999 resultados para Final do Antigo Regime


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The melanoma-associated protein Melan-A contains the immunodominant CTL epitope Melan-A(26/27-35)/HLA-A*0201 against which a high frequency of T lymphocytes has been detected in many melanoma patients. In this study we show that the in vitro degradation of a polypeptide encompassing Melan-A(26/27-35) by proteasomes produces both the final antigenic peptide and N-terminally extended intermediates. When human melanoma cells expressing the corresponding fragments were exposed to specific CTL, those expressing the minimal antigenic sequence were recognized more efficiently than those expressing the N-terminally extended intermediates. Using a tumor-reactive CTL clone, we confirmed that the recognition of melanoma cells expressing an N-terminally extended intermediate of Melan-A is inefficient. We demonstrated that the inefficient cytosolic trimming of N-terminally extended intermediates could offer a selective advantage for the preferred presentation of Melan-A peptides directly produced by the proteasomes. These results imply that both the proteasomes and postproteasomal peptidases limit the availability of antigenic peptides and that the efficiency of presentation may be affected by conditions that alter the ratio between fully and partially processed proteasomal products.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Postprint (published version)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A desidratação osmótica associada à adição de ácidos fracos representa uma alternativa de processamento brando, resultando em um produto com características sensoriais praticamente inalteradas e apropriado para o consumo imediato. O objetivo deste estudo foi avaliar a influência dos ácidos cítrico e lático na obtenção de melão osmoticamente desidratado e na qualidade final do produto. Pedaços de melão (Cucumis melo inodorus, cultivar: Gold Mine), de 40x30x15 mm, foram imersos em três tipos de soluções (sacarose + ácido cítrico, sacarose + ácido lático e sacarose) com diferentes concentrações de sacarose (50 a 70ºBrix). A desidratação osmótica foi realizada em temperatura controlada (30 a 50ºC) por até três horas. A adição de ácidos não influenciou significativamente na variação da cromaticidade. No entanto, a concentração da solução desidratante e a temperatura tiveram efeitos significativos no aumento da luminosidade do produto. A tensão na ruptura foi menor nas amostras processadas em relação à fruta fresca, porém a deformação na ruptura foi significativamente mais alta nas amostras tratadas com ácido lático a 50ºC, fornecendo produtos mais viscoelásticos, porém mais firmes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The DMACC Lake Watershed Improvement project will focus on water quality and quantity as well as channel and lake restoration. Roadway, parking lot, and roof drainage from the west and northwest portions of the campus add significant amounts of pollutants and silt to the lake. Severe channel erosion exists along the northern creek channel with exposed cut banks ranging from 2-10 feet in height devoid of vegetation. Heavy lake sedimentation and algae blooms are a result of accumulated sediment being conveyed to the lake. Most sections of the north channel have grades of between 0.5% and 1%. This channel receives large scouring flow velocities. There are no natural riffle or pool systems. There are five areas where these riffle and pool systems may need to be created in order to slow overall channel velocities. This will create a series of rock riffles and a still pool that will mimic the conditions that natural channels tend to create, protecting the channel from undercutting. Multiple practices will need to be implemented to address the pollutant, silt, and channel erosion. Improvements will be specifically tailored to address problems observed within the north channel, on-site drainage from the west and northwest, as well as off-site drainage to the north of the campus and east of Ankeny Blvd (Hwy 69). The result will be improved quality and quantity of site drainage and a channel with a more natural appearance and reduced scour velocities. Sections of the north channel will require grading to establish slopes that can support deep rooted vegetation and to improve maintenance access. Areas with eroded banks will require slope pull back and may also require toe armor protection to stabilize. A constructed wetland will collect and treat runoff from the west on site parking lot, before being discharged into the lake. This project will create educational opportunities to both students and the general public as well as interested parties outside of the local area for how an existing system can be retro fitted for improved watershed quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sands Timber Lake is a 60 acre man made impoundment near Blockton, Iowa. The lake is the centerpiece of a 235 acre park, which is owned and managed by the Taylor County Conservation Board. The park is equipped with modern campsites, hiking trails, picnic areas, and a playground. Bordering the western shoreline of the lake is a beautiful hardwood timber which inspired the parks name. Sands Timber Lake has a 4,100 acre drainage area comprised of timber, grassland, and row crop. The lake is fed by four large classic gullies which branch off into many smaller gullies dissecting the drainage area. Since construction in 1993, Sands Timber Lake has been an extremely poor fishery. In 2006 Sands Timber Lake was added to the EPA’s 303d list of impaired water bodies. Turbid water was identified as the primary stressor. In 2007 a bathometric map was made which depicts lake-bottom contours and elevations which, when compared to the original survey of the area, revealed an alarming amount of siltation. What was once a twenty-three foot deep lake in 1994 has now been reduced to a mere fourteen feet. In addition to depth being lost, the lake’s surface has been reduced by nearly ten acres, destroying vital fish habitats. Local interest in preserving and enhancing the lake has led to the completion of a thorough watershed assessment and treatment plan. Included in the plan are several elements, the first being upland treatment. Locals are insistent that if conservation is not implemented in the watershed the lake will continue to degrade and park usage will continue to decline.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2004 Walnut Creek was placed on the 303d list of impaired water bodies for lack of aquatic life with biological causes. Sediment from farmland as well as the stream banks was listed as the most likely stressor. In response to this listing a preliminary watershed assessment was completed by the six counties which have land in the Walnut Creek watershed. Walnut Creek flows through portions of Shelby, Pottawattamie, Montgomery, Mills, Page, and Fremont Counties before reaching its confluence with the West Nishnabotna River. The preliminary study assessed resource concerns and evaluated anticipated landowner participation levels for the six Huc 12 sub-watersheds which divide the Walnut Creek basin. These preliminary assessments revealed a priority sub-watershed which lies between US Hwy 6 and Hwy 34. A development grant was then funded by the Division of Soil Conservation to conduct a detailed assessment of this area. The detailed assessment involved an assessment of the uplands as well as the stream itself. A better understanding of the resource concerns was gained through the assessment, allowing for a comprehensive watershed plan to be developed. A variety of best management practices will be necessary for our project to be a success, many of which will be funded by other sources besides the WIRB. This grant is the first request for funding submitted by the East Pottawattamie and Montgomery SWCDs’. This grant will serve as the first critical step in building what is destined to be a true watershed success story.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Muchakinock Creek Watershed Project began in February of 2005 to treat upland soil erosion in the creek that has lead to a 303(d) impairment. The Mahaska SWCD is currently administering this cost-share program to promote terraces, basins, and grade stabilization structures. The District is seeking funding from WIRB to treat specific abandoned mine lands in the Muchakinock Creek Watershed. These areas contribute sediment to the creek at levels second only to agricultural lands as well as acid mine drainage from open pits mines that have been left to decay across the county. The WIRB funding would be used to compliment Federal Abandoned Mine Land (AML) funding in the reclamation of these areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lake Morris is the larger of two lakes which serve as the municipal water supply for the City of Chariton, Iowa. As a site for fishing and boating, it also serves as a significant recreational resource for area residents. Its ability to sustain these uses has been significantly impaired by long-term and ongoing accumulation of sediment and sediment-borne nutrients from both public and private land within the watershed. This accumulation has resulted in reduced water depth, reduced water-holding capacity, reduced quality of the fishery, increased water turbidity, increased growth of undesirable algae, and increased cost of treating the water for municipal uses. Water quality projects undertaken in the past, notably the Lucas Lakes Project of the 1990s, made important progress in reducing sedimentation from privately-owned land higher in the watershed, but paid little attention to land owned by the City of Chariton immediately surrounding the lakes. A recent reassessment of gully erosion within the watershed shows serious, ongoing erosion on that City-owned land. This project proposes a two-part approach to improving the water quality in Lake Morris. First, we propose that a complement of five SolarBee water circulation devices be installed in Lake Morris to provide near-term and continuing improvements in water quality, by inhibiting cyanobacterial growth and thereby removing the need for treatment of the lakes with copper sulfate. Second, we propose the installation of erosion-control structures on primarily City-owned land surrounding the lake, to provide a major reduction in ongoing sedimentation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Brief Project Summary (no greater than this space allows): This project is located in the Ludlow Creek Watershed, a 9,827 acre sub-watershed of the Yellow River. Ludlow Creek is extremely fragile and unique because it is a karst watershed, containing an estimated 1,188 sinkholes and depressions. Ludlow Creek may arguably contain more sinkholes per acre than any other watershed in Iowa. Water sampling data shows sediment delivery and E.coli as being water quality impairments in Ludlow Creek. The goals of this project are to 1) Reduce sediment delivery by 40%, 2) Reduce animal waste run-off which may include E.coli and nutrients by 40%, and 3) Reduce the water quality impact that sinkholes have on this watershed. The following Best Management Practices (BMPs) will be implemented to target Ludlow Creek's water quality impairments: no-till, terraces, grade stabilization structures, manure systems, strearnbank stabilization, pasture management, and both sinkhole and stream buffers. Our goal is to implement a combination of approximately 62 BMPs in the Ludlow Creek Watershed. These landowners will receive 75% cost-share for each one of these practices. If we receive funding from this grant, we will reach this 75% cost-share allocation by leveraging WHIP or EQIP funds when available, for most of these practices. This application has been reviewed and approved by the Allamakee County Soil and Water Conservation District Commissioners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in one targeted sub-watershed as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on 1,450 acres that will reduce the annual delivery of sediment by 2,160 tons and phosphorus by 8,210 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

East Okoboji Beach was platted on April 20, 1961 and includes over 90.4 acres with 489 lots. The East Okoboji Beach project includes a complete storm water discharge system, which includes low impact development and reconstruction of the roadways in East Okoboji Beach. The East Okoboji Beach Project is an enormous project that is the first Dickinson County project to retrofit LID practices, lake-friendly storm-water drainage systems and roadway reconstruction throughout an existing sub- division. This cooperative project between DNR, Dickinson County, and EOB landowners includes engineering retention ponds, rain gardens, bio-swales and other LID practices to reduce nutrient and sediment pollutants flowing directly into East Okoboji. The nature of the problem stems back to that original plat where small lots were platted and developed without planning for storm water discharge. There was no consideration of the effects of filling in and developing over the many wetland areas existing in EOB. The scope of the problem covers the entire 90.4 acres in East Okoboji Beach, the DNR owned land and the farmed land to the east. The nature of the problem stems from storm water runoff flowing throughout the watershed and into East Okoboji Beach where it flows down self-made paths and then into East Lake Okoboji. That storm water runoff dumps nutrient and sediment pollutions directly into East Lake Okoboji. The expected result of this project is a new roadway and drainage system constructed with engineering that is intended to protect East Lake Okoboji and the land and homes in East Okoboji Beach. The benefit will be the improvement in the waters and the reduction of the siltation in the East Lake Okoboji.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Summit Lake Watershed Improvement Project is a watershed-based sediment control project designed to greatly reduce to nearly eliminate sedimentation of an existing lake that is being renovated for use as a water source in southern Iowa. Summit Lake is owned by the City of Creston and was once a water source lake until around 1984. The watershed improvements will include lakeshore stabilization and erosion control practices as a precursor for related improvements to the lake and overall 4,900-acre watershed. Best practices included in this phase are the implementation of riprap, a rain garden, grade stabilization structures, grassed waterways, terraces, basins, water use and access ordinances, education and outreach, water monitoring, and other stream bank improvements. These improvements, along with leveraged work to be done by strategic partners, will enable the lake to be used for local and regional water supplies by sustaining the lake for many years to come. Without the lake rehabilitation, the lake will likely be filled with sedimentation to the point that it will have no recreational value. Key partners are the City of Creston, IDNR, Southern Iowa Rural Water Association, Union County, the Union County NRCS office, Southwestern Community College, and the Summit Lake Association, which is a non-profit group of landowners working to protect the lake. The project will address WIRB targets: a) streambank stabilization, b) livestock runoff, c) agricultural runoff and drainage, d) stormwater runoff, and e) a section of inadequately sewered community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The North Fork Maquoketa River Headwaters (NFMRH) has been identified as impaired by nutrients, episodic slugs of ammonia and sediment. The NFMRH TMDL plan calls for a "phasing approach" to managing water quality when the origin is non-point source contaminants. This project will address phase 1 using a performance reward program for targeted cooperators to improve environmental index scores using cost-share, EQIP practices and flexible management alternatives. Pre-project assessments suggest that rewards should target refined management of erosion-prone fields and farms with livestock populations, which contribute to the P and N loads responsible for fertilizing filamentous algae blooms that depress dissolved oxygen concentrations in the NFMRH. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers to determine effective alternatives, such as no-till planting, to reduce nutrient and sediment delivery. These evironmental indexes will be especially useful for livestock producers in the livestock dense watershed. This project will extend a NRCS-sponsored Conservation Innovation Grant currently offered to producers in the Coffee Creek sub-watershed to a three-year, watershed-wide effort that will be necessary to make significant improvements in environmental management.