849 resultados para court delay
Resumo:
Using our porcine model of deep dermal partial thickness burn injury, various durations (10min, 20min, 30min or 1h) and delays (immediate, 10min, 1h, 3h) of 15 degrees C running water first aid were applied to burns and compared to untreated controls. The subdermal temperatures were monitored during the treatment and wounds observed weekly for 6 weeks, for re-epithelialisation, wound surface area and cosmetic appearance. At 6 weeks after the burn, tissue biopsies were taken of the scar for histological analysis. Results showed that immediate application of cold running water for 20min duration is associated with an improvement in re-epithelialisation over the first 2 weeks post-burn and decreased scar tissue at 6 weeks. First aid application of cold water for as little as 10min duration or up to 1h delay still provides benefit.
Resumo:
NSW Supreme Court decision - claim resulting from alleged damaging dental treatment of healthy teeth - failure of plaintiff to prove dishonest and fraudulent behaviour - assessment of damages.
Resumo:
Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.
Resumo:
We report a new approach that uses the single beam Z-scan technique, to discriminate between excited state absorption (ESA) and two and three photon nonlinear absorption. By measuring the apparent delay or advance of the pulse in reaching the detector, the nonlinear absorption can be unambiguously identified as either instantaneous or transient. The simple method does not require a large range of input fluences or sophisticated pulse-probe experimental apparatus. The technique is easily extended to any absorption process dependent on pulse width and to nonlinear refraction measurements. We demonstrate in particular, that the large nonlinear absorption in ZnO nanocones when exposed to nanosecond 532 nm pulses, is due mostly to ESA, not pure two-photon absorption.
Resumo:
In Elders Rural Services Australia Ltd v Gooden [2014] QDC 22 Reid DCJ considered the interaction of the procedures under the Uniform Civil Procedure Rules 1999 (Qld)relating to disclosure by parties to a proceeding and the subpoena process, in the context of a proceeding commenced by originating application.
Resumo:
This article presents an overview of two aspects of the role the internet now plays in the court system - first, the extent to which judges, administrators and court officials at the different levels in the court hierarchy are using the internet to deliver enhanced access to the Australian justice system for the community as a whole, and second, how they have embraced that same technology as an aid for accessing information for better judgment delivery and administration.
Resumo:
In Australian Prudential Regulation Authority v Rural and General Insurance Let [2004] FCA 933, Gyles J considered what he described as "a novel question", namely, whether taking steps to prepare to give oral evidence when subpoenaed to attend for that purpose, including the obtaining of legal advice and assistance, could be recovered by the witness under O 27 r 11 of the Federal Court Rules
Resumo:
In Lambert v Surplice [2004] QDC 092 McGill DCJ considered the extent to which the court should exercise a discretion on an application under s79 of the District Court Act 1967 to transfer a proceeding pending in the Magistrates Court to the District Court.
Resumo:
In Asset Loan Management v Mamap Pty Ltd [2005] QDC 295, McGill DCJ held that costs may be recovered in Magistrates Courts on the indemnity basis. His Honour was satisfied his conclusion in this respect was not precluded by the decision of the Court of Appeal in Beardmore v Franklins Management Services Pty Ltd [2002] QCA 60
Resumo:
In CB Richard Ellis (C) Pty Ltd v Wingate Properties Pty Ltd [2005] QDC 399 McGill DCJ examined whether the court now has a discretion to set aside an irregularly entered default judgment.
Resumo:
The case of Flynn v The Maryborough Sugar Factory Limited [2003] QDC 446 the plaintiff had been awarded damages for personal injuries and there was a charge on those damages under a Commonwealth statute, with a provision in the statute that damages could not be satisfied until the Commonwealth had been paid. The Court considered the point of considerable practical significance of whether interest accrued on the judgment under s48 of the Supreme Court Act 1995 (Qld) before the defendant had obtained clearances under the Commonwealth legislation.
Resumo:
The article examines the decision in Erskine v McDowall [2001] QDC 192, where the Court considered an application for an order that the defendant disclose documents to which she had a right of access under the Freedom of Information Act 1982 (Cth).
Resumo:
The decision in Hook v Boreham & QBE Insurance (Australia) Limited [2006] QDC 304 considered whether the court should go further than order that costs be assessed on the indemnity basis, but should also specify the basis by which those indemnity costs should be determined. The decision makes it clear that under r704(3) of the Uniform Civil Procedure Rules, questions of that nature are ordinarily preserved to the discretion of the Registrar.