986 resultados para Traffic congestion


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Road construction, maintenance and operation are activities that impact the environment by way of energy use, resource consumption and emission. Components such as construction material, transportation, street lighting, rolling resistance, traffic congestion during works, albedo and end-of-life processing impact the environment at different phases of the life of a road. With a view to promote sustainable development, a few sustainability rating schemes, e.g. Infrastructure Sustainability and Invest (Australia), Envision and Greenroads (USA), and CEEQUAL (UK) have been developed, that can assess road projects. These schemes address environmental areas such as: energy and emission, land, water, materials, discharges into surroundings, waste and ecology as factors for sustainable development. This paper assesses different rating schemes based on a defined comprehensive life cycle assessment (LCA) system boundary for road projects to identify different environmental indicators that address sustainable road development and operation. The findings indicate that new indicators are required to address different environmental components during the operation phase of roads.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A multimodal trip planner that produces optimal journeys involving both public transport and private vehicle legs has to solve a number of shortest path problems, both on the road network and the public transport network. The algorithms that are used to solve these shortest path problems have been researched since the late 1950s. However, in order to provide accurate journey plans that can be trusted by the user, the variability of travel times caused by traffic congestion must be taken into consideration. This requires the use of more sophisticated time-dependent shortest path algorithms, which have only been researched in depth over the last two decades, from the mid-1990s. This paper will review and compare nine algorithms that have been proposed in the literature, discussing the advantages and disadvantages of each algorithm on the basis of five important criteria that must be considered when choosing one or more of them to implement in a multimodal trip planner.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study focuses on weather effects on daily bus ridership in Brisbane, given bus’ dominance in this city. The weather pattern of Brisbane varies by season according to its sub-tropical climate characteristics. Bus is prone to inclement weather condition as it shares the road system with general traffic. Moreover, bus stops generally offer less or sometimes no protection from adverse weather. Hence, adverse weather conditions such as rain are conjectured to directly impact on daily travel behaviour patterns. There has been limited Australian research on the impact of weather on daily transit ridership. This study investigates the relationship between rainy day and daily bus ridership for the period of 2010 to 2012. Overall, rainfall affects negatively with varying impacts on different transit groups. However, this analysis confirmed a positive relationship between consecutive rainy days (rain continuing for 3 or more days). A possible explanation could be that people may switch their transport mode to bus to avoid high traffic congestion and higher accident potentiality on rainy days. Also, Brisbane’s segregated busway (BRT) corridor works favourably towards this mode choice. Our study findings enhance the fundamental understanding of traveller behaviour, particularly mode choice behaviour under adverse weather conditions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Professor Nathan Efron's personal ophthalmic journey of retinopexy, cryopexy, double vitrectomy and IOL surgery was temporarily delayed by chaotic scenes of traffic congestion on the Gold Coast due to the annual V8 supercar races.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Background An increase in bicycle commuting participation may improve public health and traffic congestion in cities. Information on air pollution exposure (such as perception, symptoms and risk management) contributes to the responsible promotion of bicycle commuting participation. Methods To determine perceptions, symptoms and willingness for specific exposure risk management strategies of exposure to air pollution, a questionnaire-based cross-sectional investigation was conducted with adult bicycle commuters (n = 153; age = 41 ± 11 yr; 28% female). Results Frequency of acute respiratory signs and symptoms are positively-associated with in- and post-commute compared to pre-commute time periods (p < 0.05); greater positive-association is with respiratory disorder compared to healthy, and female compared to male, participants. The perception (although not signs or symptoms) of in-commute exposure to air pollution is positive-associated with the estimated level of in-commute proximity to motorised traffic. The majority of participants indicated a willingness (which varied with health status and gender) to adopt risk management strategies (with certain practical features) if shown to be appropriate and effective. Conclusions While acute signs and symptoms of air pollution exposure are indicated with bicycle commuting, and more so in susceptible individuals, there is willingness to manage exposure risk by adopting effective strategies with desirable features.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This research quantifies traffic congestion and travel time reliability with case study on a major arterial road in Brisbane. The focus is on the analysis of impact of incidents (e.g., road accidents) on travel time reliability. Real traffic (Bluetooth) and incident records from Coronation Drive, Brisbane are utilized for the study. The findings include significant impact of incidents on traffic congestion and travel time reliability. The knowledge gained is useful in various applications such as traveler information systems, and cost-benefit analysis of various strategies to reduce the traffic incidents and its' impacts.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Road infrastructure is a major contributor of greenhouse gas (GHG) around the world. Once constructed, a road becomes a part of a road network and is subjected to recurrent maintenance/rehabilitation activities. Studies to date are mostly aimed at the development of sustainability indicators that deal with the material and construction phases of a road when it is constructed. The operation phase is infrequently studied and there is a need for sustainability indicators to be developed relating to this phase to better understand the GHG emissions as a proper response to the climate change phenomena. During the operation phase, maintenance/rehabilitation activities are undertaken based on certain agreed intervention criteria that do not include environmental implications relating to the climate change aspect properly. Availability of appropriate indicators may, therefore, assist in sustainable road asset maintenance management. This paper presents the findings of a literature based study and has proposed a way forward to develop a key “road operation phase” environmental indicator, which can contribute to road operation phase carbon footprint management based on a comprehensive road life cycle system boundary model. The proposed indicator can address multiple aspects of high impact road operation life environmental components such as: pavement rolling resistance, albedo, material, traffic congestion and lighting, based on availability of relevant scientific knowledge. Development of the indicator to appropriate level would offset the impacts of these components significantly and contribute to sustainable road operation management.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

There are currently 23,500 level crossings in Australia, broadly divided into one of two categories: active level crossings which are fully automatic and have boom barriers, alarm bells, flashing lights, and pedestrian gates; and passive level crossings, which are not automatic and aim to control road and pedestrianised walkways solely with stop and give way signs. Active level crossings are considered to be the gold standard for transport ergonomics when grade separation (i.e. constructing an over- or underpass) is not viable. In Australia, the current strategy is to annually upgrade passive level crossings with active controls but active crossings are also associated with traffic congestion, largely as a result of extended closure times. The percentage of time level crossings are closed to road vehicles during peak periods increases with the rise in the frequency of train services. The popular perception appears to be that once a level crossing is upgraded, one is free to wipe their hands and consider the job done. However, there may also be environments where active protection is not enough, but where the setting may not justify the capital costs of grade separation. Indeed, the associated congestion and traffic delay could compromise safety by contributing to the risk taking behaviour by motorists and pedestrians. In these environments it is important to understand what human factor issues are present and ask the question of whether a one size fits all solution is indeed the most ergonomically sound solution for today’s transport needs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Traffic congestion has been a growing issue in many metropolitan areas during recent years, which necessitates the identification of its key contributors and development of sustainable strategies to help decrease its adverse impacts on traffic networks. Road incidents generally and crashes specifically have been acknowledged as the cause of a large proportion of travel delays in urban areas and account for 25% to 60% of traffic congestion on motorways. Identifying the critical determinants of travel delays has been of significant importance to the incident management systems which constantly collect and store the incident duration data. This study investigates the individual and simultaneous differential effects of the relevant determinants on motorway crash duration probabilities. In particular, it applies parametric Accelerated Failure Time (AFT) hazard-based models to develop in-depth insights into how the crash-specific characteristic and the associated temporal and infrastructural determinants impact the duration. AFT models with both fixed and random parameters have been calibrated on one year of traffic crash records from two major Australian motorways in South East Queensland and the differential effects of determinants on crash survival functions have been studied on these two motorways individually. A comprehensive spectrum of commonly used parametric fixed parameter AFT models, including generalized gamma and generalized F families, have been compared to random parameter AFT structures in terms of goodness of fit to the duration data and as a result, the random parameter Weibull AFT model has been selected as the most appropriate model. Significant determinants of motorway crash duration included traffic diversion requirement, crash injury type, number and type of vehicles involved in a crash, day of week and time of day, towing support requirement and damage to the infrastructure. A major finding of this research is that the motorways under study are significantly different in terms of crash durations; such that motorway exhibits durations that are on average 19% shorter compared to the durations on motorway. The differential effects of explanatory variables on crash durations are also different on the two motorways. The detailed presented analysis confirms that, looking at the motorway network as a whole, neglecting the individual differences between roads, can lead to erroneous interpretations of duration and inefficient strategies for mitigating travel delays along a particular motorway.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study focuses on the effects of weather on daily bus ridership in Brisbane, given the dominance of buses in that city. The weather pattern of Brisbane varies by season according to its subtropical climate characteristics. Bus operation is affected by inclement weather conditions, as buses share the road system with general traffic. Moreover, bus stops generally offer little, or sometimes no, protection from adverse weather. Hence, adverse weather conditions such as rain are thought to directly impact on daily travel behaviour patterns. There has been limited Australian research on the impact of weather on daily transit ridership. This study investigates the relationship between rainy days and daily bus ridership for the period 2010 to 2012. Overall, rainfall has a negative effect, with varying impacts on different transit groups. However, this analysis confirmed a positive relationship between consecutive rainy days (rain continuing for 3 or more days). A possible explanation could be that people switch their transport mode to bus to avoid high traffic congestion and higher accident potentiality on rainy days. Also, Brisbane’s segregated busway corridor works favourably towards this mode choice. The findings of our study enhance the fundamental understanding of traveller behaviour, particularly mode-choice behaviour, under adverse weather conditions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Electric-motored personal mobility devices (PMDs) are appearing on Australian roads. While legal to import and own, their use is typically illegal for adult riders within the road transport system. However, these devices could provide an answer to traffic congestion by getting people out of cars for short trips (“first-and-last mile” travel). City of Ryde council, Macquarie University, and Transport for NSW examined PMD use within the road transport system. Stage 1 of the project examined PMD use within a controlled pedestrian environment on the Macquarie University campus. Three PMD categories were used: one-wheelers (an electric unicycle, the Solowheel); two-wheelers (an electric scooter, the Egret); and three-wheelers (the Qugo). The two-wheeled PMD was most effective in terms of flexibility. In contrast, the three-wheeled PMD was most effective in terms of speed. One-wheeled PMD riders were very satisfied with their device, especially at speed, but significant training and practice was required. Two-wheeled PMD riders had less difficulty navigating through pedestrian precincts and favoured the manoeuvrability of the device as the relative narrowness of the two-wheeled PMD made it easier to use on a diversity of path widths. The usability of all PMDs was compromised by the weight of the devices, difficulties in ascending steeper gradients, portability, and parking. This was a limited trial, with a small number of participants and within a unique environment. However, agreement has been reached for a Stage 2 extension into the Macquarie Park business precinct for further real-world trials within a fully functional road transport system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Large cities depend heavily on their metro systems to reduce traffic congestion, which is particularly the case with Shanghai, the largest and most developed city in China. For the purposes of enhancing the possibility in quantitative risk assessment and promoting the safety management level in Shanghai metro, an adaptable metro operation incident database (MOID) is therefore presented for containing details of all incidents that have occurred in metro operation. Taking compatibility and simplicity into consideration, Microsoft Access 2010 software is used for the comprehensive and thorough design of the MOID. Based on MOID, statistical characteristics of incident, such as types, causes, time, and severity, are discovered and 24 accident precursors are identified in Shanghai metro. The processes are demonstrated to show how the MOID can be used to identify trends in the incidents that have occurred and to anticipate and prevent future accidents. In order to promote the application of MOID, an organizational structure is proposed from the four aspects of supervision, research, implementation, and manufacturer. This research would be conducive to safety risk analysis in identifying relevant precursors in safety management and assessing safety level as a qualitative tool.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Congestion of traffic is one of the biggest challenges for urban cities in global perspective. Car traffic and traffic jams are causing major problems and the congestion is predicted to worsen in the future. The greenhouse effect has caused a severe threat to the environment globally. On the other hand from the point of view of companies and other economic parties time and money has been lost because of the congestion of traffic. This work studies some possible traffic payment systems for the Helsinki Metropolitan area introducing three optional models and concentrating on the point of view of the economic parties. Central part of this work is formed by a research questionnaire, which was conducted among companies located in the Helsinki area and where more than 1000 responses were gained. The study researches the approaches of the respondents to the area s current traffic system, its development and urban congestion pricing and the answers are analyzed according to the size, industry and location of the companies. The economic aspect is studied by economic theory of industrial location and by emphasizing the meaning of smoothly running traffic for the economic world. Chapter three presents detailed information about traffic congestion, how today s car-centered society has been formed, what concrete things congestion means for economic life and how traffic congestion can be limited. Theoretically it is examined how urban traffic payment systems are working using examples from London and Stockholm where successful traffic payment experiences exist. The literature review analyzes urban development, increasing car traffic and Helsinki Metropolitan area on a structural point of view. The fourth chapter introduces a case study, which concentrates on Helsinki Metropolitan area s different structures, the congestion situation in Helsinki and the introduction of the traffic payment system clarification. Currently the region is experiencing a phase where big changes are happening in the planning of traffic. The traffic systems are being unified to consider the whole region in the future. Also different advices for the increasing traffic congestion problems are needed. Chapter five concentrates on the questionnaire and theme interviews and introduces the research findings. The respondents overall opinion of the traffic payments is quite skeptical. There were some regional differences found and especially taxi, bus and cargo and transit enterprises shared the most negative opinion. Economic parties were worried especially because of the traffic congestion is causing harm for the business travel and the employees traveling to and from work. According to the respondents the best option from the traffic payment models was the ring model where the payment places would be situated inside the Ring Road III. Both the company representatives and other key decision makers see public transportation as a good and powerful tool to decrease traffic congestion. The only question, which remains, is where to find investors willing to invest in public transportation if economic representatives do not believe in pricing the traffic by for example traffic payment systems.