984 resultados para Warm Asphalt Binder,SBS,Dynamic Shear Rheometer,Rotational Viscometer,Equiviscosit


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The formation and structural evolution of the jungrau syncline is described, based on excellent outcrops occurring in the lotschental, in the central alps of switzerland. the quality of the outcrops allows us to demonstrate that the external massifs of the swiss alps have developed due to internal folding. The jungfrau suncline, which separates the autochtonous gastern dome from the aar massif basement gneiss folds, is composed of slivers of basement rocks with their mesozoic sedimentary cover. in the inner faflertal, a side valley of the lotschental, the 200 m thick syncline cp, roses fpir imots, the gastern massif with a reduced mesozoic sedimentary cover in a normal stratigraphic succession, two units of overturned basement rocks with their mesozoic sedimentary cover, and the overturned lower limn of the tschingelhorn gneiss fold of the aar massif with lenses of its sedimentary cover. stratigraphy shows that the lower units, related to the gastern massis, are condensed and that the upper units, deposited farther away from a gastern paleo-high, form a more complete sequence, linked to the doldenhorn meso-cneozoic basin fill. the integration of these local observations with published regional data leads to the following model. on the northern margin of the doldenhorn hbasin, at the northern fringe of the alpine tethuys, the pre-triassic crystalline basement and its mesozoic sedimentary cover were folded by ductile deformation at temperatures above 300 degrees C and in the presence of high fluid pressures, as the helveti c and penninic nappes were overthrusted towards the northwest during the main alpine deformation phase, the visosity contrast between the basement gneisses and the sediments caused the formation of large basement anticlines and tight sedimentary sunclines (mullion-type structures). The edges of basement blocks bounded buy pre-cursor se-dipping normal faults at the northwestern border of the doldenhorn basin were deformed bu simple shear, creating overturned slices of crystalline rocks with their sedimentary cover in what now forms the hungfrau syncline. the localisation of ductile deformation in the vicinity of pre-existing se-dipping faults is thought to have been helped by the circulation of fluids along the faults; these fluids would have been released from the mesozoic sediments by metamorphic dehydration reactions accompanied by creep and dynamic recrystallisation of quartz at temperatures above 300 degrees C. Quantification of the deformation suggests an strain ellipsoid with a ratio (1 + e(1)/+ e(3)) of approximately 1000. The jungfrau suncline was deformed bu more brittle nw-directed shear creating well-developed shear band cleavages at a late stage, after cooling by uplift and erosion. It is suggested that the external massifs of the apls are basement gneiss folds created at temperatures of 300 degrees C by detachment through ductile deformation of the upper crust of the european plate as it was underthrusted below the adriatic plate.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of non-metallic load transfer and reinforcement devices for concrete highway pavements is a possible alternative to avoid corrosion problems related to the current practice of steel materials. Laboratory and field testing of highway pavement dowel bars, made of both steel and fiber composite materials, and fiber composite tie rods were carried out in this research investigation. Fatigue, static, and dynamic testing was performed on full-scale concrete pavement slabs which were supported by a simulated subgrade and which included a single transverse joint. The bahavior of the full-scale specimens with both steel and fiber composite dowels placed in the test joints was monitored during several million load cycles which simulated truck traffic at a transverse joint. Static bond tests were conducted on fiber composite tie rods to determine the required embedment length. These tests took the form of bending tests which included curvature and shear in the embedment zone and pullout tests which subjected the test specimen to axial tension only. Fiber composite dowel bars were placed at two transverse joints during construction of a new concrete highway pavement in order to evaluate their performance under actual field conditions. Fiber composite tie rods were also placed in the longitudinal joint between the two fiber composite doweled transverse joints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE OF REVIEW: HIV targets primary CD4(+) T cells. The virus depends on the physiological state of its target cells for efficient replication, and, in turn, viral infection perturbs the cellular state significantly. Identifying the virus-host interactions that drive these dynamic changes is important for a better understanding of viral pathogenesis and persistence. The present review focuses on experimental and computational approaches to study the dynamics of viral replication and latency. RECENT FINDINGS: It was recently shown that only a fraction of the inducible latently infected reservoirs are successfully induced upon stimulation in ex-vivo models while additional rounds of stimulation make allowance for reactivation of more latently infected cells. This highlights the potential role of treatment duration and timing as important factors for successful reactivation of latently infected cells. The dynamics of HIV productive infection and latency have been investigated using transcriptome and proteome data. The cellular activation state has shown to be a major determinant of viral reactivation success. Mathematical models of latency have been used to explore the dynamics of the latent viral reservoir decay. SUMMARY: Timing is an important component of biological interactions. Temporal analyses covering aspects of viral life cycle are essential for gathering a comprehensive picture of HIV interaction with the host cell and untangling the complexity of latency. Understanding the dynamic changes tipping the balance between success and failure of HIV particle production might be key to eradicate the viral reservoir.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Steady state viscosity and thixotropy of hydrophobically modified hydroxyethyl cellulose HMHEC and nonassociative cellulose water solutions are studied. Although all the samples are shear thinning, only the HMHEC is thixotropic, since the migration of hydrophobes to micelles is controlled by diffusion. The Cross model fits steady state curves. The Mewis model, a phenomenological model that proposes that the rate of change of viscosity when the shear rate is suddenly changed is related to the difference between the steady state and current values of viscosity raised to an exponent, fits structure construction experiments when the exponent, n, is estimated to be around 2. The Newtonian assumption used by Mewis cannot be used here, however. This seems to be related to the fact that the thickening is due to bridged micelle formation, which is a slow process, and also to topological constraints and entanglements, which are rapid processes. The kinetic parameter was redefined to kn in order to make it independent of initial conditions. So, kn depends only on how the shear affects the structure. kn reaches a plateau at shear rates too low to produce structure destruction and decreases at higher shear rates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This demonstration project consisted of three adjacent highway resurfacing projects using asphalt cement concrete removed from an Interstate highway which had become severely rutted. The salvaged asphaltic concrete was later crushed and hauled to a plant site where it was combined with virgin materials to resurface the three projects. Only two of the projects were used for performance evaluation as the third project was in an interchange area including ramps and was otherwise too short. It was concluded that recycling was cost effective and a high quality surface can be constructed using recycled asphalt cement concrete.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research is reported which attempted to identify construction procedures that will provide an improved centerline joint on asphalt concrete pavements. Various construction procedures and their evaluation are described. Core densities were made and visual inspections were made 3 years after construction. Center cracking was measured at 4, 5, and 6 years. The only procedure to rank the same when comparing cracking and density (delete the 1:1 slope shoe on the edge) is described. This procedure had the highest average density and also the least cracking through 1985. This method provided the best performance for 4 years after construction and involved the removal of the 1:1 slope shoe from the paver when placing the surface course. This method had 9.0% cracked after 4 years and 100% cracked after 6 years of service.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A 5.8 mile section of Dubuque County (Iowa) Road D-53 was selected for this project, the objective of which were to: 1. identify a cost effective asphalt emulsion bound macadam typical cross section; 2. determine the effectiveness of engineering fabric placed under macadam roadbeds; and 3. evalaute the use of emulsions in surface seal coats. A number of conclusions were reached: 1. The minus #200 sieve material for the macadam stone should be held to a minimum. For the emulsion used on this project, the minus #200 material had less than 4 percent to achieve satisfactory coating of the macadam stone. 2. The placement of the emulsion treated macadam required no additional equipment or time than the plain macadam placement. 3. Emulsion treating the macadam stone for the shoulder base appears unnecessary. 4. The emulsion treated macadam base beneath an asphaltic concrete wearing surface yielded a higher structural rating than the plain macadam beneath a comparable ashaltic concrete surface. 5. The performance of the fabric between the subgrade and the macadam base to prevent soil intrusion into the base could not be determined by the non-destructive testing conducted. 6. When no choke stone is used over the macadam base, allowance for ac mix overrun should be made. 7. Use of an emulsion instead of a cutback asphalt saved money and energy. However, the poor performance of the seal coat negated any real savings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The joint between two lanes of asphalt pavement is often the first area of a roadway which shows signs of deterioration and requires maintenance. As the final lift of hot asphalt is being placed in a construction project, it is being forced p against the adjoining lane of cold asphalt, forming the longitudinal joint. The mating of the two lanes, to form a high quality seal, is often not fully successful and later results in premature stripping or raveling as water enters the unsealed joint. The application of a hot poured rubberized asphaltic joint sealant along the joint face in the final stage of construction should help to form a watertight joint seal. A new product, especially formulated for the longitudinal joint in asphalt pavements was proposed to improve joint sealing. The following describes the experimental application of the new product, Crafco, PN 34524.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Road Rater is a dynamic deflection measuring appa-ratus for flexible base pavements. The basic operating principle of the Road Rater is to impart a dynamic loading and measure the resultant movement of the pavement with velocity sensors. This data, when properly adjusted for temperature by use of a nomograph included in this report, can be used to determine pavement life expectancy and estimate overlay thickness required. Road Rater testing will be conducted in the spring, when pave-ments are in their weakest condition, until seasonal correction factors can be developed. The Road Rater does not have sufficient ram weight to effectively evaluate load carrying capacity of rigid pavements. All rigid pavements react similarly to Road Rater testing and generally deflect from 0.65 to 1.30 mils. Research will be continued to evaluate rigid pavements with the Road Rater, however. The Road Rater has proven to be a reliable, trouble free pavement evaluation machine. The deflection apparatus was originally front-mounted, but was rear-mounted during the winter of 1977-78. Since that time, van handling has greatly improved, and front suspension parts are no longer overstressed due to improper weight distribution. The Road Rater provides a fast, economical, nondestructive test method to evaluate flexible pavements. Road Rater test data can be used to predict pavement life, set priorities for asphaltic concrete resurfacing, and design asphaltic concrete overlays. Temperature and seasonal variations significantly affect Road Rater deflection readings and must be considered. A nomograph included in this report adjusts for temperature, but does not correct for seasonal effect. Road Rater testing will be conducted in the spring until seasonal correction factors can be developed. The Road Rater has not successfully evaluated rigid pavements, but research will continue in this area. 1. Recommendations for continuing Road Rater research, evaluation and application are as follows:A computer program should be established to reduce Road Rater raw data (Range and Sensor reading) to HR-178 Road Rater Dynamic Deflections For Determining Structural Rating Of Flexible Pavements mean deflection (mils) and/or structural rating. This computer printout would be similar to present friction testing printouts, and would greatly reduce Road Rater data reduction manpower needs and costs. 2. Seasonal variation study should continue to develop seasonal correction factors. Seasonal test roads will be studied concurrently with routine testing during 1979 to develop this relationship. All Road Rater testing will be conducted in the spring until the seasonal relationship is established. 3. An asphaltic concrete overlay design method should be established based on Road Rater de-flection readings. The AASHTO Interim Guide for Design of Pavement Structures 1972 will be used as a base document for this study. 4. AASHTO Structural numbers should be compared to Road Rater Structural Ratings during 1979 on asphaltic concrete overlay projects. This analysis will enable us to refine Road Rater evaluation of flexible pavements. Roads will be tested before resurfacing and several months

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some asphalt roadways tend to develop wheelpath ruts over time when exposed to heavy traffic. As the rutting increases in depth, the travel comfort and levels of safety decrease. A variety of remedies involving major or minor operations can be applied to eliminate ruts and renew the roadway surface. One of the simple remedies, called Ralumac microsurfacing, involves only a longitudinal band over the rut. For better coverage, ruts are filled initially and followed by a complete thin surface wearing cover over the roadway.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the most serious impediments to the continued successful use of hot-mix asphalt (HMA) pavements is rutting. The Iowa Department of Transportation has required 85% crushed particles and 75-blow Marshall mix design in an effort to prevent rutting on Interstate roadways. Relationships between the percent of crushed particles and resistance to rutting in pavement through the use of various laboratory test procedures must be developed. HMA mixtures were made with 0, 30, 60, 85, and 100% crushed gravel, crushed limestone, and crushed quartzite combined with uncrushed sand and gravel. These aggregate combinations were used with 4, 5, and 6% asphalt cement (ac). Laboratory tests included Marshall stability, resilient modulus, indirect tensile, and creep. A creep resistance factor (CRF) was developed to provide a single numeric value for creep test results. The CRF values relate well to the amount of crushed particles and the perceived resistance to rutting. The indirect tensile test is highly dependent on the ac with a small effect from the percent of crushed particles. The Marshall stability from 75-blow compaction relates well to the percent of crushed particles. The resilient modulus in some cases is highly affected by grade of ac.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.