964 resultados para Maintenance costs
Resumo:
The rate of city growth in China today correlates well with an overall loss of the most fertile agricultural areas of the country. A consequence of this growth includes the rapid reshaping of peri-urban livelihoods in their densely populated fringe. The policy response from central government has focused on containing city growth and pursuing modern rural development. Both policy directions have failed, in part, to acknowledge the intrinsic nature of the urban fringe in China. This paper explores the features of the fringe of Suzhou, a fast growing city in the Yangtze River Delta. The aim is to outline potential social costs of this current policy framework, through analysing the case study of Jinshi Village. The paper advocates a different regionalist approach to policy implementation.
Resumo:
Num mundo em que as redes de telecomunicações estão em constante evolução e crescimento, o consumo energético destas também aumenta. Com a evolução tanto por parte das redes como dos seus equipamentos, o custo de implementação de uma rede tem-se reduzido até ao ponto em que o maior obstáculo para o crescimento das redes é já o seu custo de manutenção e funcionamento. Nas últimas décadas têm sido criados esforços para tornar as redes cada fez mais eficientes ao nível energético, reduzindo-se assim os seus custos operacionais, como também a redução dos problemas relacionados com as fontes de energia que alimentam estas redes. Neste sentido, este trabalho tem como objectivo principal o estudo do consumo energético de redes IP sobre WDM, designadamente o estudo de métodos de encaminhamento que sejam eficientes do ponto de vista energético. Neste trabalho formalizámos um modelo de optimização que foi avaliado usando diferentes topologias de rede. O resultado da análise mostrou que na maioria dos casos é possível obter uma redução do consumo na ordem dos 25%.
Resumo:
Power systems have been through deep changes in recent years, namely with the operation of competitive electricity markets in the scope and the increasingly intensive use of renewable energy sources and distributed generation. This requires new business models able to cope with the new opportunities that have emerged. Virtual Power Players (VPPs) are a new player type which allows aggregating a diversity of players (Distributed Generation (DG), Storage Agents (SA), Electrical Vehicles, (V2G) and consumers), to facilitate their participation in the electricity markets and to provide a set of new services promoting generation and consumption efficiency, while improving players` benefits. A major task of VPPs is the remuneration of generation and services (maintenance, market operation costs and energy reserves), as well as charging energy consumption. This paper proposes a model to implement fair and strategic remuneration and tariff methodologies, able to allow efficient VPP operation and VPP goals accomplishment in the scope of electricity markets.
Resumo:
The current regulatory framework for maintenance outage scheduling in distribution systems needs revision to face the challenges of future smart grids. In the smart grid context, generation units and the system operator perform new roles with different objectives, and an efficient coordination between them becomes necessary. In this paper, the distribution system operator (DSO) of a microgrid receives the proposals for shortterm (ST) planned outages from the generation and transmission side, and has to decide the final outage plans, which is mandatory for the members to follow. The framework is based on a coordination procedure between the DSO and other market players. This paper undertakes the challenge of optimization problem in a smart grid where the operator faces with uncertainty. The results show the effectiveness and applicability of the proposed regulatory framework in the modified IEEE 34- bus test system.
Resumo:
Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.
Resumo:
Congestion management of transmission power systems has achieve high relevance in competitive environments, which require an adequate approach both in technical and economic terms. This paper proposes a new methodology for congestion management and transmission tariff determination in deregulated electricity markets. The congestion management methodology is based on a reformulated optimal power flow, whose main goal is to obtain a feasible solution for the re-dispatch minimizing the changes in the transactions resulting from market operation. The proposed transmission tariffs consider the physical impact caused by each market agents in the transmission network. The final tariff considers existing system costs and also costs due to the initial congestion situation and losses. This paper includes a case study for the 118 bus IEEE test case.
Resumo:
A evolução tecnológica, com particular incidência nas tecnologias de informação, e a necessidade de uma integração cada vez mais profunda do sector da manutenção na gestão estratégica global da empresa, contribuíram para o aparecimento dos sistemas de e-maintenance. Por outro lado, os conceitos associados à manutenção deverão estar cada vez mais associados à manutenção remota. Assim, o desenvolvimento de plataformas de e-maintenance, entendidas como a agregação de software e hardware e outras tecnologias integradas, permitiram implementar serviços, que foram determinantes para a evolução deste conceito. Nesta comunicação apresenta-se uma plataforma de e-maintenance aplicada a um sistema automatizado de pesagem de viaturas na indústria cimenteira. O sistema é baseado na monitorização constante da degradação dos componentes críticos que, através de um sistema de alertas, permite antecipar as falhas notificando, atempadamente, a equipe de operadores específicos. A aplicação foi desenvolvida na Framework SLV Cement da empresa Cachapuz. Possuindo vários módulos de gestão da manutenção esta plataforma permite definir e controlar todo o fluxo de informação.
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica Ramo Manutenção e Produção
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Área de Especialização em Vias de Comunicação e Transportes
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Electrónica e Telecomunicações
Resumo:
In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.