904 resultados para load compensation
Resumo:
Thesis (M. S.)--University of Illinois at Urbana-Champaign.
Resumo:
Thesis (M. S.)--University of Illinois at Urbana-Champaign.
Resumo:
"The original design and preliminary coding of the PLONE compiler was done in a seminar course on compilers led by Professor Robert S. Northcote at the University of Illinois during the fall semester of 1969"--P. iii.
Resumo:
"Work supported in part by the National Science Foundation under Grant no. GJ-40221."
Resumo:
"September 1979."
Resumo:
Mode of access: Internet.
Resumo:
Prototype scale tests of the mooring load and wave transmission characteristics of a floating tire breakwater were conducted in the large wave tank at the Coastal Engineering Research Center. Standard Goodyear Tire and Rubber Co. 18-tire modules connected to form breakwaters, 4 and 6 modules (8.5 and 12.8 meters, 28 and 42 feet) wide in the direction of wave advance, were tested in water depths of 2 and 4 meters (6.56 and 13.12 feet). Monochromatic waves with a 2.64- to 8.25-second period range and heights up to 1.4 meters (4.6 feet) were used in the tests. Test results indicate that wave transmission is mainly a function of the breakwater width to incident wavelength ratio with a slight dependence on the incident wave height. However, the mooring forces are mainly a function of the incident wave height with only a slight dependence on the incident wavelength and breakwater width. Recommended design curves for the wave transmission coefficient versus breakwater width to wavelength ratio and mooring load as a function of incident wave height are presented. (Author).
Resumo:
"Digest of decisions by Workmen's Compensation Board in selected cases, full text of court and board decisions under the Disability benefits law and Volunteer firemen's law, referee bulletins, interpretive bulletins and new rules and regulations."
Resumo:
Title Varies: 1916/18, 1924- , Decisions of the Courts of Pennsylvania (Supreme, Superior and Common Pleas) In Workmen's Compensation Cases; 1919-1920, the Workmen's Compensation Act of 1915 as Amended, the Rules of Procedure of M O R E
Resumo:
"Department of Army Project no. 5B99-01-004, Ordnance R and D Project no. TB2-0001, Office of Ordnance Research Project no. 1348, Contract no. DA-19-020-ORD-3250."
Resumo:
"Research was supported by the United States Air Force through the Air Force Office of Scientific Research, Air Research and Development Command."
Resumo:
On cover: Annotations, Corpus juris-Cyc service. Permanent volume. 1921. C.J., A-Ev ; Cyc, Ex-Z.
Resumo:
PB90-215120
Resumo:
"July 1, 1975."
Resumo:
Mode of access: Internet.