859 resultados para Flexible service systems
Resumo:
Flexible Assembly Systems (FASs) are normally associated with the automatic, or robotic, assembly of products, supported by automated material handling systems. However, manual assembly operations are still prevalent within many industries, where the complexity and variety of products prohibit the development of suitable automated assembly equipment. This article presents a generic model for incorporating flexibility into the design and control of assembly operations concerned with high variety/low volume manufacture, drawing on the principles for Flexible Manufacturing Systems (FMS) and Just-in-Time (JIT) delivery. It is based on work being undertaken in an electronics company where the assembly operations have been overhauled and restructured in response to a need for greater flexibility, shorter cycle times and reduced inventory levels. The principles employed are in themselves not original. However, the way they have been combined and tailored has created a total manufacturing control system which represents a new concept for responding to demands placed on market driven firms operating in an uncertain environment.
Resumo:
Organisations have been approaching servitisation in an unstructured fashion. This is partially because there is insufficient understanding of the different types of Product-Service offerings. Therefore, a more detailed understanding of Product-Service types might advance the collective knowledge and assist organisations that are considering a servitisation strategy. Current models discuss specific aspects on the basis of few (or sometimes single) dimensions. In this paper, we develop a comprehensive model for classifying traditional and green Product-Service offerings, thus combining business and green offerings in a single model. We describe the model building process and its practical application in a case study. The model reveals the various traditional and green options available to companies and identifies how to compete between services; it allows servitisation positions to be identified such that a company may track its journey over time. Finally it fosters the introduction of innovative Product-Service Systems as promising business models to address environmental and social challenges. © 2013 Elsevier Ltd. All rights reserved.
Resumo:
Aircraft assembly is the most important part of aircraft manufacturing. A large number of assembly fixtures must be used to ensure the assembly accuracy in the aircraft assembly process. Traditional fixed assembly fixture could not satisfy the change of the aircraft types, so the digital flexible assembly fixture was developed and was gradually applied in the aircraft assembly. Digital flexible assembly technology has also become one of the research directions in the field of aircraft manufacturing. The aircraft flexible assembly can be divided into three assembly stages that include component-level flexible assembly, large component-level flexible assembly, and large components alignment and joining. This article introduces the architecture of flexible assembly systems and the principles of three types of flexible assembly fixtures. The key technologies of the digital flexible assembly are also discussed. The digital metrology system provides the basis for the accurate digital flexible assembly. Aircraft flexible assembly systems mainly use laser tracking metrology systems and indoor Global Positioning System metrology systems. With the development of flexible assembly technology, the digital flexible assembly system will be widely used in current aircraft manufacturing.
Resumo:
Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.
Resumo:
Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.
Resumo:
The Family Model – A transgenerational approach to mental health in families This workshop will provide an overview on The Family Model (TFM) and its use in promoting and facilitating a transgenerational family focus in Mental Health services, over the past 10 - 15 years. Each of the speakers will address a different perspective, including service user/consumer, clinical practice, education & training, research and policy. Adrian Falkov (chair) will provide an overview of TFM to set the scene and a ‘policy to practice’ perspective, based on use of TFM in Australia. Author: Heide Lloyd. The Family Model A personal (consumer/patient) perspective | United Kingdom Heide will provide a description of her experiences as a child, adult, parent & grandparent, using TFM as the structure around which to ‘weave’ her story and demonstrate how TFM has assisted her in understanding the impact of symptoms on her & family and how she has used it in her management of symptoms and recovery (personal perspective). The Family Model Education & training perspective Marie Diggins | United Kingdom PhD Bente Weimand | Norway Authors: Marie Diggins | United Kingdom PhD Bente Weimand | Norway This combined (UK & Norwegian) presentation will cover historical background to TFM and its use in eLearning (the Social Care Institute for Excellence)and a number of other UK initiatives, together with a description of the postgraduate masters course at the University Oslo/Akershus, using TFM. The Family Model A research perspective PhD Anne Grant | Northern Ireland Author: PhD Anne Grant | Ireland Anne Grant will describe how she used TFM as the theoretical framework for her PhD looking at family focused (nursing) practice in Ireland. The Family Model A service systems perspective Mary Donaghy | Northern Ireland Authors: PhD Adrian Falkov | Australia Mary Donaghy | N Ireland Mary Donaghy will discuss how TFM has been used to support & facilitate a cross service ‘whole of system’ change program in Belfast (NI) to achieve improved family focused practice. She will demonstrate its utility in achieving a broader approach to service design, delivery and evaluation.
Resumo:
One of the pioneer firms in the leisure cruise industry embarked on a bold idea in 2000 to offer an unregimented experience unlike most cruises. Despite the appeal of the concept from a marketing perspective, the service innovation posed operational challenges, many of which continue to undermine the firm’s competitive position. Using a multi-method empirical approach and interdisciplinary views that draw on research from marketing and operations management, the authors analyze this business case to identify challenges that service firms face when services are developed and managed from siloed functional perspectives. Based on their research findings and guided by the literature, the authors derive a service-systems model to aid service planning and management. The authors further highlight a new organizational form and function for services under the domain of service experience management that is positioned as a means to unify service operations and marketing for delivering on service promises. The authors offer direction for further research on service operations systems and service experience management.
Resumo:
The continuous flow of technological developments in communications and electronic industries has led to the growing expansion of the Internet of Things (IoT). By leveraging the capabilities of smart networked devices and integrating them into existing industrial, leisure and communication applications, the IoT is expected to positively impact both economy and society, reducing the gap between the physical and digital worlds. Therefore, several efforts have been dedicated to the development of networking solutions addressing the diversity of challenges associated with such a vision. In this context, the integration of Information Centric Networking (ICN) concepts into the core of IoT is a research area gaining momentum and involving both research and industry actors. The massive amount of heterogeneous devices, as well as the data they produce, is a significant challenge for a wide-scale adoption of the IoT. In this paper we propose a service discovery mechanism, based on Named Data Networking (NDN), that leverages the use of a semantic matching mechanism for achieving a flexible discovery process. The development of appropriate service discovery mechanisms enriched with semantic capabilities for understanding and processing context information is a key feature for turning raw data into useful knowledge and ensuring the interoperability among different devices and applications. We assessed the performance of our solution through the implementation and deployment of a proof-of-concept prototype. Obtained results illustrate the potential of integrating semantic and ICN mechanisms to enable a flexible service discovery in IoT scenarios.
Resumo:
Part 4: Transition Towards Product-Service Systems
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
Substance misuse in individuals with schizophrenia is very common, especially in young men, in communities where use is frequent and in people receiving inpatient treatment. Problematic use occurs at very low intake levels, so that most affected people are not physically dependent (with the exception of nicotine). People with schizophrenia and substance misuse have poorer symptomatic and functional outcomes than those with schizophrenia alone. Unless there is routine screening, substance misuse is often missed in assessments. Service systems tend to be separated, with poor inter-communication, and affected patients are often excluded from services because of their comorbidity. However, effective management of these disorders requires a fully integrated approach because of the close inter-relationship of the disorders. Use of atypical antipsychotics may be especially important in this population because of growing evidence (especially on clozapine and risperidone) that nicotine smoking, alcohol misuse and possibly some other substance misuse is reduced. Several pharmacotherapies for substance misuse can be used safely in people with schizophrenia, but the evidence base is small and guidelines for their use are necessarily derived from experience in the general population.
Resumo:
This research deals with an innovative methodology for optimising the coal train scheduling problem. Based on our previously published work, generic solution techniques are developed by utilising a “toolbox” of standard well-solved standard scheduling problems. According to our analysis, the coal train scheduling problem can be basically modelled a Blocking Parallel-Machine Job-Shop Scheduling (BPMJSS) problem with some minor constraints. To construct the feasible train schedules, an innovative constructive algorithm called the SLEK algorithm is proposed. To optimise the train schedule, a three-stage hybrid algorithm called the SLEK-BIH-TS algorithm is developed based on the definition of a sophisticated neighbourhood structure under the mechanism of the Best-Insertion-Heuristic (BIH) algorithm and Tabu Search (TS) metaheuristic algorithm. A case study is performed for optimising a complex real-world coal rail system in Australia. A method to calculate the lower bound of the makespan is proposed to evaluate results. The results indicate that the proposed methodology is promising to find the optimal or near-optimal feasible train timetables of a coal rail system under network and terminal capacity constraints.
Resumo:
Objective The main objective of the project was to explore the barriers and obstacles impeding a person-centred approach to planning and private housing for people with disability. Method Methodologically, the project involved explanation building using a multiple case study approach supported by a contextual study. It focussed initially on three organisations and their attempts to integrate innovative and what they regarded as person-centred models of housing into the private housing market for people with disability. It also included a fourth case highlighting the experiences of individuals with disability in accessing suitable and affordable housing. Results Using an ecological framework, the project found that: • Challenges exist within systems (such as the macro cultural, economic, regulatory systems through to local community, family and intra personal systems) as well as with interaction between systems • Reaching across systems is a key role for organisations and individuals but is very challenging with distance from the individual as well as from the policy/funding/service systems being a key aspect of the nature and extent by which they are challenged • In the case of housing for people with disability a ‘disability space’ is assumed and maintained disparately within each system and is separate from the ‘mainstream space’ with the established policy, legal, funding structures making it difficult to move between the two spaces. Conclusions Based on these findings, the project makes recommendations for government, community organisations, the housing industry, people with disability and their families and support networks, as well as for future research. An overarching recommendation is the need to address housing stock availability and suitability by adopting a mainstream approach rather than a disability-first/disability-specific approach.
Resumo:
Purpose The purpose of this research is to examine the concept of “potential quality” – that is, a company's tangible search qualities (such as the physical servicescape and virtual servicescape) – within the context of the real‐estate industry in the USA. Design/methodology/approach This qualitative study collects data by conducting personal in‐depth interviews with 34 respondents who had been recent buyers or renters of property. The data are then coded and themed to identify quality dimensions relevant to this industry. Findings The results indicate that a buyer's perception of the overall service quality of real‐estate service consists of two components: the interaction with a realtor (process quality); and the virtual servicescape, especially the firm's website design and content (potential quality). The study concludes that existing scales (such as SERVQUAL and RESERV) fail to capture the tangible component of service quality sufficiently in the real‐estate industry. Research limitations/implications The study uses data from only one industry (real estate) and from only one demographic segment (professionals in higher education). Practical implications Service providers of intangible, high‐contact services must appreciate the importance of the virtual servicescape as a surrogate quality indicator that can help to reduce information asymmetries and consumers' uncertainty with regard to initiating a business relationship. Real estate firms need to pay attention to the training of agents and the design and content of their e‐service systems. Originality/value This study integrates potential quality, process quality, and outcome quality in a comprehensive proposed model. In particular, the study identifies “potential quality” as a combination of the attributes of the virtual service environment and the physical service environment.
Resumo:
Production scheduling in a flexible manufacturing system (FMS) is a real-time combinatorial optimization problem that has been proved to be NP-complete. Solving this problem needs on-line monitoring of plan execution and requires real-time decision-making in selecting alternative routings, assigning required resources, and rescheduling when failures occur in the system. Expert systems provide a natural framework for solving this kind of NP-complete problems.In this paper an expert system with a novel parallel heuristic approach is implemented for automatic short-term dynamic scheduling of FMS. The principal features of the expert system presented in this paper include easy rescheduling, on-line plan execution, load balancing, an on-line garbage collection process, and the use of advanced knowledge representational schemes. Its effectiveness is demonstrated with two examples.