923 resultados para Construction Project Delivery
Resumo:
Ecological responses to dam construction are poorly understood, especially for downstream benthic algal communities. We examined the responses of benthic algal communities in downstream reaches of a tributary of the Xiangxi River, China, to the construction of a small run-of-river dam. From February 2003 to August 2006, benthic algae, chemical factors, and habitat characteristics were monitored upstream and downstream of the dam site. This period spanned 6 mo before dam construction and 37 mo after dam construction. Benthic algal sampling yielded 199 taxa in 59 genera that belonged to Bacillariophyta, Chlorophyta, and Cyanophyta. Some physical factors (flow velocity, water depth, and channel width) and 3 algal metrics (diatom species richness, Margalef diversity, and % erect individuals) were significantly affected by the dam construction, whereas chemical factors (e.g., NH4-N, total N, SiO2) were not. Nonmetric multidimensional scaling (NMS) ordinations showed that overall algal assemblage structure downstream of the dam sites was similar to that of upstream control sites before dam construction and for 1 year after dam construction (p > 0.05). However, sites belonging to upstream and downstream reaches were well separated on NMS axis 1 during the 2(nd) and 3(rd) years after dam construction. Our results suggest that impacts of dam construction on benthic algal communities took 2 to 3 y to emerge. Further development of a complete set of indicators is needed to address the impact of small-dam construction. Our observations underscore the need for additional studies that quantify ecological responses to dam construction over longer time spans.
Resumo:
CSR, a new accelerator project under the construction. to upgrade the existing heavy ion cyclotron system in Lanzhou, is a double cooling-storage-ring system. It consists of a main ring and an experimental ring. The heavy ion beams from the cyclotron system will be accumulated and accelerated first in the main ring, then extracted to produce radioactive ion beams or high-Z beams, and finally to be send to the second ring for internal-target experiments.
Resumo:
The FAIR China Group (FCG), consisting of the Institute of Modern Physics (IMP Lanzhou), the Institute of Plasma Physics (ASIPP, Hefei) and the Institute of Electric Engineering (IEE, Beijing) developed and manufactured in cooperation with GSI, Germany a prototype of a superferric dipole for the Super-Fragment-Separator of the FAIR-project [1]. The dipole magnets of the separator will have a deflection radius of 12.5 m, a field up to 1.6 T, a gap of at least 170 mm and an effective length of more than 2 meters to bend ion beams with a rigidity from 2 T . m up to 20 T . m. The magnets operate at DC mode. These requirements led to a superferric design with a yoke weight of more than 50 tons and a maximum stored energy of more than 400 kJ. The principles of yoke, coil and cryostat construction will be presented. We will also show first results of tests and measurements realized at ASIPP and at IMP.
Resumo:
Hollow deoxyribonucleic acid (DNA)/poly-L-lysine (PLL) capsules were successfully fabricated through a layer-by-layer (LbL) self-assembly of DNA and PLL on porous CaCO3 microparticles, followed by removal of templates with ethylenediamine tetraacetic acid disodium salt (EDTA). The enzymatic degradation of the capsules in the presence of alpha-chymotrypsin was explored. The higher the enzyme concentration, the higher is the degradation rate of hollow capsules. in addition, glutaric dialdehyde (GA) cross-linking was found to be another way to manipulate degradation rate of hollow capsules.
Resumo:
In order to examine the effectiveness of engineering protection against localized scour in front of the south groin-group of the Yangtze Estuary Waterway Improvement Project, Phase I, an undistorted physical model on a geometric scale of 1:250 is built in this study, covering two groins and their adacent estuarine areas. By use of rinsing fix-bed model as well as localized mobile-bed model the experiment is undertaken under bi-directional steady flow. According to the experimental results, waterway dredging leads to the increase in steram velocity, the increase being larger during the ebb than during the flood. Construction of the upstream groin has some influence on the flow patterns near the downstream groin. Localized scour in front of the groin-heads is controlled mainly by ebb flow. In the case of a riverbed composed entirely of silt, the depths of localized scour in front of the two groin-heads are 27 m and 29 m, respectively. In reality, the underneath sediment of the prototype riverbed is clay whose threshold velocity is much higher than the stream velocity in the Yangtze Estuary; therefore, the depths of localized scour will not be much larger than the thickness of the silt layer, i. e. 7.4 m and 4.7 m, respectively. The designed aprons covering the riverbed in fron of the groin-heads are very effective in scour control. Aprons of slightly smaller size can also fulfill the task of protection, but the area of localized scour increases significantly.
Resumo:
The blood brain barrier (BBB) is a semi-permeable membrane separating the brain from the bloodstream, preventing many drugs that treat neurological diseases, such as Alzheimer’s and Parkinson’s, from reaching the brain. Our project aimed to create a novel drug delivery system targeting the brain during neural inflammation. We developed a cationic solid lipid nanoparticle (CSLN) complex composed of cationic nanoparticles, biotin, streptavidin, and anti-vascular cell adhesion molecule-1 (anti- VCAM-1) antibodies. The anti-VCAM-1 antibody is used to target VCAM-1, a cell adhesion protein found on the BBB endothelium. VCAM-1 expression is elevated in the presence of inflammatory molecules, such as tumor necrosis factor-alpha (TNF- α). Through the use of a simple BBB model, results showed that our novel drug delivery system experienced some level of success in targeting the brain inflammation due to increasing TNF-α concentrations. This is promising for drug delivery research and provides support for VCAM-1 targeting using more robust and complex BBB models.
Resumo:
Le projet de construction au XXIe siècle :nouveaux acteurs, nouvelles responsabilités. L’apparition de nouveaux intervenants dans les projets de contruction bouleverse le schéma classique Maître d’ouvrage – Architecte – Entrepreneur. Parmi ceux-ci, le Project Manager occupe une place de premier rang, dès lors qu’il interviendra bien souvent dès l’entame du projet et jusqu’à complétion de celui-ci. L’ouvrage offre une première analyse complète de sa situation juridique, en mêlant littérature juridique (belge, française et américaine) et pratique de terrain. Envisagé ici à travers le prisme de sa relation contractuelle avec le Maître d’ouvrage, le Project manager reçoit une définition légale d’où sont déduits les éléments essentiels de se son contrat. Son statut, ses missions ainsi que ses responsabilités sont identiés précisément et articulés harmonieusement avec ceux d’autre professionnels (arhitectes et entrepreneurs). Spécialement sur la question des reponsabilités, l’ouvrage démontre que certains cas de responsabilité traditionnellement imputés à l’un de ces autres acteurs pourront être imputés au Project Manager, allant dans le sens d’un régime unifié de responsabilité pour l’ensemble de ces acteurs. L’ouvrage s’enrichit encore d’un modèle contractuel de base et d’une bibliographie.Incontestablement, l’ouvrage vient combler un vide doctrinal et constituera un guide essentiel, tant pour les Maîtres d’ouvrage que pour les Project Manager.
Resumo:
The design, construction and subsequent operation of the 75 kW oscillating water column wave power plant on the Isle of Islay has provided a significant insight into the practicality of wave power conversion. The development of wave power plant poses a significant design and construction challenge for not only civil but also mechanical and electrical engineers. The plant must withstand the immense forces imposed during storms, yet efficiently convert the slow cyclic motion of waves into a useful energy source such as electricity and do so at a price competitive with other forms of generation. In addition, the hostile marine environment hampers the construction process and the variability of the wave resource poses problems for electrical control and grid integration. Many sceptics consider wave power conversion to be too difficult, too expensive and too variable to justify the effort and expense necessary to develop this technology. However, the authors contend that with modular wave power systems developed from the practical experience gained with the Islay plant, wave power is a viable technology with a considerable world market potential. However, this technology is still at the early stages of development and will require the construction of a number of different prototypes before there is extensive commercial exploitation.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.
Resumo:
A full-scale, seven-story, reinforced concrete building frame was constructed in-place at the Building Research Establishment's Cardington Laboratory, which encompassed a range of different concrete mixtures and advanced construction techniques. This provided an opportunity to assess in-place nondestructive test methods, namely the pullout test, and more specifically the Danish version, which has been known as the Lok test, on a systematic basis during the construction of the building. It was used in conjunction with both standard and temperature-matched cube specimens to assess its practicality and accuracy under site conditions. Strength correlations were determined using linear and power function regression analysis. Strength predictions from these were found to be in very good agreement with the compressive strengths of temperature-matched cube specimens. When a general correlation is used, however, estimates for compressive strength are likely to have 95% confidence limits of around '20% of the mean value of four results.