997 resultados para Project Scheduling


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Various software packages for project management include a procedure for resource-constrained scheduling. In several packages, the user can influence this procedure by selecting a priority rule. However, the resource-allocation methods that are implemented in the procedures are proprietary information; therefore, the question of how the priority-rule selection impacts the performance of the procedures arises. We experimentally evaluate the resource-allocation methods of eight recent software packages using the 600 instances of the PSPLIB J120 test set. The results of our analysis indicate that applying the default rule tends to outperform a randomly selected rule, whereas applying two randomly selected rules tends to outperform the default rule. Applying a small set of more than two rules further improves the project durations considerably. However, a large number of rules must be applied to obtain the best possible project durations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In order to manage properly ontology development projects in complex settings and to apply correctly the NeOn Methodology, it is crucial to have knowledge of the entire ontology development life cycle before starting the development projects. The ontology project plan and scheduling helps the ontology development team to have this knowledge and to monitor the project execution. To facilitate the planning and scheduling of ontology development projects, the NeOn Toolkit plugin called gOntt has been developed. gOntt is a tool that supports the scheduling of ontology network development projects and helps to execute them. In addition, prescriptive methodological guidelines for scheduling ontology development projects using gOntt are provided.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Investment in mining projects, like most business investment, is susceptible to risk and uncertainty. The ability to effectively identify, assess and manage risk may enable strategic investments to be sheltered and operations to perform closer to their potential. In mining, geological uncertainty is seen as the major contributor to not meeting project expectations. The need to assess and manage geological risk for project valuation and decision-making translates to the need to assess and manage risk in any pertinent parameter of open pit design and production scheduling. This is achieved by taking geological uncertainty into account in the mine optimisation process. This thesis develops methods that enable geological uncertainty to be effectively modelled and the resulting risk in long-term production scheduling to be quantified and managed. One of the main accomplishments of this thesis is the development of a new, risk-based method for the optimisation of long-term production scheduling. In addition to maximising economic returns, the new method minimises the risk of deviating from production forecasts, given the understanding of the orebody. This ability represents a major advance in the risk management of open pit mining.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The U.S. railroad companies spend billions of dollars every year on railroad track maintenance in order to ensure safety and operational efficiency of their railroad networks. Besides maintenance costs, other costs such as train accident costs, train and shipment delay costs and rolling stock maintenance costs are also closely related to track maintenance activities. Optimizing the track maintenance process on the extensive railroad networks is a very complex problem with major cost implications. Currently, the decision making process for track maintenance planning is largely manual and primarily relies on the knowledge and judgment of experts. There is considerable potential to improve the process by using operations research techniques to develop solutions to the optimization problems on track maintenance. In this dissertation study, we propose a range of mathematical models and solution algorithms for three network-level scheduling problems on track maintenance: track inspection scheduling problem (TISP), production team scheduling problem (PTSP) and job-to-project clustering problem (JTPCP). TISP involves a set of inspection teams which travel over the railroad network to identify track defects. It is a large-scale routing and scheduling problem where thousands of tasks are to be scheduled subject to many difficult side constraints such as periodicity constraints and discrete working time constraints. A vehicle routing problem formulation was proposed for TISP, and a customized heuristic algorithm was developed to solve the model. The algorithm iteratively applies a constructive heuristic and a local search algorithm in an incremental scheduling horizon framework. The proposed model and algorithm have been adopted by a Class I railroad in its decision making process. Real-world case studies show the proposed approach outperforms the manual approach in short-term scheduling and can be used to conduct long-term what-if analyses to yield managerial insights. PTSP schedules capital track maintenance projects, which are the largest track maintenance activities and account for the majority of railroad capital spending. A time-space network model was proposed to formulate PTSP. More than ten types of side constraints were considered in the model, including very complex constraints such as mutual exclusion constraints and consecution constraints. A multiple neighborhood search algorithm, including a decomposition and restriction search and a block-interchange search, was developed to solve the model. Various performance enhancement techniques, such as data reduction, augmented cost function and subproblem prioritization, were developed to improve the algorithm. The proposed approach has been adopted by a Class I railroad for two years. Our numerical results show the model solutions are able to satisfy all hard constraints and most soft constraints. Compared with the existing manual procedure, the proposed approach is able to bring significant cost savings and operational efficiency improvement. JTPCP is an intermediate problem between TISP and PTSP. It focuses on clustering thousands of capital track maintenance jobs (based on the defects identified in track inspection) into projects so that the projects can be scheduled in PTSP. A vehicle routing problem based model and a multiple-step heuristic algorithm were developed to solve this problem. Various side constraints such as mutual exclusion constraints and rounding constraints were considered. The proposed approach has been applied in practice and has shown good performance in both solution quality and efficiency.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Axle bearing damage with possible catastrophic failures can cause severe disruptions or even dangerous derailments, potentially causing loss of human life and leading to significant costs for railway infrastructure managers and rolling stock operators. Consequently the axle bearing damage process has safety and economic implications on the exploitation of railways systems. Therefore it has been the object of intense attention by railway authorities as proved by the selection of this topic by the European Commission in calls for research proposals. The MAXBE Project (http://www.maxbeproject.eu/), an EU-funded project, appears in this context and its main goal is to develop and to demonstrate innovative and efficient technologies which can be used for the onboard and wayside condition monitoring of axle bearings. The MAXBE (interoperable monitoring, diagnosis and maintenance strategies for axle bearings) project focuses on detecting axle bearing failure modes at an early stage by combining new and existing monitoring techniques and on characterizing the axle bearing degradation process. The consortium for the MAXBE project comprises 18 partners from 8 member states, representing operators, railway administrations, axle bearing manufactures, key players in the railway community and experts in the field of monitoring, maintenance and rolling stock. The University of Porto is coordinating this research project that kicked-off in November 2012 and it is completed on October 2015. Both on-board and wayside systems are explored in the project since there is a need for defining the requirement for the onboard equipment and the range of working temperatures of the axle bearing for the wayside systems. The developed monitoring systems consider strain gauges, high frequency accelerometers, temperature sensors and acoustic emission. To get a robust technology to support the decision making of the responsible stakeholders synchronized measurements from onboard and wayside monitoring systems are integrated into a platform. Also extensive laboratory tests were performed to correlate the in situ measurements to the status of the axle bearing life. With the MAXBE project concept it will be possible: to contribute to detect at an early stage axle bearing failures; to create conditions for the operational and technical integration of axle bearing monitoring and maintenance in different European railway networks; to contribute to the standardization of the requirements for the axle bearing monitoring, diagnosis and maintenance. Demonstration of the developed condition monitoring systems was performed in Portugal in the Northern Railway Line with freight and passenger traffic with a maximum speed of 220 km/h, in Belgium in a tram line and in the UK. Still within the project, a tool for optimal maintenance scheduling and a smart diagnostic tool were developed. This paper presents a synthesis of the most relevant results attained in the project. The successful of the project and the developed solutions have positive impact on the reliability, availability, maintainability and safety of rolling stock and infrastructure with main focus on the axle bearing health.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2005 National Institutes of Health (NIH) Consensus Conference proposed new criteria for diagnosing and scoring the severity of chronic graft-versus-host disease (GVHD). The 2014 NIH consensus maintains the framework of the prior consensus with further refinement based on new evidence. Revisions have been made to address areas of controversy or confusion, such as the overlap chronic GVHD subcategory and the distinction between active disease and past tissue damage. Diagnostic criteria for involvement of mouth, eyes, genitalia, and lungs have been revised. Categories of chronic GVHD should be defined in ways that indicate prognosis, guide treatment, and define eligibility for clinical trials. Revisions have been made to focus attention on the causes of organ-specific abnormalities. Attribution of organ-specific abnormalities to chronic GVHD has been addressed. This paradigm shift provides greater specificity and more accurately measures the global burden of disease attributed to GVHD, and it will facilitate biomarker association studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyses some aspects of the trajectory of the Argentinian physician and sociologist Juan César García (1932-1984) in the field of Latin American Social Medicine. Three dimensions constituting his basic orientations are highlighted: the elaboration of systematic and reflective social thought; a critical attitude in questioning teaching and professional practices; a commitment to the institutionalization and dissemination of health knowledge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: A cross-cultural, randomized study was proposed to observe the effects of a school-based intervention designed to promote physical activity and healthy eating among high school students in 2 cities from different regions in Brazil: Recife and Florianopolis. The objective of this article is to describe the methodology and subjects enrolled in the project. Methods: Ten schools from each region were matched and randomized into intervention and control conditions. A questionnaire and anthropometry were used to collect data in the first and last month of the 2006 school year. The sample (n = 2155 at baseline; 55.7% females; 49.1% in the experimental group) included students 15 to 24 years, attending nighttime classes. The intervention focused on simple environmental/organizational changes, diet and physical activity education, and personnel training. Results: The central aspects of the intervention have been implemented in all 10 intervention schools. Problems during the intervention included teachers' strikes in both sites and lack of involvement of the canteen owners in schools. Conclusions: The Saude no Boa study provides evidence that public high schools in Brazil represent an important environment for health promotion. Its design and simple measurements increase the chances of it being sustained and disseminated to similar schools in Brazil.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: We evaluated the effectiveness of a school-based intervention on the promotion of physical activity among high school students in Brazil: the Saude no Boa project. Methods: A school-based, randomized trial was carried out in 2 Brazilian cities: Recife (northeast) and Florianopolis (south). Ten schools in each city were matched by size and location, and randomized into intervention or control groups. The intervention included environmental/organizational changes, physical activity education, and personnel training and engagement. Students age 15 to 24 years were evaluated at baseline and 9 months later (end of school year). Results: Although similar at baseline, after the intervention, the control group reported significantly fewer d/wk accumulating 60 minutes+ moderate-to-vigorous physical activity (MVPA) in comparison with the intervention group (2.6 versus 3.3, P < .001). The prevalence of inactivity (0 days per week) rose in the control and decreased in the intervention group. The odds ratio for engaging at least once per week in physical activity associated with the intervention was 1.83 (95% CI = 1.24-2.71) in the unadjusted analysis and 1.88 (95% CI = 1.27-2.79) after controlling for gender. Conclusion: The Saude no Boa intervention was effective at reducing the prevalence of physical inactivity. The possibility of expanding the intervention to other locations should be considered.