811 resultados para Performance levels
Resumo:
This study on risk and disaster management capacities of four Caribbean countries: Barbados, the Dominican Republic, Jamaica, and Trinidad and Tobago, examines three main dimensions: 1) the impact of natural disasters from 1900 to 2010 (number of events, number of people killed, total number affected, and damage in US$); 2) institutional assessments of disaster risk management disparity; and 3) the 2010 Inter-American Bank for Development (IADB) Disaster Risk and Risk Management indicators for the countries under study. The results show high consistency among the different sources examined, pointing out the need to extend the IADB measurements to the rest of the Caribbean countries. Indexes and indicators constitute a comparison measure vis-à-vis existing benchmarks in order to anticipate a capacity to deal with adverse events and their consequences; however, the indexes and indicators could only be tested against the occurrence of a real event. Therefore, the need exists to establish a sustainable and comprehensive evaluation system after important disasters to assess a country‘s performance, verify the indicators, and gain feedback on measurement systems and methodologies. There is diversity in emergency and preparedness for disasters in the four countries under study. The nature of the event (hurricanes, earthquakes, floods, and seismic activity), especially its frequency and the intensity of the damage experienced, is related to how each has designed its risk and disaster management policies and programs to face natural disasters. Vulnerabilities to disaster risks have been increasing, among other factors, because of uncontrolled urbanization, demographic density and poverty increase, social and economic marginalization, and lack of building code enforcement. The four countries under study have shown improvements in risk management capabilities, yet they are far from being completed prepared. Barbados‘ risk management performance is superior, in comparison, to the majority of the countries of the region. However, is still far in achieving high performance levels and sustainability in risk management, primarily when it has the highest gap between potential macroeconomic and financial losses and the ability to face them. The Dominican Republic has shown steady risk performance up to 2008, but two remaining areas for improvement are hazard monitoring and early warning systems. Jamaica has made uneven advances between 1990 and 2008, requiring significant improvements to achieve high performance levels and sustainability in risk management, as well as macroeconomic mitigation infrastructure. Trinidad and Tobago has the lowest risk management score of the 15 countries in the Latin American and Caribbean region as assessed by the IADB study in 2010, yet it has experienced an important vulnerability reduction. In sum, the results confirmed the high disaster risk management disparity in the Caribbean region.
Resumo:
Public schools traditionally have been held accountable for educating the majority of the nation’s school children, and through the years, these schools have been evaluated in a variety of ways. Currently, evaluation measures for accountability purposes consist solely of standardized test scores. In the past, only test scores of general education students were analyzed. Laws governing the education of students with disabilities, however, have extended accountability measures not only to include those students, but to report their scores in a disaggregated form (No Child Left Behind Act, 2001). The recent emphasis on accountability and compliance has resulted in the need for schools to carefully examine how programs, services, and policies impact student achievement (Bowers & Figgers, 2003). ^ Standard-based school reform and accountability systems have raised expectations about student learning outcomes for all students, including those with disabilities and minority students. Yet, overall, racial/ethnic minority students are performing well below their White non-Hispanic peers in most academic areas. Additionally, with respect to special education, there exists an enduring problem of disproportionate representation of racial/ethnic minority students (National Research Council, 2000). ^ This study examined classroom placement (inclusive versus non-inclusive) relative to academic performance of urban, low socioeconomic Hispanic students with and without disabilities in secondary content area classrooms. A mixed method research design was used to investigate this important issue using data from a local school district and results from field observations. The study compared performance levels of four middle school Hispanic student subgroups (students with disabilities in inclusive settings, students without disabilities in inclusive settings, students with disabilities in resource settings, and student without disabilities in general education settings) each in their respective placements for two consecutive years, exploring existing practices within authentic settings. ^ Significant differences were found in the relationship of educational placement and achievement between grade level and disability in the areas of math and reading. Additionally, clear and important differences were observed in student-teacher interactions. Recommendations for further researchers and stakeholders include soliciting responses from teams at the schools composed of general education and special education teachers, administrative personnel, and students as well as broadening the study across grade levels and exceptionalities. ^
Resumo:
This study on risk and disaster management capacities of four Caribbean countries: Barbados, the Dominican Republic, Jamaica, and Trinidad and Tobago, examines three main dimensions: 1) the impact of natural disasters from 1900 to 2010 (number of events, number of people killed, total number affected, and damage in US$); 2) institutional assessments of disaster risk management disparity; and 3) the 2010 Inter-American Bank for Development (IADB) Disaster Risk and Risk Management indicators for the countries under study. The results show high consistency among the different sources examined, pointing out the need to extend the IADB measurements to the rest of the Caribbean countries. Indexes and indicators constitute a comparison measure vis-à-vis existing benchmarks in order to anticipate a capacity to deal with adverse events and their consequences; however, the indexes and indicators could only be tested against the occurrence of a real event. Therefore, the need exists to establish a sustainable and comprehensive evaluation system after important disasters to assess a country’s performance, verify the indicators, and gain feedback on measurement systems and methodologies. There is diversity in emergency and preparedness for disasters in the four countries under study. The nature of the event (hurricanes, earthquakes, floods, and seismic activity), especially its frequency and the intensity of the damage experienced, is related to how each has designed its risk and disaster management policies and programs to face natural disasters. Vulnerabilities to disaster risks have been increasing, among other factors, because of uncontrolled urbanization, demographic density and poverty increase, social and economic marginalization, and lack of building code enforcement. The four countries under study have shown improvements in risk management capabilities, yet they are far from being completed prepared. Barbados’ risk management performance is superior, in comparison, to the majority of the countries of the region. However, is still far in achieving high performance levels and sustainability in risk management, primarily when it has the highest gap between potential macroeconomic and financial losses and the ability to face them. The Dominican Republic has shown steady risk performance up to 2008, but two remaining areas for improvement are hazard monitoring and early warning systems. Jamaica has made uneven advances between 1990 and 2008, requiring significant improvements to achieve high performance levels and sustainability in risk management, as well as macroeconomic mitigation infrastructure. Trinidad and Tobago has the lowest risk management score of the 15 countries in the Latin American and Caribbean region as assessed by the IADB study in 2010, yet it has experienced an important vulnerability reduction. In sum, the results confirmed the high disaster risk management disparity in the Caribbean region.
Resumo:
Shipboard power systems have different characteristics than the utility power systems. In the Shipboard power system it is crucial that the systems and equipment work at their peak performance levels. One of the most demanding aspects for simulations of the Shipboard Power Systems is to connect the device under test to a real-time simulated dynamic equivalent and in an environment with actual hardware in the Loop (HIL). The real time simulations can be achieved by using multi-distributed modeling concept, in which the global system model is distributed over several processors through a communication link. The advantage of this approach is that it permits the gradual change from pure simulation to actual application. In order to perform system studies in such an environment physical phase variable models of different components of the shipboard power system were developed using operational parameters obtained from finite element (FE) analysis. These models were developed for two types of studies low and high frequency studies. Low frequency studies are used to examine the shipboard power systems behavior under load switching, and faults. High-frequency studies were used to predict abnormal conditions due to overvoltage, and components harmonic behavior. Different experiments were conducted to validate the developed models. The Simulation and experiment results show excellent agreement. The shipboard power systems components behavior under internal faults was investigated using FE analysis. This developed technique is very curial in the Shipboard power systems faults detection due to the lack of comprehensive fault test databases. A wavelet based methodology for feature extraction of the shipboard power systems current signals was developed for harmonic and fault diagnosis studies. This modeling methodology can be utilized to evaluate and predicate the NPS components future behavior in the design stage which will reduce the development cycles, cut overall cost, prevent failures, and test each subsystem exhaustively before integrating it into the system.
Resumo:
Bayesian adaptive methods have been extensively used in psychophysics to estimate the point at which performance on a task attains arbitrary percentage levels, although the statistical properties of these estimators have never been assessed. We used simulation techniques to determine the small-sample properties of Bayesian estimators of arbitrary performance points, specifically addressing the issues of bias and precision as a function of the target percentage level. The study covered three major types of psychophysical task (yes-no detection, 2AFC discrimination and 2AFC detection) and explored the entire range of target performance levels allowed for by each task. Other factors included in the study were the form and parameters of the actual psychometric function Psi, the form and parameters of the model function M assumed in the Bayesian method, and the location of Psi within the parameter space. Our results indicate that Bayesian adaptive methods render unbiased estimators of any arbitrary point on psi only when M=Psi, and otherwise they yield bias whose magnitude can be considerable as the target level moves away from the midpoint of the range of Psi. The standard error of the estimator also increases as the target level approaches extreme values whether or not M=Psi. Contrary to widespread belief, neither the performance level at which bias is null nor that at which standard error is minimal can be predicted by the sweat factor. A closed-form expression nevertheless gives a reasonable fit to data describing the dependence of standard error on number of trials and target level, which allows determination of the number of trials that must be administered to obtain estimates with prescribed precision.
Resumo:
Introduction
Evaluating quality of palliative day services is essential for assessing care across diverse settings, and for monitoring quality improvement approaches.
Aim
To develop a set of quality indicators for assessment of all aspects (structure, process and outcome) of care in palliative day services.
Methods
Using a modified version of the RAND/UCLA appropriateness method (Fitch et al., 2001), a multidisciplinary panel of 16 experts independently completed a survey rating the appropriateness of 182 potential quality indicators previously identified during a systematic evidence review. Panel members then attended a one day, face-to-face meeting where indicators were discussed and subsequently re-rated. Panel members were also asked to rate the feasibility and necessity of measuring each indicator.
Results
71 indicators classified as inappropriate during the survey were removed based on median appropriateness ratings and level of agreement. Following the panel discussions, a further 60 were removed based on appropriateness and feasibility ratings, level of agreement and assessment of necessity. Themes identified during the panel discussion and findings of the evidence review were used to translate the remaining 51 indicators into a final set of 27.
Conclusion
The final indicator set included information on rationale and supporting evidence, methods of assessment, risk adjustment, and recommended performance levels. Further implementation work will test the suitability of this ‘toolkit’ for measurement and benchmarking. The final indicator set provides the basis for standardised assessment of quality across services, including care delivered in community and primary care settings.
Reference
• Fitch K, Bernstein SJ, Aguilar MD, et al. The RAND/UCLA Appropriateness Method User’s Manual. Santa Monica, CA: RAND Corporation; 2001. http://www.rand.org/pubs/monograph_reports/MR1269
Resumo:
Os ritmos circadianos têm vindo a despertar interesse há largos anos, sabendo-se que cada indivíduo tem a sua preferência pessoal por estar ativo a diferentes horas do dia. A noção de cronótipo traduz esta preferência, classificando-nos em matutinos, intermédios, ou vespertinos. Encontra-se já definida uma relação entre o cronótipo de um indivíduo e a hora do dia a que realiza determinadas tarefas, fator que influencia o desempenho em muitos processos cognitivos, observando-se o designado efeito de sincronia: o desempenho atinge o seu pico quando a tarefa se realiza na hora ótima, aquela que se coaduna com a hora preferencial da pessoa. Desse modo, sujeitos matutinos têm frequentemente um melhor desempenho em diversas tarefas durante a manhã, e sujeitos vespertinos ao final do dia. O presente estudo pretendeu verificar se este efeito influencia o processo de emparelhamento de faces não familiares, tarefa em que o desempenho é por norma pobre. Nesse sentido, 33 participantes (17 matutinos e 16 vespertinos) avaliaram os 168 pares de faces (84 em cada sessão) que compõem o Glasgow Face Matching Test, e decidiram se as duas pertenciam à mesma pessoa, ou a pessoas diferentes. A tarefa foi realizada em duas sessões, uma às 9h e outra às 19h, para avaliar o efeito de sincronia. Verificou-se um efeito de interação significativo entre o cronótipo e a hora ótima no tempo de reação dos participantes, quando acertavam a sua resposta. Parte dos nossos resultados foram de encontro ao esperado, com os participantes vespertinos a serem mais rápidos na sua hora ótima. É sugerida então a existência de alguma influência do cronótipo e da hora do dia na rapidez de processamento e emparelhamento de faces não familiares.
Resumo:
Valveless pulsejets are extremely simple aircraft engines; essentially cleverly designed tubes with no moving parts. These engines utilize pressure waves, instead of machinery, for thrust generation, and have demonstrated thrust-to-weight ratios over 8 and thrust specific fuel consumption levels below 1 lbm/lbf-hr – performance levels that can rival many gas turbines. Despite their simplicity and competitive performance, they have not seen widespread application due to extremely high noise and vibration levels, which have persisted as an unresolved challenge primarily due to a lack of fundamental insight into the operation of these engines. This thesis develops two theories for pulsejet operation (both based on electro-acoustic analogies) that predict measurements better than any previous theory reported in the literature, and then uses them to devise and experimentally validate effective noise reduction strategies. The first theory analyzes valveless pulsejets as acoustic ducts with axially varying area and temperature. An electro-acoustic analogy is used to calculate longitudinal mode frequencies and shapes for prescribed area and temperature distributions inside an engine. Predicted operating frequencies match experimental values to within 6% with the use of appropriate end corrections. Mode shapes are predicted and used to develop strategies for suppressing higher modes that are responsible for much of the perceived noise. These strategies are verified experimentally and via comparison to existing models/data for valveless pulsejets in the literature. The second theory analyzes valveless pulsejets as acoustic systems/circuits in which each engine component is represented by an acoustic impedance. These are assembled to form an equivalent circuit for the engine that is solved to find the frequency response. The theory is used to predict the behavior of two interacting pulsejet engines. It is validated via comparison to experiment and data in the literature. The technique is then used to develop and experimentally verify a method for operating two engines in anti-phase without interfering with thrust production. Finally, Helmholtz resonators are used to suppress higher order modes that inhibit noise suppression via anti-phasing. Experiments show that the acoustic output of two resonator-equipped pulsejets operating in anti-phase is 9 dBA less than the acoustic output of a single pulsejet.
Resumo:
Dissertação de Mestrado em Ciências da Educação - Especialização em Animação da Leitura, apresentada à Escola Superior de Educação de Paula Frassinetti
Resumo:
Trabalho de projeto apresentado à Escola Superior de Educação de Paula Frassinetti para obtenção do grau de Mestre em Ciências da Educação Especialização em Supervisão Pedagógica
Resumo:
Mestrado em Contabilidade, Fiscalidade e Finanças Empresariais
Resumo:
Mestrado em Ciências Empresariais
Resumo:
Provas públicas apresentadas à Escola Superior de Educação do Instituto Politécnico de Castelo Branco para o cumprimento dos requisitos necessários à obtenção do título de Professor Especialista, na área do Futebol.
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.