906 resultados para Project Management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Learning Management Systems (LMS) are used all over Higher Education Institutions (HEI) and the need to know and understand its adoption and usage arises. However, there is a lack of information about how LMSs are being used, which are the most adopted, whether there is a country adoption standard and which countries use more LMSs. A research team is developing a project that tries to fill this lack of information and provide the needed answers. With this purpose, on a first phase, it a survey was taken place. The results of this survey are presented in this paper. Another purpose of this paper is to disseminate the ongoing project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para a obtenção do Grau de Mestre em Contabilidade e Finanças Orientador: Mestre Adalmiro Álvaro Malheiro de Castro Andrade Pereira

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Temporal isolation is an increasingly relevant con- cern in particular for ARINC-351 and virtualisation- based systems. Traditional approaches like the rate- based scheduling framework RBED do not take into account the impact of preemptions in terms of loss of working set in the acceleration hardware (e.g. caches). While some improvements have been suggested in the literature, they are overly heavy in the presence of small high-priority tasks such as interrupt service routines. Within this paper we propose an approach enabling adaptive assessment of this preemption delay in a tem- poral isolation framework with special consideration of capabilities and limitations of the approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evolution of new technology and its increasing use, have for some years been making the existence of informal learning more and more transparent, especially among young and older adults in both Higher Education and workplace contexts. However, the nature of formal and non-formal, course-based, approaches to learning has made it hard to accommodate these informal processes satisfactorily, and although technology bring us near to the solution, it has not yet achieved. TRAILER project aims to address this problem by developing a tool for the management of competences and skills acquired through informal learning experiences, both from the perspective of the user and the institution or company. This paper describes the research and development main lines of this project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thesis submitted to the Faculty of Sciences and Technology, New University of Lisbon, for the degree of Doctor of Philosophy in Environmental Sciences

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Everyday accounting and management teachers face the challenge of creating learning environments that motivate students. This chapter describes the Business Simulation (BS) experience that has taken place at the Polytechnic Institute of Porto, Institute of Accounting and Administration (IPP/ISCAP). The chapter presents students’ perceptions about the course and the teaching/learning approach. The results show that pedagogical methods used (competency-oriented), generic competencies (cooperation and group work), and interpersonal skills (organisational and communication skills) are relevant for future accounting professionals. In addition, positive remarks and possible constraints based on observation, staff meetings, and past research are reported. The chapter concludes with some recommendations from the project implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

International Workshop on solutions that Enhance Informal LEarning Recognition – WEILER 2013

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Comunicação apresentada no 8º Congresso Nacional de Administração Pública - Desafios e Soluções, em Carcavelos de 21 a 22 de Novembro de 2011.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lean Thinking is an important pillar in the success of any program of continuous improvement process. Its tools are useful means in the analysis, control and organization of important data for correct decision making in organizations. This project had as main objective the design of a program of quality improvement in Eurico Ferreira, S.A., based on the evaluation of customer satisfaction and the implementation of 5S. Subsequently, we have selected which business area of the company to address. After the selection, there was an initial diagnostic procedure, identifying the various points of improvement to which some tools of Lean Thinking have been applied, in particular Value Stream Mapping and 5S methodology. With the first, we were able to map the current state of the process in which all stakeholders were represented as well as the flow of materials and information throughout the process. The 5S methodology allowed to act on the wastage, identifying and implementing various process improvements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an ongoing project that implements a platform for creating personal learning environments controlled by students, integrating Web 2.0 applications and content management systems, enabling the safe use of content created in Web 2.0 applications, allowing its publication in the infrastructure controlled by the HEI. Using this platform, students can develop their personal learning environment (PLE) integrated with the Learning Management System (LMS) of the HEI, enabling the management of their learning and, simultaneously, creating their e-portfolio with digital content developed for Course Units (CU). All this can be maintained after the student completes his academic studies, since the platform will remain accessible to students even after they leave the HEI and lose access to its infrastructure. The platform will enable the safe use of content created in Web 2.0 applications, allowing its protected publication in the infrastructure controlled by HEI, thus contributing to the adaptation of the L&T paradigm to the Bologna process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O presente trabalho de dissertação teve como objetivo a implementação de metodologias de Lean Management e avaliação do seu impacto no processo de Desenvolvimento de Produto. A abordagem utilizada consistiu em efetuar uma revisão da literatura e levantamento do Estado da Arte para obter a fundamentação teórica necessária à implementação de metodologias Lean. Prosseguiu com o levantamento da situação inicial da organização em estudo ao nível das atividades de desenvolvimento de produto, práticas de gestão documental e operacional e ainda de atividades de suporte através da realização de inquéritos e medições experimentais. Este conhecimento permitiu criar um modelo de referência para a implementação de Lean Management nesta área específica do desenvolvimento de produto. Após implementado, este modelo foi validado pela sua experimentação prática e recolha de indicadores. A implementação deste modelo de referência permitiu introduzir na Unidade de Desenvolvimento de Produto e Sistemas (DPS) da organização INEGI, as bases do pensamento Lean, contribuindo para a criação de um ambiente de Respeito pela Humanidade e de Melhoria Contínua. Neste ambiente foi possível obter ganhos qualitativos e quantitativos nas várias áreas em estudo, contribuindo de forma global para um aumento da eficiência e eficácia da DPS. Prevê-se que este aumento de eficiência represente um aumento da capacidade instalada na Organização, pela redução anual de 2290 horas de desperdício (6.5% da capacidade total da unidade) e pela redução significativa em custos operacionais. Algumas das implementações de melhoria propostas no decorrer deste trabalho, após verificado o seu sucesso, extravasaram a unidade em estudo e foram aplicadas transversalmente à da organização. Foram também obtidos ganhos qualitativos, tais como a normalização de práticas de gestão documental e a centralização e agilização de fluxos de informação. Isso permitiu um aumento de qualidade dos serviços prestados pela redução de correções e retrabalho. Adicionalmente, com o desenvolvimento de uma nova ferramenta que permite a monitorização do estado atual dos projetos a nível da sua percentagem de execução (cumprimento de objetivos), prazos e custos, bem como a estimação das datas de conclusão dos projetos possibilitando o replaneamento do projeto bem como a detecção atempada de desvios. A ferramenta permite também a criação de um histórico que identifica o esforço horário associado à realização das atividades/tarefas das várias áreas de Desenvolvimento de Produto e desta forma pode ser usada como suporte à orçamentação futura de atividades similares. No decorrer do projeto, foram também criados os mecanismos que permitem o cálculo de indicadores das competências técnicas e motivações intrínsecas individuais da equipa DPS. Estes indicadores podem ser usados na definição por parte dos gestores dos projetos da composição das equipas de trabalho, dos executantes de tarefas individuais do projeto e dos destinatários de ações de formação. Com esta informação é expectável que se consiga um maior aproveitamento do potencial humano e como consequência um aumento do desempenho e da satisfação pessoal dos recursos humanos da organização. Este caso de estudo veio demonstrar que o potencial de melhoria dos processos associados ao desenvolvimento de produto através de metodologias de Lean Management é muito significativo, e que estes resultam em ganhos visíveis para a organização bem como para os seus elementos individualmente.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the introduction of the electrics cars into the market new technologies regarding the battery are being developed and new problems to be solved, one of them the battery management system because each type of cell requires a specific way of handling. This research is done using the active research method to find out the actual problem on this subject and features a BMS should have, understand how they work and how to develop them applied to the purpose on this work. Once the features the BMS should have are clarified, it’s possible to develop a BMS for an electric racing car. The decisions are made taking into consideration the nature of the vehicle being developed. After the project done it’s clear to see that what was developed was not only the BMS itself but all the other factors around it, such as CAN communication, safety control, diagnostics and so on.