958 resultados para Management|Environmental management|Civil engineering


Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction professional service (CPS) in the international arena has been very competitive despite that the industry is proliferating at a high rate. To excel in international business, CPS firms have the importance of building overseas competition strategies on a proper understanding of the international CPS (I-CPS) market. However, subject to borderless trade, information technology–based networking, global outsourcing, and changing forms of procurement, the I-CPS market structure has become more covert, intricate, and unstraightforward than before. Through examining business competition among top international design firms, this study aims to identify the attributes of the I-CPS market structure from two perspectives—concentration and turnover. Data from Engineering News-Record over the period 2001–2011 were collected to calculate market concentration ratios and turnover indices. The results show that I-CPS competition is characterized by atomism, much turbulence with a steady increase in competition intensity, and the predominant role of new entrants and exiting firms in market turnovers. The combination of concentration and turnover is found useful to address the attributes of the I-CPS market structure, which favors I-CPS firms to formulate international competition strategies in due ways.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the global construction context, the Best Value or Most Economically Advantageous Tender is becoming a widespread approach for contractor selection, as an alternative to other traditional awarding criteria such as the Lowest Price. In these multi-attribute tenders, the owner or auctioneer solicits proposals containing both a price bid and additional technical features. Once the proposals are received, each bidder's price bid is given an economic score according to a scoring rule, generally called an Economic Scoring Formula (ESF) and a technical score according to pre-specified criteria. Eventually, the contract is awarded to the bidder with the highest weighted overall score (economic + technical). However, Economic Scoring Formula selection by auctioneers is invariably and paradoxically a highly intuitive process in practice, involving few theoretical or empirical considerations, despite having being considered traditionally and mistakenly as objective, due to its mathematical nature. This paper provides a taxonomic classification of a wide variety of ESF and Abnormally Low Bid Criteria (ALBC) gathered in several countries with different tendering approaches. Practical implications concern the optimal design of price scoring rules in construction contract tenders, as well as future analyses of the effects of ESF and ALBC on competitive bidding behaviour.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the results of a research project aimed at examining the capabilities and challenges of two distinct but not mutually exclusive approaches to in-service bridge assessment: visual inspection and installed monitoring systems. In this study, the intended functionality of both approaches was evaluated on its ability to identify potential structural damage and to provide decision-making support. Inspection and monitoring are compared in terms of their functional performance, cost, and barriers (real and perceived) to implementation. Both methods have strengths and weaknesses across the metrics analyzed, and it is likely that a hybrid evaluation technique that adopts both approaches will optimize efficiency of condition assessment and ultimately lead to better decision making.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sustainable land use policies are concerned with the kind of world we want to live in now, and in future, and therefore inevitably involve some form of community involvement or consultation process. Hong Kong's sustainable land use planning system is well developed, involving considerable community participation and therefore serves as a good model for similarly situated cities. However, although there are several recent studies involving aspects of its land use planning system, none has yet examined the system as a whole from the perspective of sustainability. To correct this, this paper describes the land use conditions of Hong Kong from both demand and supply perspectives, reviewing its statutory and administrative procedures of land development and allocation together with the sustainable urban renewal practices involved. Problems in current sustainable land use planning and management, such as difficulties in urban renewal, the inherent shortage of land and the lengthy time involved due to need for coordination and responsiveness to multiple stakeholders, and outdated and overcomplicated administrative processes were also analyzed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has long been considered to have unacceptably high injury and fatality rates. Previous research has shown that small construction companies sustain higher injury rates than large companies. However, despite the industry being dominated by a very large number of such small companies, little is known of their occupational health and safety (OHS) needs, practices and constraints. This paper takes a first step in aiming to identify the principal barriers that affect good OHS performance of small construction companies so that effective OHS practices can be developed to improve this in future. The contents of the literature are first summarised, in which three critical barriers to good OHS practice in small construction firms are proposed. They are : cost, time, lack of safety awareness and concern. The results of a questionnaire survey carried out with South East Queensland construction personnel are presented, which largely confirm what is suggested by the literature research and also succeed in providing an indication of their ranking in terms of importance and suggestions for overcoming these barriers. The research results provide a better understanding of the issues that restrict good OHS practice in small construction companies and potential measures for improvement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Alternative dispute resolution (ADR) methods, such as arbitration, are often used instead of litigation to resolve construction disputes, as industry folklore considers litigation overly expensive and time-consuming. But is this actually the case? Do the people most involved in construction dispute resolution agree? What are the real advantages and disadvantages of using litigation or ADR? When, if ever, is litigation the most appropriate way of resolving construction disputes? To answer these questions, this paper first provides a review of the literature on the use of litigation and ADR for construction dispute resolution. This is followed by the results of a survey of construction and legal personnel with moderate to extensive experience of dispute resolution in the Australian South-East Queensland construction industry. The main results of this are that, in addition to litigation being more expensive in money and time than ADR methods, the nature of the existing relationship between the parties has an important effect on the resolution process, what happens after an unsuccessful ADR and, if adversarial, is more likely to lead to litigation. The results are then validated and verified by one of the most experienced practitioners in claims and disputes in the whole of Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The policy environment for regional natural resource management (NRM) has shifted considerably since it was first introduced in the early 2000s. This workshop will explore the impact of current policy on NRM planning and action through presentations and workshop discussion. To set the scene for the workshop discussion presentations will consider: 1) the impact of evolving national and state NRM policy in Australia; 2) how Australian NRM compares to other countries; 3) governance risks to NRM delivery; and 4) regional responses to NRM delivery. During the workshop element, participants from across regions will share their experiences and explore implications of current policy on the business of regional NRM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the current emerging development pattern in Malaysia, Malaysian government has enthusiastically promoted green procurement approach that will help the construction project being green. Previous studies highlighted that the concept of green procurement is still very new to the Malaysian construction industry, and this increases the needs for further research in this area. This paper addresses the needs of guidelines for stakeholders to procure environmentally-friendly construction. Currently, there is a limited practical guideline for stakeholders to procure green projects. This paper discusses the progress to date of a research project aimed at developing a green procurement framework for construction projects in the Malaysian construction industry. This framework will guide the stakeholders to plan the green procurement implementation to procure a construction projects. Through literature and expert opinion, this paper explores the list of green practices within procurement practices which becomes the basis to develop a survey instrument that will be used in the later part of this study. The paper will shed useful information for construction researchers and practitioners in exploring the green procurement concept for construction industry in Malaysia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: This chapter discusses the opportunity of Islamic project financing implementation for public infrastructure development in Indonesia. Design/Methodology/Approach: This chapter, firstly, reviewed existing literature on Islamic finance to explore the applicability of Islamic financing in infrastructure development. Interviews were conducted as the first stage of Delphi method approach. This was then followed by reviewing Indonesia’s government policies and regulations in infrastructure industry and Islamic financing. Findings: This chapter enlightens the implementation of Islamic financing on infrastructure project financing in Indonesia. The findings indicate that the government policies and regulations on both infrastructure investment and Islamic financing support the implementation of Islamic project financing, whereas, an improvement is still needed in order to overarch infrastructure business and Islamic financing investment. Research: Financing framework development for Indonesia infrastructure projects. Limitations/Implications: The result reported comprises the preliminary study of Islamic project paper written based on published research papers and interviews. Furthermore, the data collected for the study are limited to the case of Indonesian infrastructure projects. Practical Implication: Islamic financing in Indonesia infrastructure projects development has not been optimally implemented. Therefore, this chapter serves as a catalyst to explore alternative financial scheme such as Islamic financing for infrastructure development. Originality/Value: This chapter highlights possibilities and obstacles in applying Islamic scheme to infrastructure project financing. This provides a framework to analyse the steps to implement Islamic financing successfully in infrastructure development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Employees’ safety climate perceptions dictate their safety behavior because individuals act based on their perceptions of reality. Extensive empirical research in applied psychology has confirmed this relationship. However, rare efforts have been made to investigate the factors contributing to a favorable safety climate in construction research. As an initial effort to address the knowledge gap, this paper examines factors contributing to a psychological safety climate, an operationalization of a safety climate at the individual level, and, hence, the basic element of a safety climate at higher levels. A multiperspective framework of contributors to a psychological safety climate is estimated by a structural equation modeling technique using individual questionnaire responses from a random sample of construction project personnel. The results inform management of three routes to psychological safety climate: a client’s proactive involvement in safety management, a workforce-friendly workplace created by the project team, and transformational supervisors’ communication about safety matters with the workforce. This paper contributes to the field of construction engineering and management by highlighting a broader contextual influence in a systematic formation of psychological safety climate perceptions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.