857 resultados para industrialised building system
Resumo:
Demands for thermal comfort, better indoor air quality together with lower environmental impacts have had ascending trends in the last decade. In many circumstances, these demands could not be fully covered through the soft approach of bioclimatic design like optimisation of the building orientation and internal layout. This is mostly because of the dense urban environment and building internal energy loads. In such cases, heating, ventilation, air-conditioning and refrigeration (HVAC&R) systems make a key role to fulfill the requirements of indoor environment. Therefore, it is required to select the most proper HVAC&R system. In this study, a robust decision making approach for HVAC&R system selection is proposed. Technical performance, economic aspect and environmental impacts of 36 permutations of primary and secondary systems are taken into account to choose the most proper HVAC&R system for a case study office building. The building is a representative for the dominant form of office buildings in the UK. Dynamic performance evaluation of HVAC&R alternatives using TRNSYS package together with life cycle energy cost analysis provides a reliable basis for decision making. Six scenarios broadly cover the decision makers' attitudes on HVAC&R system selection which are analysed through Analytical Hierarchy Process (AHP). One of the significant outcomes reveals that, despite both the higher energy demand and more investment requirements associated with compound heating, cooling and power system (CCHP); this system is one of the top ranked alternatives due to the lower energy cost and C02 emissions. The sensitivity analysis reveals that in all six scenarios, the first five top ranked alternatives are not changed. Finally, the proposed approach and the results could be used by researchers and designers especially in the early stages of a design process in which all involved bodies face the lack of time, information and tools for evaluation of a variety of systems.
Resumo:
Planning is highly conditioned by the relationships between the market, state and politics. This becomes particularly clear in looking at the changes taking place in the countries of the former Communist block as they attempt to establish a new set of relationships. The old power structures have been dislodged and old laws discarded. This paper examines the situation in Bulgaria and explores the preconditions for setting up a new planning system there. The first section outlines the political changes since 1989 and shows how political instability has effected the pace of change. The establishment of a market in land and property is a second precondition for the planning system there and moves in this direction are presented, including restitution policies. Finally the issues raised by the early attempts towards a new planning system are discussed. This paper is the first of a series looking at the countries of Eastern Europe and the author would welcome comments from others working in this field.
Resumo:
In 'Avalanche', an object is lowered, players staying in contact throughout. Normally the task is easily accomplished. However, with larger groups counter-intuitive behaviours appear. The paper proposes a formal theory for the underlying causal mechanisms. The aim is to not only provide an explicit, testable hypothesis for the source of the observed modes of behaviour-but also to exemplify the contribution that formal theory building can make to understanding complex social phenomena. Mapping reveals the importance of geometry to the Avalanche game; each player has a pair of balancing loops, one involved in lowering the object, the other ensuring contact. For more players, sets of balancing loops interact and these can allow dominance by reinforcing loops, causing the system to chase upwards towards an ever-increasing goal. However, a series of other effects concerning human physiology and behaviour (HPB) is posited as playing a role. The hypothesis is therefore rigorously tested using simulation. For simplicity a 'One Degree of Freedom' case is examined, allowing all of the effects to be included whilst rendering the analysis more transparent. Formulation and experimentation with the model gives insight into the behaviours. Multi-dimensional rate/level analysis indicates that there is only a narrow region in which the system is able to move downwards. Model runs reproduce the single 'desired' mode of behaviour and all three of the observed 'problematic' ones. Sensitivity analysis gives further insight into the system's modes and their causes. Behaviour is seen to arise only when the geometric effects apply (number of players greater than degrees of freedom of object) in combination with a range of HPB effects. An analogy exists between the co-operative behaviour required here and various examples: conflicting strategic objectives in organizations; Prisoners' Dilemma and integrated bargaining situations. Additionally, the game may be relatable in more direct algebraic terms to situations involving companies in which the resulting behaviours are mediated by market regulations. Finally, comment is offered on the inadequacy of some forms of theory building and the case is made for formal theory building involving the use of models, analysis and plausible explanations to create deep understanding of social phenomena.
Resumo:
The article discusses various reports published within the issue, including the articles "Closing the Loop: Promoting Synergies with other Theory Building Approaches to Improve System Dynamics Practice," by Birgit Kopainsky and Luis Luna-Reyes, and "On improving dynamic decision-making: Implications from multiple-process cognitive theory," by Bent Bakken.
Resumo:
In this study, the performance, yield and characteristics of a 15 year old photovoltaic system installation has been investigated. The technology, BP Saturn modules which were steel-blue polycrystalline silicon cells are no longer in production. A bespoke monitoring system was designed and purpose built to monitor the characteristics of 6 strings, of 18 modules connected in series. The total output of the system is configured to 6.5kWp (series to parallel configuration). The PV system is demonstrating system outputs to be inferior by 0.7% per year. However,efficiency values in comparison to standard test conditions have remained practically the same. This output though very relevant to the possible performance and stability of aging cells, requires additional parametric studies to develop a more robust argument. The result presented in this paper is part of an on going investigation into PV system aging effects.
Resumo:
In this study, the performance, yield and characteristics of a 16 year old photovoltaic (PV) system installation have been investigated. The technology, BP Saturn modules which were steel-blue polycrystalline silicon cells are no longer in production. A bespoke monitoring system has been designed to monitor the characteristics of 6 refurbished strings, of 18 modules connected in series. The total output of the system is configured to 6.5 kWp (series to parallel configuration). In addition to experimental results, the performance ratio (PR) of known values was simulated using PVSyst, a simulation software package. From calculations using experimental values, the PV system showed approximately 10% inferior power outputs to what would have been expected as standard test conditions. However, efficiency values in comparison to standard test conditions and the performance ratio (w75% from PVSyst simulations) over the past decade have remained practically the same. This output though very relevant to the possible performance and stability of aging cells, requires additional parametric studies to develop a more robust argument. The result presented in this paper is part of an on-going investigation into PV system aging effects.
Resumo:
In this invited article the authors present an evaluative report on the development of the MESHGuides project (http://www.meshguides.org/). MESHGuides’ objective is to provide education with an international knowledge management system. MESHGuides were conceived as research summaries for supporting teachers’ in developing evidence-based practice. Their aim is to enhance teachers’ capacity to engage actively with research in their own classrooms. The original thinking for MESH arose from the work of UK-based academics Professor Marilyn Leask and Dr Sarah Younie in response to a desire, which has recently gathered momentum in the UK, for the development of a more research-informed teaching profession and for the establishment of an on-line platform to support evidence-based practice (DfE, 2015; Leask and Younie 2001; OECD 2009). The focus of this article is on how the MESHGuides project was conceived and structured, the technical systems supporting it and the practical reality for academics and teachers of composing and using MESHGuides. The project and the guides are in the early stages of development, and discussion indicates future possibilities for more global engagement with this knowledge management system.
Resumo:
Our generation of computational scientists is living in an exciting time: not only do we get to pioneer important algorithms and computations, we also get to set standards on how computational research should be conducted and published. From Euclid’s reasoning and Galileo’s experiments, it took hundreds of years for the theoretical and experimental branches of science to develop standards for publication and peer review. Computational science, rightly regarded as the third branch, can walk the same road much faster. The success and credibility of science are anchored in the willingness of scientists to expose their ideas and results to independent testing and replication by other scientists. This requires the complete and open exchange of data, procedures and materials. The idea of a “replication by other scientists” in reference to computations is more commonly known as “reproducible research”. In this context the journal “EAI Endorsed Transactions on Performance & Modeling, Simulation, Experimentation and Complex Systems” had the exciting and original idea to make the scientist able to submit simultaneously the article and the computation materials (software, data, etc..) which has been used to produce the contents of the article. The goal of this procedure is to allow the scientific community to verify the content of the paper, reproducing it in the platform independently from the OS chosen, confirm or invalidate it and especially allow its reuse to reproduce new results. This procedure is therefore not helpful if there is no minimum methodological support. In fact, the raw data sets and the software are difficult to exploit without the logic that guided their use or their production. This led us to think that in addition to the data sets and the software, an additional element must be provided: the workflow that relies all of them.
Resumo:
Building energy meter network, based on per-appliance monitoring system, willbe an important part of the Advanced Metering Infrastructure. Two key issues exist for designing such networks. One is the network structure to be used. The other is the implementation of the network structure on a large amount of small low power devices, and the maintenance of high quality communication when the devices have electric connection with high voltage AC line. The recent advancement of low-power wireless communication makes itself the right candidate for house and building energy network. Among all kinds of wireless solutions, the low speed but highly reliable 802.15.4 radio has been chosen in this design. While many network-layer solutions have been provided on top of 802.15.4, an IPv6 based method is used in this design. 6LOWPAN is the particular protocol which adapts IP on low power personal network radio. In order to extend the network into building area without, a specific network layer routing mechanism-RPL, is included in this design. The fundamental unit of the building energy monitoring system is a smart wall plug. It is consisted of an electricity energy meter, a RF communication module and a low power CPU. The real challenge for designing such a device is its network firmware. In this design, IPv6 is implemented through Contiki operation system. Customize hardware driver and meter application program have been developed on top of the Contiki OS. Some experiments have been done, in order to prove the network ability of this system.
Resumo:
Energy Efficiency is one of the goals of the Smart Building initiatives. This paper presents an Open Energy Management System which consists of an ontology-based multi-technology platform and a wireless transducer network using 6LoWPAN communication technology. The system allows the integration of several building automation protocols and eases the development of different kind of services to make use of them. The system has been implemented and tested in the Energy Efficiency Research Facility at CeDInt-UPM.
Resumo:
PV Off-Grid systems have demonstrated to be a good solution for the electrification of remote areas [1]. A hybrid system is one kind of these systems. The principal characteristic is that it uses PV as the main generator and has a backup power supply, like a diesel generator, for instance, that is used when the CPV generation is not enough to meet demand. To study the use of CPV in these systems, ISFOC has installed a demonstration hybrid system at its headquarters. This hybrid system uses CPV technology as main generator and the utility grid as the backup generator. A group of batteries have been mounted as well to store the remaining energy from the CPV generator when nedeed. The energy flows are managed by a SMA system based on Sunny Island inverters and a Multicluster-Box (figure 1). The Load is the air-conditioning system of the building, as it has a consumption profile higher than the CPV generator and can be controlled by software [2]. The first results of this system, as well as the first chances of improvement, as the need of a bigger CPV generator and a better management of the energy stored in the batteries, are presented in this paper.
Resumo:
This paper presents an Ontology-Based multi-technology platform designed to avoid some issues of Building Automation Systems. The platform allows the integration of several building automation protocols, eases the development and implementation of different kinds of services and allows sharing information related to the infrastructure and facilities within a building. The system has been implemented and tested in the Energy Efficiency Research Facility at CeDInt-UPM.
Resumo:
It is known that a green wall brings some advantages to a building. It constitutes a barrier against solar radiation, thus decreasing and delaying the incoming heat flux. The aim of this study is to quantify such advantages through analytical comparison between two facades, a vegetal facade and a conventional facade. Both were highly insulated (U-value = 0.3 W/m2K) and installed facing south on the same building in the central territory of Spain. In order to compare their thermal trend, a series of sensors were used to register superficial and indoor air temperature. The work was carried out between 17th August 2012 and 1st October 2012, with a temperature range of 12°C-36°C and a maximum horizontal radiation of 1020 W/m2. Results show that the indoor temperature of the green wall module was lower than the other. Besides, comparing superficial outdoor and indoor temperatures of the two walls to outdoor air temperatures, it was noticed that, due to the shading plants, the green wall superficial temperature was 5 °C lower on the facade, while the bare wall temperature was 15 °C higher. The living wall module temperature was 1.6 °C lower than the outdoor, while the values of the conventional one were similar to the outdoor air temperature.