830 resultados para LITHIUM INSERTION


Relevância:

10.00% 10.00%

Publicador:

Resumo:

PURPOSE: To examine the relationship between contact lens (CL) case contamination and various potential predictive factors. METHODS: 74 subjects were fitted with lotrafilcon B (CIBA Vision) CLs on a daily wear basis for 1 month. Subjects were randomly assigned one of two polyhexamethylene biguanide (PHMB) preserved disinfecting solutions with the corresponding regular lens case. Clinical evaluations were conducted at lens delivery and after 1 month, when cases were collected for microbial culture. A CL care non-compliance score was determined through administration of a questionnaire and the volume of solution used was calculated for each subject. Data was examined using backward stepwise binary logistic regression. RESULTS: 68% of cases were contaminated. 35% were moderately or heavily contaminated and 36% contained gram-negative bacteria. Case contamination was significantly associated with subjective dryness symptoms (OR 4.22, CI 1.37–13.01) (P<0.05). There was no association between contamination and subject age, ethnicity, gender, average wearing time, amount of solution used, non-compliance score, CL power and subjective redness (P>0.05). The effect of lens care system on case contamination approached significance (P=0.07). Failure to rinse the case with disinfecting solution following CL insertion (OR 2.51, CI 0.52–12.09) and not air drying the case (OR 2.31, CI 0.39–13.35) were positively correlated with contamination; however, did not reach statistical significance. CONCLUSIONS: Our results suggest that case contamination may influence subjective comfort. It is difficult to predict the development of case contamination from a variety of clinical factors. The efficacy of CL solutions, bacterial resistance to disinfection and biofilm formation are likely to play a role. Further evaluation of these factors will improve our understanding of the development of case contamination and its clinical impact.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the structure of the title compound, [C8H11LiO4(H2O)2]n the distorted tetrahadral LiO4 coordination sphere comprises two water molecules and two carboxyl O-donors from separate bridging cis-2-carboxycyclohexane-1-carboxylate monoanions [Li-O range, 1.887(4)-1.946(3)A], giving chain substructures which extend along (010). Water-water and water-carboxyl O-H...O hydrogen bonds stabilize these chain structures and provide inter-chain links, resulting in a two-dimensional layered structure extending across (011).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As part of a development plan-in-progress spanning a total of 25 years(1996 to 2020), Malaysia’s Multimedia Super Corridor (MSC) provides a unique opportunity to witness a brief and microcosmic unfolding of the reciprocally formative process between society and technology that Lewis Mumford lays out in exhaustive detail in Technics and Civilization (Mumford, 1963). The interlocking of national imagining, destiny and progress with a specific group of technologies, information and communication technologies(ICT) is, in itself, worthy of interest. However, what renders the MSC doubly remarkable is its introduction in Malaysia, one of the most well established of contemporary ethnocracies. This chapter reads the development and implementation of the MSC as the text through which the association between nation and ethnicity is examined. Broadly speaking I argue here that the MSC inflects the imagining(s) of Malaysia at two levels. At the first level where the MSC is understood to be the insertion of a new policy into Malaysia’s pre existent ethnocratic climate, I contend the MSC inflects the nation through its incongruence with prevalent conditions. At the second level, where the MSC is viewed through the position of its Chinese populace, I suggest that the MSC inflects Malaysia (perhaps to a lesser degree) through the re-emphasis it lends to issues of transnationalism and belonging for the Malaysian Chinese.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available, which is thought of as a relaxation of no-wait conditions. With thorough analysis of the structural properties of the No-Wait Blocking Parallel-Machine Job-Shop-Scheduling (NWBPMJSS) problem that is originated in this research, an innovative generic constructive algorithm (called NWBPMJSS_Liu-Kozan) is proposed to construct the feasible train timetable in terms of a given order of trains. In particular, the proposed NWBPMJSS_Liu-Kozan constructive algorithm comprises several recursively-used sub-algorithms (i.e. Best-Starting-Time-Determination Procedure, Blocking-Time-Determination Procedure, Conflict-Checking Procedure, Conflict-Eliminating Procedure, Tune-up Procedure and Fine-tune Procedure) to guarantee feasibility by satisfying the blocking, no-wait, deadlock-free and conflict-free constraints. A two-stage hybrid heuristic algorithm (NWBPMJSS_Liu-Kozan-BIH) is developed by combining the NWBPMJSS_Liu-Kozan constructive algorithm and the Best-Insertion-Heuristic (BIH) algorithm to find the preferable train schedule in an efficient and economical way. Extensive computational experiments show that the proposed methodology is promising because it can be applied as a standard and fundamental toolbox for identifying, analysing, modelling and solving real-world scheduling problems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research deals with an innovative methodology for optimising the coal train scheduling problem. Based on our previously published work, generic solution techniques are developed by utilising a “toolbox” of standard well-solved standard scheduling problems. According to our analysis, the coal train scheduling problem can be basically modelled a Blocking Parallel-Machine Job-Shop Scheduling (BPMJSS) problem with some minor constraints. To construct the feasible train schedules, an innovative constructive algorithm called the SLEK algorithm is proposed. To optimise the train schedule, a three-stage hybrid algorithm called the SLEK-BIH-TS algorithm is developed based on the definition of a sophisticated neighbourhood structure under the mechanism of the Best-Insertion-Heuristic (BIH) algorithm and Tabu Search (TS) metaheuristic algorithm. A case study is performed for optimising a complex real-world coal rail system in Australia. A method to calculate the lower bound of the makespan is proposed to evaluate results. The results indicate that the proposed methodology is promising to find the optimal or near-optimal feasible train timetables of a coal rail system under network and terminal capacity constraints.