCat has grown out of our experience in using commercial game engines as production environments for the transmission of culture and experience through the telling of individual stories. The key to this endeavour is the potential of the greyCat software to visualize worlds and the manner in which non-formal stories are intertwined with place. The apparently simple dictum of "show, don't tell" and the use of 3D game engines as a medium disguise an interesting nexus of problematic issues and questions, particularly in the ramifications for cultural dimensions and participatory interaction design. The engine is currently in alpha and the following paper is its background story. In this paper we discuss the problematic, thrown into sharp relief by a particular project, and we continue to unpack concepts and early designs behind the greyCat itself.
Resumo:
Decisions made in the earliest stage of architectural design have the greatest impact on the construction, lifecycle cost and environmental footprint of buildings. Yet the building services, one of the largest contributors to cost, complexity, and environmental impact, are rarely considered as an influence on the design at this crucial stage. In order for efficient and environmentally sensitive built environment outcomes to be achieved, a closer collaboration between architects and services engineers is required at the outset of projects. However, in practice, there are a variety of obstacles impeding this transition towards an integrated design approach. This paper firstly presents a critical review of the existing barriers to multidisciplinary design. It then examines current examples of best practice in the building industry to highlight the collaborative strategies being employed and their benefits to the design process. Finally, it discusses a case study project to identify directions for further research.
Resumo:
Aims: To describe a local data linkage project to match hospital data with the Australian Institute of Health and Welfare (AIHW) National Death Index (NDI) to assess longterm outcomes of intensive care unit patients. Methods: Data were obtained from hospital intensive care and cardiac surgery databases on all patients aged 18 years and over admitted to either of two intensive care units at a tertiary-referral hospital between 1 January 1994 and 31 December 2005. Date of death was obtained from the AIHW NDI by probabilistic software matching, in addition to manual checking through hospital databases and other sources. Survival was calculated from time of ICU admission, with a censoring date of 14 February 2007. Data for patients with multiple hospital admissions requiring intensive care were analysed only from the first admission. Summary and descriptive statistics were used for preliminary data analysis. Kaplan-Meier survival analysis was used to analyse factors determining long-term survival. Results: During the study period, 21 415 unique patients had 22 552 hospital admissions that included an ICU admission; 19 058 surgical procedures were performed with a total of 20 092 ICU admissions. There were 4936 deaths. Median follow-up was 6.2 years, totalling 134 203 patient years. The casemix was predominantly cardiac surgery (80%), followed by cardiac medical (6%), and other medical (4%). The unadjusted survival at 1, 5 and 10 years was 97%, 84% and 70%, respectively. The 1-year survival ranged from 97% for cardiac surgery to 36% for cardiac arrest. An APACHE II score was available for 16 877 patients. In those discharged alive from hospital, the 1, 5 and 10-year survival varied with discharge location. Conclusions: ICU-based linkage projects are feasible to determine long-term outcomes of ICU patients
Resumo:
The Pedestrian Interaction Patch Project (PIPP) seeks to exert influence over and encourage abnormal pedestrian behavior. By placing an unadvertised (and non recording) interactive video manipulation system and projection source in a high traffic public area, the PIPP allows pedestrians to privately (and publically) re-engage with a previously inactive physical environment, like a commonly used walkway or corridor. This system, the results of which are projected in real time on the architectural surface, inadvertently provides pedestrians with questions around preconceived notions of self and space. In an attempt to re-activate our relationship with the physical surrounds we occupy each day the PIPP creates a new set of memories to be recalled as we re-enter known environments once PIPP has moved on and as such re-enlivens our relationship with the everyday architecture we stroll past everyday. The PIPP environment is controlled using the software program Isadora, devised by Mark Coniglio at Troika Ranch, and contains a series of video manipulation patches that are designed to not only grab the pedestrians attention but to also encourage a sense of play and interaction between the architecture, the digital environment, the initially unsuspecting participant(s) and the pedestrian audience. The PIPP was included as part of the planned walking tour for the “Playing in Urban Spaces” seminar day, and was an installation that ran for the length of the symposium in a reclaimed pedestrian space that was encountered by both the participants and general public during the course of the day long event. Ideally once discovered PIPP encouraged pedestrians to return through the course of the seminar day to see if the environmental patches had changed or altered, and changed their standard route to include the PIPP installation or to avoid it, either way, encouraging an active response to the pathways normally traveled or newly discovered each day.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
Background: An estimated 285 million people worldwide have diabetes and its prevalence is predicted to increase to 439 million by 2030. For the year 2010, it is estimated that 3.96 million excess deaths in the age group 20-79 years are attributable to diabetes around the world. Self-management is recognised as an integral part of diabetes care. This paper describes the protocol of a randomised controlled trial of an automated interactive telephone system aiming to improve the uptake and maintenance of essential diabetes self-management behaviours. ---------- Methods/Design: A total of 340 individuals with type 2 diabetes will be randomised, either to the routine care arm, or to the intervention arm in which participants receive the Telephone-Linked Care (TLC) Diabetes program in addition to their routine care. The intervention requires the participants to telephone the TLC Diabetes phone system weekly for 6 months. They receive the study handbook and a glucose meter linked to a data uploading device. The TLC system consists of a computer with software designed to provide monitoring, tailored feedback and education on key aspects of diabetes self-management, based on answers voiced or entered during the current or previous conversations. Data collection is conducted at baseline (Time 1), 6-month follow-up (Time 2), and 12-month follow-up (Time 3). The primary outcomes are glycaemic control (HbA1c) and quality of life (Short Form-36 Health Survey version 2). Secondary outcomes include anthropometric measures, blood pressure, blood lipid profile, psychosocial measures as well as measures of diet, physical activity, blood glucose monitoring, foot care and medication taking. Information on utilisation of healthcare services including hospital admissions, medication use and costs is collected. An economic evaluation is also planned.---------- Discussion: Outcomes will provide evidence concerning the efficacy of a telephone-linked care intervention for self-management of diabetes. Furthermore, the study will provide insight into the potential for more widespread uptake of automated telehealth interventions, globally.
Resumo:
A Simulink Matlab control system of a heavy vehicle suspension has been developed. The aim of the exercise presented in this paper was to develop a Simulink Matlab control system of a heavy vehicle suspension. The objective facilitated by this outcome was the use of a working model of a heavy vehicle (HV) suspension that could be used for future research. A working computer model is easier and cheaper to re-configure than a HV axle group installed on a truck; it presents less risk should something go wrong and allows more scope for variation and sensitivity analysis before embarking on further "real-world" testing. Empirical data recorded as the input and output signals of a heavy vehicle (HV) suspension were used to develop the parameters for computer simulation of a linear time invariant system described by a second-order differential equation of the form: (i.e. a "2nd-order" system). Using the empirical data as an input to the computer model allowed validation of its output compared with the empirical data. The errors ranged from less than 1% to approximately 3% for any parameter, when comparing like-for-like inputs and outputs. The model is presented along with the results of the validation. This model will be used in future research in the QUT/Main Roads project Heavy vehicle suspensions – testing and analysis, particularly so for a theoretical model of a multi-axle HV suspension with varying values of dynamic load sharing. Allowance will need to be made for the errors noted when using the computer models in this future work.
Resumo:
A significant proportion of the cost of software development is due to software testing and maintenance. This is in part the result of the inevitable imperfections due to human error, lack of quality during the design and coding of software, and the increasing need to reduce faults to improve customer satisfaction in a competitive marketplace. Given the cost and importance of removing errors improvements in fault detection and removal can be of significant benefit. The earlier in the development process faults can be found, the less it costs to correct them and the less likely other faults are to develop. This research aims to make the testing process more efficient and effective by identifying those software modules most likely to contain faults, allowing testing efforts to be carefully targeted. This is done with the use of machine learning algorithms which use examples of fault prone and not fault prone modules to develop predictive models of quality. In order to learn the numerical mapping between module and classification, a module is represented in terms of software metrics. A difficulty in this sort of problem is sourcing software engineering data of adequate quality. In this work, data is obtained from two sources, the NASA Metrics Data Program, and the open source Eclipse project. Feature selection before learning is applied, and in this area a number of different feature selection methods are applied to find which work best. Two machine learning algorithms are applied to the data - Naive Bayes and the Support Vector Machine - and predictive results are compared to those of previous efforts and found to be superior on selected data sets and comparable on others. In addition, a new classification method is proposed, Rank Sum, in which a ranking abstraction is laid over bin densities for each class, and a classification is determined based on the sum of ranks over features. A novel extension of this method is also described based on an observed polarising of points by class when rank sum is applied to training data to convert it into 2D rank sum space. SVM is applied to this transformed data to produce models the parameters of which can be set according to trade-off curves to obtain a particular performance trade-off.
Resumo:
The ICT degrees in most Australian universities have a sequence of up to three programming subjects, or units. BABELnot is an ALTC-funded project that will document the academic standards associated with those three subjects in the six participating universities and, if possible, at other universities. This will necessitate the development of a rich framework for describing the learning goals associated with programming. It will also be necessary to benchmark exam questions that are mapped onto this framework. As part of the project, workshops are planned for ACE 2012, ICER 2012 and ACE 2013, to elicit feedback from the broader Australasian computing education community, and to disseminate the project’s findings. The purpose of this paper is to introduce the project to that broader Australasian computing education community and to invite their active participation.
Resumo:
Projects funded by the Australian National Data Service(ANDS). The specific projects that were funded included: a) Greenhouse Gas Emissions Project (N2O) with Prof. Peter Grace from QUT’s Institute of Sustainable Resources. b) Q150 Project for the management of multimedia data collected at Festival events with Prof. Phil Graham from QUT’s Institute of Creative Industries. c) Bio-diversity environmental sensing with Prof. Paul Roe from the QUT Microsoft eResearch Centre. For the purposes of these projects the Eclipse Rich Client Platform (Eclipse RCP) was chosen as an appropriate software development framework within which to develop the respective software. This poster will present a brief overview of the requirements of the projects, an overview of the experiences of the project team in using Eclipse RCP, report on the advantages and disadvantages of using Eclipse and it’s perspective on Eclipse as an integrated tool for supporting future data management requirements.
Resumo:
This paper reports on an experiment that was conducted to determine the extent to which group dynamics impacts on the effectiveness of software development teams. The experiment was conducted on software engineering project students at the Queensland University of Technology (QUT).
Resumo:
This paper describes the content and delivery of a software internationalisation subject (ITN677) that was developed for Master of Information Technology (MIT) students in the Faculty of Information Technology at Queensland University of Technology. This elective subject introduces students to the strategies, technologies, techniques and current development associated with this growing 'software development for the world' specialty area. Students learn what is involved in planning and managing a software internationalisation project as well as designing, building and using a software internationalisation application. Students also learn about how a software internationalisation project must fit into an over-all product localisation and globalisation that may include culturalisation, tailored system architectures, and reliance upon industry standards. In addition, students are exposed to the different software development techniques used by organizations in this arena and the perils and pitfalls of managing software internationalisation projects.