912 resultados para cold-mix asphalt
Resumo:
"April 1981."
Resumo:
Cover-title.
Resumo:
Reproduced from typewritten copy.
Resumo:
Reproduced from typewritten copy.
Resumo:
Mode of access: Internet.
Resumo:
Includes change no. 1 inserted at front.
Resumo:
"May 1968."
Resumo:
The aims of this study were to determine whether responses in myocardial blood flow (MBF) to the cold pressor testing (CPT) method noninvasively with PET correlate with an established and validated index of flow-dependent coronary vasomotion on quantitative angiography. METHODS: Fifty-six patients (57 +/- 6 y; 16 with hypertension, 10 with hypercholesterolemia, 8 smokers, and 22 without coronary risk factors) with normal coronary angiograms were studied. Biplanar end-diastolic images of a selected proximal segment of the left anterior descending artery (LAD) (n = 27) or left circumflex artery (LCx) (n = 29) were evaluated with quantitative coronary angiography in order to determine the CPT-induced changes of epicardial luminal area (LA, mm(2)). Within 20 d of coronary angiography, MBF in the LAD, LCx, and right coronary artery territory was measured with (13)N-ammonia and PET at baseline and during CPT. RESULTS: CPT induced on both study days comparable percent changes in the rate x pressure product (%DeltaRPP, 37% +/- 13% and 40% +/- 17%; P = not significant [NS]). For the entire study group, the epicardial LA decreased from 5.07 +/- 1.02 to 4.88 +/- 1.04 mm(2) (DeltaLA, -0.20 +/- 0.89 mm(2)) or by -2.19% +/- 17%, while MBF in the corresponding epicardial vessel segment increased from 0.76 +/- 0.16 to 1.03 +/- 0.33 mL x min(-1) x g(-1) (DeltaMBF, 0.27 +/- 0.25 mL x min(-1) x g(-1)) or 36% +/- 31% (P <or= 0.0001). However, in normal controls without coronary risk factors (n = 22), the epicardial LA increased from 5.01 +/- 1.07 to 5.88 +/- 0.89 mm(2) (19.06% +/- 8.9%) and MBF increased from 0.77 +/- 0.16 to 1.34 +/- 0.34 mL x min(-1) x g(-1) (74.08% +/- 23.5%) during CPT, whereas patients with coronary risk factors (n = 34) revealed a decrease of epicardial LA from 5.13 +/- 1.48 to 4.24 +/- 1.12 mm(2) (-15.94% +/- 12.2%) and a diminished MBF increase (from 0.76 +/- 0.20 to 0.83 +/- 0.25 mL x min(-1) x g(-1) or 10.91% +/- 19.8%) as compared with controls (P < 0.0001, respectively), despite comparable changes in the RPP (P = NS). In addition, there was a significant correlation (r = 0.87; P <or= 0.0001) between CPT-related percent changes in LA on quantitative angiography and in MBF as measured with PET. CONCLUSION: The observed close correlation between an angiographically established parameter of flow-dependent and, most likely, endothelium-mediated coronary vasomotion and PET-measured MBF further supports the validity and value of MBF responses to CPT as a noninvasively available index of coronary circulatory function.
Resumo:
After some success with a small asphalt pavement recycling project in 1975, Kossuth County, Iowa programmed a much larger undertaking during the 1976 construction season. The work performed in 1975 indicated that a quality product could be produced with some modifications to conventional equipment. As anticipated , the major problem encountered was the excessive air pollution created during the heating and mixing process. As part of its 1976 road program, Kossuth County developed plans for recycling sixteen miles of existing asphalt pavements using the "hot mix" recycling process. One project, ten miles in length, was selected by the Federal Highway Authority as part of "Demonstration Project No. 39, Recycling Asphalt Pavements." The FHWA provided a $29,500 grant t o the project to be used for project testing and evaluation. Cooperation and input into the work proposed for 1976 was received from many sources. The people and organizations contributing were the Federal Highway Authority, the Iowa Department of Environmental Quality, the Federal Environmental Protection Agency, several contractors, and personnel from the Kossuth County Engineer's Office.
Resumo:
Interest in the use of ground rubber from used tires as a hot asphalt mix binder has been increasing due to the magnitude of the disposal problem posed by the annual addition of millions of waste tires to the refuse stream. This study evaluates, through laboratory means, the performance of asphalt-rubber as a hot mix binder as compared to conventional asphalt. The results indicate that asphalt-rubber outperforms its base asphalt in mixes of identical gradation and comparable void content on tests that are heavily dependent on binder characteristics (resilient modulus and indirect tension). An appreciable increase in rut resistance due to the use of asphalt-rubber is not indicated.
Resumo:
A number of claims have been made that polymer modified asphalt cements, multi-grade asphalt cements, and other modifications of the liquid asphalt will prevent rutting and other deterioration of asphalt mixes, thereby, extending the service life of asphalt pavements. This laboratory study evaluates regular AC-20 asphalt cement, PAC-30 polymer modified asphalt cement and AC-10-30 multi-grade asphalt cement. PAC-30 was also evaluated with 15% Gilsonite and 15% Witcurb in a 75% crushed stone - 25% sand mix. These mixtures were evaluated for all Marshall properties along with indirect tensile, resilient modulus, and creep resistance.
Resumo:
In view of the energy, environmental, and economic advantages of the foamed asphalt process using local aggregates in cold mixes and the promising results from Research Project HR-212, a 4.2-mile section of county road in Muscatine County was built with foamed asphalt and local aggregates during August-September 1983. Extensive laboratory evaluation was carried out on five plant mixes representing foamed mixes used in the nine test sections, a laboratory prepared foamed mix, and a laboratory prepared hot mix similar to Plant Mix 1. The foamed mixes were compacted, cured under 15 curing conditions and tested for bulk specific gravity, Marshall stability at 77° F and at 140° F, cured moisture content, resilient modulus and effects of moisture damage due to freeze-thaw cycles, water soaking, and vacuum saturation. In addition, four sets of 83 core samples were taken at 1 to 15 months and tested for moisture content, specific gravity, Marshall stability, and resilient modulus. In summary, the test road has performed satisfactorily for almost two years. The few early construction problems encountered were to be expected for experimental projects dealing with new materials and technologies. Overall results to date are encouraging and foamed asphalt mixes have proved to have the potential as a viable base material in areas where marginal aggregates are available. It is hoped and expected that performance evaluation of the test sections will be continued and that more foamed asphalt trial projects will be constructed and monitored so that experiences and findings from this project can be verified and mix design criteria can be gradually established. For future foamed asphalt projects it is recommended that anti-stripping additives, such as hydrated lime, be added in view of the potential moisture susceptibility of foamed mixes observed in the laboratory evaluation.
Resumo:
A 5.8 mile section of Dubuque County (Iowa) Road D-53 was selected for this project, the objective of which were to: 1. identify a cost effective asphalt emulsion bound macadam typical cross section; 2. determine the effectiveness of engineering fabric placed under macadam roadbeds; and 3. evalaute the use of emulsions in surface seal coats. A number of conclusions were reached: 1. The minus #200 sieve material for the macadam stone should be held to a minimum. For the emulsion used on this project, the minus #200 material had less than 4 percent to achieve satisfactory coating of the macadam stone. 2. The placement of the emulsion treated macadam required no additional equipment or time than the plain macadam placement. 3. Emulsion treating the macadam stone for the shoulder base appears unnecessary. 4. The emulsion treated macadam base beneath an asphaltic concrete wearing surface yielded a higher structural rating than the plain macadam beneath a comparable ashaltic concrete surface. 5. The performance of the fabric between the subgrade and the macadam base to prevent soil intrusion into the base could not be determined by the non-destructive testing conducted. 6. When no choke stone is used over the macadam base, allowance for ac mix overrun should be made. 7. Use of an emulsion instead of a cutback asphalt saved money and energy. However, the poor performance of the seal coat negated any real savings.
Resumo:
The joint between two lanes of asphalt pavement is often the first area of a roadway which shows signs of deterioration and requires maintenance. As the final lift of hot asphalt is being placed in a construction project, it is being forced p against the adjoining lane of cold asphalt, forming the longitudinal joint. The mating of the two lanes, to form a high quality seal, is often not fully successful and later results in premature stripping or raveling as water enters the unsealed joint. The application of a hot poured rubberized asphaltic joint sealant along the joint face in the final stage of construction should help to form a watertight joint seal. A new product, especially formulated for the longitudinal joint in asphalt pavements was proposed to improve joint sealing. The following describes the experimental application of the new product, Crafco, PN 34524.
Resumo:
Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.