949 resultados para Science projects
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.
Resumo:
The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.
Resumo:
Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.
Resumo:
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context.
Resumo:
Since 2004, the Australian Learning and Teaching Council (ALTC) and its predecessor, the Carrick Institute for Learning and Teaching in Higher Education, have funded numerous teaching and educational research-based projects in the Mathematical Sciences. In light of the Commonwealth Government’s decision to close the ALTC in 2011, it is appropriate to take account of the ALTCs input into the Mathe- matical Sciences in higher education. Here we present an overview of ALTC projects in the Mathematical Sciences, as well as report on the contributions they have made to the Discipline.
Resumo:
Civil infrastructure plays a key role in supporting and improving current way of life. However, the assets can have a large impact on the region around them, which are both positive (usually for the purpose they are built) and negative (consequences and unintended effects). There is an increasing trend for society to place an importance on the role of sustainability to ensure that there is a world suitable for future generations. In order to ensure that the world for future generations is in the best possible condition it is increasingly important to look at integrating sustainability outcomes into the way industry operates, including the infrastructure industry. It is therefore important to undertake sustainability assessment of civil infrastructure projects. By having organisations take on sustainability assessments of civil infrastructure assets both during construction and in operation, the industry can assist to drive outcomes and results that will benefit society and future generations and make their own operations more efficient.
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
between mid 2010 and early 2011, Queensland road related infrastructures were devastated by flood and cyclone related natural disasters. Responding to these recent events and in preparing for more regular and intense climate-change induced events in future, the Queensland Government is now reviewing how post-disaster road infrastructure recovery projects are planned and delivered. In particular, there is awareness that rebuilding such infrastructure need sustainable strategies across economic, environmental and social dimensions. A comprehensive sustainability assessment framework for pre and post disaster situations can minimize negative impact on our communities, economy and environment. This research is underway to develop a comprehensive sustainability element frame work for post disaster management in road infrastructures in Queensland, Australia. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of natural disasters. This research can contribute to strategic planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes in Queensland. Within this context, this paper provides an overview of the qualitative mixed-method research approach involving literature reviews and case studies to explore and evaluate a number of sustainability elements with a view to develop operational strategies for disaster recovery road projects.