1000 resultados para Project Gnome.


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

CSR, a new accelerator project under the construction. to upgrade the existing heavy ion cyclotron system in Lanzhou, is a double cooling-storage-ring system. It consists of a main ring and an experimental ring. The heavy ion beams from the cyclotron system will be accumulated and accelerated first in the main ring, then extracted to produce radioactive ion beams or high-Z beams, and finally to be send to the second ring for internal-target experiments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The FAIR China Group (FCG), consisting of the Institute of Modern Physics (IMP Lanzhou), the Institute of Plasma Physics (ASIPP, Hefei) and the Institute of Electric Engineering (IEE, Beijing) developed and manufactured in cooperation with GSI, Germany a prototype of a superferric dipole for the Super-Fragment-Separator of the FAIR-project [1]. The dipole magnets of the separator will have a deflection radius of 12.5 m, a field up to 1.6 T, a gap of at least 170 mm and an effective length of more than 2 meters to bend ion beams with a rigidity from 2 T . m up to 20 T . m. The magnets operate at DC mode. These requirements led to a superferric design with a yoke weight of more than 50 tons and a maximum stored energy of more than 400 kJ. The principles of yoke, coil and cryostat construction will be presented. We will also show first results of tests and measurements realized at ASIPP and at IMP.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Univ SE Calif, Ctr Syst & Software Engn, ABB, Microsoft Res, IEEE, ACMSIGSOFT, N Carolina State Univ Comp Sci

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chinese Acad Sci, ISCAS Lab Internet Software Technologies

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In order to examine the effectiveness of engineering protection against localized scour in front of the south groin-group of the Yangtze Estuary Waterway Improvement Project, Phase I, an undistorted physical model on a geometric scale of 1:250 is built in this study, covering two groins and their adacent estuarine areas. By use of rinsing fix-bed model as well as localized mobile-bed model the experiment is undertaken under bi-directional steady flow. According to the experimental results, waterway dredging leads to the increase in steram velocity, the increase being larger during the ebb than during the flood. Construction of the upstream groin has some influence on the flow patterns near the downstream groin. Localized scour in front of the groin-heads is controlled mainly by ebb flow. In the case of a riverbed composed entirely of silt, the depths of localized scour in front of the two groin-heads are 27 m and 29 m, respectively. In reality, the underneath sediment of the prototype riverbed is clay whose threshold velocity is much higher than the stream velocity in the Yangtze Estuary; therefore, the depths of localized scour will not be much larger than the thickness of the silt layer, i. e. 7.4 m and 4.7 m, respectively. The designed aprons covering the riverbed in fron of the groin-heads are very effective in scour control. Aprons of slightly smaller size can also fulfill the task of protection, but the area of localized scour increases significantly.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

2004

Relevância:

20.00% 20.00%

Publicador:

Resumo:

SFC FOLLOW-ON VOUCHER The project was undertaken as a SFC Follow-on Voucher (£40K) alongside a student project with BDes (Hons) Design & Digital Arts (D&DA).James Blake (Centre for Media & Culture) brought together students and staff to develop digital content, including films, for a transmedia project and the induction video on the coaches to Ratho. Malcolm Innes, Ian Lambert, Andrew O’Dowd, and Euan Winton (Centre for Design Practice & Research) developed the Old Earth Museum (both physical and virtual), and transmedia designer and research student Beata Zemanek oversaw the transmedia strategy and making of the Gatekeeper film, supported by D&DA students and graduates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes two sets of Benchmark Problem Instances for the One Dimensional Bin Packing Problem. The problem instances are supplied as compressed (zipped) SQLITE database files.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes two sets of benchmark problem instances for the job shop scheduling problem. Each set of instances is supplied as a compressed (zipped) archive containing a single CSV file for each problem instance using the format described in http://rollproject.org/jssp/jsspGen.pdf