883 resultados para Civil construction. Quality management. Lean construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The project is committed to understanding, recognising and developing various forms of institutionally relevant distributed leadership in developing and trialling various components of a quality management framework for online learning environments in Australian higher education. This paper provides an overview of issues related to the management and improvement of quality, including in the context of higher education. In response to the complex and multi-dimensional nature of both quality and online learning environments (OLEs), the concept of a framework for organising policies, procedures and actions relating to the good governance of OLEs can be found in the literature. Such frameworks vary in scope, format and title, and a (non-exhaustive) sample is presented in summary here. Key learnings that can be drawn from the exemplars frameworks and the related literature include:
- the processes for the design of such frameworks;
- the components of such frameworks;
- the measurement mechanisms and metrics employed in such frameworks; and
- the validation of such frameworks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article reports on the findings of senior leadership interviews in a nationally funded project on distributed leadership in the quality management of online learning environments (OLEs) in higher education. Questions were framed around the development of an OLE quality management framework and the situation of the characteristics of distributed leadership at the core of the framework. The project’s premise is that distributed leadership is a descriptive reality of managing OLEs given the various leadership parties involved and the complexities of the contemporary technological landscape. Leaders’ understandings of distributed leadership were examined—its nature, value and potential for advancing the quality management of OLEs. There was confirmatory evidence of its reality, but its meaning and value were not uncritically accepted. It can be concluded that building distributed leadership must start through deliberative formal leadership commitment and action starting at the highest levels of the institution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a proposal for a Quality Management System for a generic GNSS Surveying Company as an alternative for management and service quality improvements. As a result of the increased demand for GNSS measurements, a large number of new or restructured companies were established to operate in that market. Considering that GNSS surveying is a new process, some changes must be performed in order to accommodate the old surveying techniques and the old fashioned management to the new reality. This requires a new management model that must be based on a well-described procedure sequence aiming at the Total Management Quality for the company. The proposed Quality Management System was based on the requirements of the Quality System ISO 9000:2000, applied to the whole company, focusing on the productive process of GNSS surveying work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliography

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliography

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aims to test a new conceptual model based on the relationship between quality management (QM), environmental management maturity (EMM), adoption of external practices of green supply chain management (GSCM) (green purchasing and collaboration with customers) and green performance (GP) with data from 95 Brazilian firms with ISO 14001. To our knowledge, such links and relationships are not simultaneously identified and tested in the literature. The results indicate the validation of all of the research hypotheses. This paper highlights that an improvement in green performance will require attention to quality management, environmental management maturity, and green supply chain. (C) 2014 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aims to test a new conceptual model based on the relationship between quality management (QM), environmental management maturity (EMM), adoption of external practices of green supply chain management (GSCM) (green purchasing and collaboration with customers) and green performance (GP) with data from 95 Brazilian firms with ISO 14001. To our knowledge, such links and relationships are not simultaneously identified and tested in the literature. The results indicate the validation of all of the research hypotheses. This paper highlights that an improvement in green performance will require attention to quality management, environmental management maturity, and green supply chain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Il cambiamento organizzativo costituisce oggi un elemento fondamentale per la sopravvivenza dell'impresa. Un approccio al cambiamento è costituito dal Total Quality Management (o Qualità Totale). La Qualità Totale pone il cliente e la sua soddisfazione al centro delle decisioni aziendali. Ciò presuppone un coinvolgimento di tutto il personale dell'impresa nell'attività di miglioramento continuo. Un sistema di gestione della Qualità Totale è rappresentato dalla Lean Manufacturing. Infatti, i punti essenziali della Lean Manufacturing sono il focus sul cliente, l'eliminazione degli sprechi ed il miglioramento continuo. L'obiettivo è la creazione di valore per il cliente e, quindi, l'eliminazione di ogni forma di spreco. E' necessario adottare un'organizzazione a flusso e controllare continuamente il valore del flusso nell'ottica del miglioramento continuo. Il Lead Time costituisce l'indicatore principale della Lean Manufacturing.I risultati principali della Lean Manufacturing sono: aumento della produttività, miglioramento della qualità del prodotto, riduzione dei lead time e minimizzazione delle scorte ed aumento della rotazione. Tutto ciò è applicato ad un caso aziendale reale. Il caso si compone di un'analisi dei processi di supporto, dell'analisi del capitale circolante (analisi dello stock e del flusso attuale e futuro) e dell'analisi del sistema di trasporto, con l'obiettivo di ridurre il più possibile il lead time totale del sistema.