General design of the CSR project in IMP
Data(s) |
3880
|
---|---|
Resumo |
CSR, a new accelerator project under the construction. to upgrade the existing heavy ion cyclotron system in Lanzhou, is a double cooling-storage-ring system. It consists of a main ring and an experimental ring. The heavy ion beams from the cyclotron system will be accumulated and accelerated first in the main ring, then extracted to produce radioactive ion beams or high-Z beams, and finally to be send to the second ring for internal-target experiments. |
Identificador | |
Idioma(s) |
英语 |
Fonte |
Xia, JW; Zhan, WL; Wei, BW; Yuan, YJ; Song, MT.General design of the CSR project in IMP,HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION ,38808,30(4):335-343 |
Palavras-Chave | #heavy ion #beam accumulation #electron cooling #storage ring #lattice |
Tipo |
期刊论文 |