982 resultados para Construction sites.


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In her thesis, Kaisa Kaakinen analyzes how the German emigrant author W. G. Sebald (1944-2001) uses architecture and photography in his last novel "Austerlitz" to represent time, history and remembering. Sebald describes time in spatial terms: it is like a building, the rooms and chambers of which are connected to each other. The poetics of spatial time manifests itself on multiple levels of the text. Kaakinen traces it in architectural representations, photographic images, intertextuality, as well as in the form of the text, using the concept of spatial form by Joseph Frank. Architectural and photographic representations serve as meeting points for different aspects and angles of the novel and illustrate the idea of a layered present that has multiple connections to the past. The novel tells a story of Jacques Austerlitz, who as a small child was sent from Prague to Britain in one of the so-called Kindertransports that saved children from Central Europe occupied by the National Socialists. Only gradually he remembers his Jewish parents, who have most likely perished in Nazi concentration camps. The novel brings the problematic of writing about another person's past to the fore by the fact that Austerlitz's story is told by an anonymous narrator, Austerlitz's interlocutor, who listens to and writes down Austerlitz's story. Kaakinen devotes the final part of her thesis to study the demands of representing a historical trauma, drawing on authors such as Dominick LaCapra and Michael Rothberg. Through the analysis of architectural and photographic representations in the novel, she demonstrates how Austerlitz highlights the sense of singularity and inaccessibility of memories of an individual, while also stressing the necessity - and therefore a certain kind of possibility - of passing these memories to another person. The coexistence of traumatic narrowness and of the infinity of history is reflected in ambivalent buildings. Some buildings in the novel resemble reversible figures: they can be perceived simultaneously as ruins and as construction sites. Buildings are also shown to be able to both cover and preserve memories - an idea that also is repeated in the use of photography, which tends to both replace memories and cause an experience of the presence of an absent thing. Commenting and critisizing some recent studies on Sebald, the author develops a reading which stresses the ambivalence inherent in Sebald's view on history and historiography. Austerlitz shows the need to recognize the inevitable absence of the past as well as the distance from the experiences of others. Equally important, however, is the refusal to give up narrating the past: Sebald's novel stresses the necessity to preserve the sites of the past, which carry silent traces of vanished life. The poetics of Austerlitz reflects the paradox of the simultaneous impossibility and indispensability of writing history.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aim of this project is to construct a large-scale erosion control education and demonstration facility at Redland Research Station. This will be done in collaboration with the Australian turf industry (as members of the steering committee) and consultant researcher Dr Rob Loch (project partner). The project will employ a part-time industry development officer (IDO) for Turf Australia to increase engagement with the project by the target audience. The project’s main strategy is to extend the research results from HAL funded project Optimising Turf Use to Minimise Soil Erosion on Construction Sites TU08033 so that the maximum return on investment can be derived for the turf levy payers and HAL from that study.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Intrusion (unauthorized stepping-into/staying-in a hazardous area), as a common type of near-miss, is the prime cause of the majority of incidents on construction sites including fall from heights, and striking against or being struck by moving objects. Accidents often occur because workers take shortcuts moving about the site without fully perceiving the potential dangers. A number of researches have been devoted to developing methods to prevent such behaviors mainly based on the theory of Behavior-Based Safety (BBS), which aims to cultivate safety behaviors among workers in accordance with safety regulations. In current BBS practice, trained observers and safety supervisors are responsible for safety behavior inspections following safety plans and operation regulations. The observation process is time-consuming and its effectiveness depends largely on the observer’s safety knowledge and experience, which often results in omissions or bias. This paper presents a reformed safety behavior modification approach by integrating a location-based technology with BBS. Firstly, a detailed background is provided, covering current intrusion problems on site, existing use of BBS for behavior improvement, difficulties in achieving widespread adoption and potential technologies for location tracking and in-time feedback. Then, a conceptual framework of positioning technology-enhanced BBS is developed, followed by details of the corresponding on-line supporting system, Real Time Location System (RTLS) and Virtual Construction System (VCS). The application of the system is then demonstrated and tested in a construction site in Hong Kong. Final comments are made concerning further research direction and prospects for wider adoption.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este trabalho tem por objetivo contribuir para a melhoria do gerenciamento do processo construtivo de execução de pontes e viadutos em estruturas segmentadas pré-moldadas protendidas, construídas em balanços sucessivos, com base em uma análise das metodologias adotadas e verificando a viabilidade de implantação de um modelo nos processos de gestão que utilizam métodos industriais para execução de obras de arte especiais. A partir da revisão da literatura técnica disponível e tomando como referência os métodos construtivos utilizados em dois canteiros de obras distintos, analisa-se a metodologia de gerenciamento construtivo adotada visando ao aperfeiçoamento do processo de fabricação e montagem, e consequente redução dos custos, desperdícios e prazos. Dentre os vários aspectos observados, ressalta-se a importância de se utilizar uma ferramenta de gerenciamento de projeto nas obras de pontes pré-moldadas, por se mostrarem um processo industrializado, repetitivo e com funcionamento similar a uma unidade fabril. Neste contexto, esta pesquisa visa fornecer subsídios para que se possam estabelecer diretrizes para uma melhor integração do projeto com a construção e conseqüente melhoria da execução nos canteiros de obras.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A implantação de práticas de gestão ambiental nos canteiros de obras se tornou de fundamental importância para o setor da construção civil. Nas obras de edificação que visam obter a certificação LEED, são implementadas práticas que buscam a minimização e o reaproveitamento dos resíduos de construção civil, representando uma possibilidade de redução dos impactos ambientais produzidos pelo setor. Este trabalho apresenta um estudo comparativo sobre a geração de resíduos de quatro obras de edificações no município do Rio de Janeiro, sendo que duas delas implantaram práticas para obtenção da certificação LEED. Complementarmente, foi realizada uma pesquisa através de questionário com profissionais da construção civil buscando identificar a sua percepção sobre construções sustentáveis e gerenciamento de resíduos sólidos. Desconsiderando o solo de escavação, o entulho foi o resíduo mais gerado em todas as quatro obras, seguido pela sucata metálica, resíduos não recicláveis e madeira. A obra com certificação LEED apresentou o menor índice total de resíduos, 119,23 kg/m2, sendo este valor próximo às médias de países desenvolvidos.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aim of the seawater irrigation system (SIS) is to clean up shrimp pond effluent and provide high quality seawater for shrimp farming. The system has 3 components: water intake; treatment reservoir and discharge system. There are criteria for site selection because shrimp farmers are required to form associations so they can work closely together. The construction site must be on the coastal area outside a mangrove forest and located away from a production agricultural area. All construction sites must have undergone an environmental impact assessment, and should be located on the area listed in Thailand's Coastal Zone Management Plan. Five SIS projects, which cover a culture area of 6,500 ha with 1,300 farmers (families), were completed and operated. The Department of Fisheries has planned for another 28 projects, that will cover almost 44,000 ha of culture area.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tracking of project related entities such as construction equipment, materials, and personnel is used to calculate productivity, detect travel path conflicts, enhance the safety on the site, and monitor the project. Radio frequency tracking technologies (Wi-Fi, RFID, UWB) and GPS are commonly used for this purpose. However, on large-scale sites, deploying, maintaining and removing such systems can be costly and time-consuming. In addition, privacy issues with personnel tracking often limits the usability of these technologies on construction sites. This paper presents a vision based tracking framework that holds promise to address these limitations. The framework uses videos from a set of two or more static cameras placed on construction sites. In each camera view, the framework identifies and tracks construction entities providing 2D image coordinates across frames. Combining the 2D coordinates based on the installed camera system (the distance between the cameras and the view angles of them), 3D coordinates are calculated at each frame. The results of each step are presented to illustrate the feasibility of the framework.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

On-site tracking in open construction sites is often difficult because of the large amounts of items that are present and need to be tracked. Additionally, the amounts of occlusions/obstructions present create a highly complex tracking environment. Existing tracking methods are based mainly on Radio Frequency technologies, including Global Positioning Systems (GPS), Radio Frequency Identification (RFID), Bluetooth and Wireless Fidelity (Wi-Fi, Ultra-Wideband, etc). These methods require considerable amounts of pre-processing time since they need to manually deploy tags and keep record of the items they are placed on. In construction sites with numerous entities, tags installation, maintenance and decommissioning become an issue since it increases the cost and time needed to implement these tracking methods. This paper presents a novel method for open site tracking with construction cameras based on machine vision. According to this method, video feed is collected from on site video cameras, and the user selects the entity he wishes to track. The entity is tracked in each video using 2D vision tracking. Epipolar geometry is then used to calculate the depth of the marked area to provide the 3D location of the entity. This method addresses the limitations of radio frequency methods by being unobtrusive and using inexpensive, and easy to deploy equipment. The method has been implemented in a C++ prototype and preliminary results indicate its effectiveness

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tracking applications provide real time on-site information that can be used to detect travel path conflicts, calculate crew productivity and eliminate unnecessary processes at the site. This paper presents the validation of a novel vision based tracking methodology at the Egnatia Odos Motorway in Thessaloniki, Greece. Egnatia Odos is a motorway that connects Turkey with Italy through Greece. Its multiple open construction sites serves as an ideal multi-site test bed for validating construction site tracking methods. The vision based tracking methodology uses video cameras and computer algorithms to calculate the 3D position of project related entities (e.g. personnel, materials and equipment) in construction sites. The approach provides an unobtrusive, inexpensive way of effectively identifying and tracking the 3D location of entities. The process followed in this study starts by acquiring video data from multiple synchronous cameras at several large scale project sites of Egnatia Odos, such as tunnels, interchanges and bridges under construction. Subsequent steps include the evaluation of the collected data and finally, performing the 3D tracking operations on selected entities (heavy equipment and personnel). The accuracy and precision of the method's results is evaluated by comparing it with the actual 3D position of the object, thus assessing the 3D tracking method's effectiveness.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purpose of this supplemental project was to collect invaluable data from the large-scale construction sites of Egnatia Odos motorway needed to validate a novel automated vision-tracking method created under the parent grant. For this purpose, one US graduate and three US undergraduate students traveled to Greece for 4 months and worked together with 2 Greek graduate students of the local faculty collaborator. This team of students monitored project activities and scheduled data collection trips on a daily basis, setup a mobile video data collection lab on the back of a truck, and drove to various sites every day to collect hundreds of hours of video from multiple cameras on a large variety of activities ranging from soil excavation to bridge construction. The US students were underrepresented students from minority groups who had never visited a foreign country. As a result, this trip was a major life experience to them. They learned how to live in a non-English speaking country, communicate with Greek students, workers and engineers. They lead a project in a very unfamiliar environment, troubleshoot myriad problems that hampered their progress daily and, above all, how to collaborate effectively and efficiently with other cultures. They returned to the US more mature, with improved leadership and problem-solving skills and a wider perspective of their profession.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Effective data communications between the project site and decision making office can be critical for the success of a construction project. It allows convenient access to centrally stored information and allows centrally located decision makers to remotely monitor the site and collect data in real-time. However, high bandwidth, flexible data communication networks, such as wired local area networks, can often be time-consuming and costly to deploy for such purposes especially when project sites (dams, highways, etc.) are located in rural, undeveloped areas where networking infrastructure is not available. In such construction sites, wireless networking could reliably link the construction site and the decision-making office. This paper presents a case study on long-distance, site – office wireless data communications. The purpose was to investigate the capability of wireless technology in exchanging construction data in a fast and efficient manner and in allowing site personnel to interact and share knowledge and data with the office staff. This study took place at the University of Michigan’s campus where performance, reliability, and cost/benefit tests were performed. The indoor and outdoor tests performed demonstrated the suitability of this technology for office-site data communications and exposed the need for more research to further improve the reliability and data handling of this technology.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Os resíduos sólidos (RS) têm vindo a aumentar em quantidade e diversidade nas últimas décadas em todo o mundo, em resultado da explosão demográfica, do crescimento económico e do aumento da construção, acentuando-se também a produção de resíduos perigosos. Por estas mesmas razões têm surgido limitações do espaço disponível para deposição final de RS. A prática atual no sector da construção pode ser alterada através da introdução de uma gestão eficiente, optimizadora de custos, com a produção de menos resíduos produzidos e também através da implementação de medidas preventivas de produção de resíduos nas obras. Pretende-se, no âmbito deste trabalho, abordar a problemática da gestão de resíduos de construção em obra e contribuir para alterar a situação descrita, apresentando e validando ferramentas a utilizar na gestão de RS. O principal objetivo do trabalho é avaliar os impactes ambientais associados à gestão dos resíduos produzidos na obra na fase de construção. Nas obras em estudo foi recolhida informação sobre os resíduos (quantidades e tipologia) e analisada, tratada com a finalidade de criar uma ferramenta indispensável na gestão de resíduos de construção e compilado o inventário dos resíduos. Após esta compilação, procedeu-se à avaliação dos impactes. A aplicação da ferramenta de avaliação de ciclo de vida permitem avaliar o impacte das decisões na sustentabilidade da construção, nomeadamente no que diz respeito à geração de resíduos.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The paper reviews the study and use of urban consolidation centres (UCCs) which are a freight transport initiative intended to reduce goods vehicle traffic, vehicle-related greenhouse gas emissions and local air pollution. An international literature review has identified 114 UCC schemes in 17 countries (12 in the European Union (EU) and 5 outside the EU) that have been the subject of either a feasibility study, trial or a fully operational scheme in the last 40 years. The period from 2006 to 2010 has been the most active 5-year period in terms of UCC study, trial and scheme generation since the first UCC study was carried out in the early 1970s. Five countries account for the majority of all the 114 UCC schemes identified: France, Germany, Italy, the Netherlands and the UK. The vast majority of UCCs serve either all or part of an urban area. Examples of UCCs serving a single property (such as an airport or shopping centre) and construction sites have also been identified. Key organizational, operational, and financial issues that are critical to the success of UCCs are discussed. The traffic and environmental impacts of UCC trials and fully operational schemes are also reviewed.