937 resultados para Water Quality Management
Resumo:
On cover: Water quality management.
Resumo:
"May 2003."
Resumo:
Includes a summary of the forum discussions.
Resumo:
"IEPA/BOW/03-008"--Cover.
Resumo:
"December, 1980."
Resumo:
This project is for the ecological rehabilitation of lagoons and natural communities at 24 parks within the Chicago Park District. The development of Chicago's lagoon system began shortly after the State of Illinois created the Chicago Park District in 1869. The lagoons were expanded over the next 50 years into 14 parks and they have become extremely important ecologic, recreation, and historic resources. A variety of factors over the last 140 years have contributed to the current deteriorated condition of the lagoons which require the expenditure of funds for major rehabilitation activities. Age of infrastructure, erosion, and sedimentation were the natural forces at work; however, the lagoons' popularity and lack of comprehensive management plan also contributed. All of the lagoons are eligible to be listed on the National Register of Historic places as major contributing features. Additionally, the lagoons in Columbus, Garfield, Humboldt, Jackson, Lincoln, Sherman and Washington Parks are historic landmarks. The Park District has already invested over $5 million for partial lagoon restoration at Humboldt, Douglas, Sherman, McKinley, Riis and Garfield Parks, and additional work is required.
Resumo:
"Prepared for the Metropolitan Water Reclamation District of Greater Chicago."--Cover.
Resumo:
Cover title.
Resumo:
Description based on: 1981; title from cover.
Resumo:
Published in 7 v., v. 1 being a statewide summary report and other 6 v. being the regional reports.
Resumo:
This fact sheet is an outreach tool, designed to assist producers as they attempt to determine whether their operations require coverage under a CAFO National Pollutant Discharge Elimination System (NPEDS) permit. The following common livestock production scenarios and the correlating permitting status for each are designed to assist livestock producers in determining whether an operation requires a permit. A site evaluation by Agency staff may also provide design and operating criteria by which permit problems can be successfully reduced or avoided.
Resumo:
"January, 1964."
Resumo:
"Serial no. 97-H17."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.