Scheduling Ontology Engineering Projects Using gOntt


Autoria(s): Suárez-Figueroa, Mari Carmen; Gómez-Pérez, A.; Muñoz-García, O.
Data(s)

2012

Resumo

In order to manage properly ontology development projects in complex settings and to apply correctly the NeOn Methodology, it is crucial to have knowledge of the entire ontology development life cycle before starting the development projects. The ontology project plan and scheduling helps the ontology development team to have this knowledge and to monitor the project execution. To facilitate the planning and scheduling of ontology development projects, the NeOn Toolkit plugin called gOntt has been developed. gOntt is a tool that supports the scheduling of ontology network development projects and helps to execute them. In addition, prescriptive methodological guidelines for scheduling ontology development projects using gOntt are provided.

Formato

application/pdf

Identificador

http://oa.upm.es/21468/

Idioma(s)

spa

Publicador

Facultad de Informática (UPM)

Relação

http://oa.upm.es/21468/1/Scheduling_Ontology_Engineering_Projects_Using_gOntt.pdf

info:eu-repo/semantics/altIdentifier/doi/10.1007/978-3-642-24794-1_14

Direitos

(c) Editor/Autor

info:eu-repo/semantics/restrictedAccess

Fonte

Scheduling Ontology Engineering Projects Using gOntt | En: Ontology Engineering in a Networked World | pag. 303-317 | Springer Berlin Heidelberg | 2012

Palavras-Chave #Informática
Tipo

info:eu-repo/semantics/bookPart

Sección de Libro

PeerReviewed