948 resultados para Efficiency. DEA. Contracts. Transaction costs. Oil industry
Resumo:
Mestrado em Intervenção Sócio-Organizacional na Saúde. Área de especialização: Políticas de Administração e Gestão de Serviços de Saúde.
Resumo:
OBJECTIVE: The Integrated Management of Childhood Illness is a strategy designed to address major causes of child mortality. The aim of this study was to assess the impact of the strategy on the quality of child health care provided at primary facilities. METHODS: Child health quality of care and costs were compared in four states in Northeastern Brazil, in 2001. There were studied 48 health facilities considered to have had stable strategy implementation at least two years before the start of study, with 48 matched comparison facilities in the same states. A single measure of correct management of sick children was used to assess care provided to all sick children. Costs included all resources at the national, state, local and facility levels associated with child health care. RESULTS: Facilities providing strategy-based care had significantly better management of sick children at no additional cost to municipalities relative to the comparison municipalities. At strategy facilities 72% of children were correctly managed compared with 56% in comparison facilities (p=0.001). The cost per child managed correctly was US$13.20 versus US$21.05 in the strategy and comparison municipalities, respectively, after standardization for population size. CONCLUSIONS: The strategy improves the efficiency of primary facilities in Northeastern Brazil. It leads to better health outcomes at no extra cost.
Resumo:
Mestrado em Engenharia Química. Ramo optimização energética na indústria química.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia mecânica
Resumo:
A empresa Petibol, S.A. – Embalagens de plástico centra-se na produção de embalagens de plástico a partir da matéria-prima Poliestireno Expandido (EPS) e Polipropileno Expandido (EPP). A empresa possui uma preocupação ao nível da qualidade da água e do aproveitamento energético, tendo desta forma surgido a realização do estudo na unidade industrial, com o objectivo de anular e/ou diminuir as possíveis lacunas existentes na unidade industrial. Numa primeira etapa foi realizada uma caracterização global à qualidade da água e à empresa, actualizando-se os esquemas já existentes, contabilizando-se os custos actuais relativamente aos processos no circuito da água (arrefecimento, aquecimento e pressurização), e por fim, efectuou-se um levantamento in loco do circuito de água, relativamente à pressão, temperatura e caudal. Numa fase posterior, foram propostos equipamentos e processos, tendo em vista a colmatação dos problemas identificados, realizando-se um subsequente estudo relativamente aos custos inerentes a esses novos processos. A caracterização à água foi avaliada em diferentes pontos do circuito industrial, tendo-se determinado na Sala de Bombagem que o filtro de areia não possuía as dimensões mais apropriadas, existindo também um problema a nível mecânico associado ao processo de contra-lavagem. Tais factos podem ser a causa da ocorrência de um aumento do teor de sólidos após a passagem na camada filtrante. Relativamente ao amaciador, este deveria amaciar de forma completa a água para alimentação à caldeira, embora se tenha registado à saída do amaciador uma dureza de 21,3 mg/L, denunciando problemas na troca iónica. No que toca à água de alimentação à caldeira, verifica-se a existência de parâmetros que não se encontram de acordo com os critérios enunciados para uma óptima qualidade, sendo eles o pH (10,14), condutividade (363 μS/cm), teor de ferro (1,21 mg/L) e a dureza (16 mg/L). De salientar que somente o teor de cobre, que se encontra em quantidades vestigiais, apresenta-se de acordo com os valores impostos. No que respeita à água da caldeira, esta apresenta parâmetros incompatíveis com os recomendados, sendo eles a condutividade (7350 μS/cm), teor de sólidos dissolvidos (5248 mg/L) e alcalinidade total (780 mg/L). De referir que o valor de pH (11,8) não se encontra de acordo com a aplicação do tratamento “fosfato-pH coordenado”. Em relação aos parâmetros com valores que se encontram dentro dos limites, estes correspondem à dureza (0 mg/L), ao teor de fosfatos (45 mg/L) e teor de sílica (0 mg/L). A água do circuito de arrefecimento foi sujeita a uma análise microbiológica, que corroborou a presença de um biofilme. Um dos problemas enunciados pela empresa, prendia-se com a impossibilidade de descarga, no colector municipal, dos condensados dos compressores, visto apresentarem uma quantidade de óleo de cerca de 43,3 mg/L, equivalente a quatro vezes o valor limite de emissão, de acordo com a legislação municipal. Por fim, o efluente de descarga industrial apresenta um valor de pH (10,3) acima do intervalo permitido por lei (6,0 – 9,0), sendo que a corrente que mais contribui para este acréscimo de pH corresponde à corrente proveniente da água de purga, visto esta apresentar um valor de pH de 12,22. De maneira a contornar os parâmetros enunciados, é proposto a substituição do filtro de areia da Sala de Bombagem, assim como a inserção de um conjunto de medidas de remoção de ferro e desinfecção, sendo a conjugação de arejamento, coagulação, filtração e desinfecção, por parte do hipoclorito, a proposta apresentada. Aos condensados dos compressores é apresentado um sistema de separação, que possibilita a remoção do óleo da água, e uma consequente descarga da mesma. Actualmente, não existe qualquer filtro de areia no circuito de arrefecimento da água, sendo proposto assim esse equipamento, de forma a minorar o desenvolvimento da população microbiana, bem como a permitir uma maior eficiência na transferência de calor na torre de arrefecimento. Relativamente à descarga industrial, é recomendável a colocação de um sistema de regularização automática de pH. A inserção de uma válvula de três vias permite um aproveitamento energético e de água, a partir da confluência da água oriunda dos furos com a água do tanque de água fria, sendo posteriormente alimentada à central de vácuo. No estudo da recuperação energética, um outro equipamento avaliado correspondeu à serpentina, no entanto, verificou-se que a poupança no consumo de gás natural era de apenas 0,005%, o que não se mostrou uma proposta viável. O orçamento de todos os equipamentos é de 11.720,76 €, possibilitando não só um melhor funcionamento industrial, como um menor impacto a nível ambiental. Os custos futuros de funcionamento aumentam em 3,36%, tendo a pressurização um aumento do seu custo em 3,4% em relação ao custo actual, verificando-se um custo anual de 10.781,21€, em relação aos processos de arejamento, coagulação e desinfecção.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização em Edificações
Resumo:
O desenvolvimento deste trabalho teve como objectivo a optimização de um sistema de climatização industrial, constituído por quatro centrais de climatização adiabáticas, que apresentam limitações de capacidade de arrefecimento, controlo e eficiência. Inicialmente foi necessária a pesquisa bibliográfica e recolha de informação relativa à indústria têxtil e ao processo de arrefecimento evaporativo. Numa fase posterior foram recolhidos e analisados os diversos dados essenciais à compreensão do binómio edifício/sistema de climatização, para a obtenção de possíveis hipóteses de optimização. Da fase de recolha de informações e dados, destaca-se, também, a realização de análises à qualidade do ar interior (QAI). As optimizações seleccionadas como passíveis de implementação, foram estudadas e analisadas com o auxílio do software de simulação energética dinâmica DesignBuilder e os resultados obtidos foram devidamente trabalhados e ajustados de modo a permitir uma assimilação amigável e de fácil interpretação das suas vantagens e desvantagens, tendo ainda sido objecto de estudo de viabilidade económica. A optimização proposta reflecte uma melhoria substancial das condições interiores ao nível da temperatura e humidade relativa, resultando, ainda assim, numa redução de consumos energéticos na ordem dos 23 % (490.337 kWh), isto é, uma poupança anual de 42.169 € aos custos de exploração e com um período de retorno de 1 ano e 11 meses.
Resumo:
Heavy metal pollution is a matter of concern in industrialised countries. Contrary to organic pollutants, heavy metals are not metabolically degraded. This fact has two main consequences: its bioremediation requires another strategy and heavy metals can be indefinitely recycled. Yeast cells of Saccharomyces cerevisiae are produced at high amounts as a by-product of brewing industry constituting a cheap raw material. In the present work, the possibility of valorising this type of biomass in the bioremediation of real industrial effluents containing heavy metals is reviewed. Given the autoaggregation capacity (flocculation) of brewing yeast cells, a fast and off-cost yeast separation is achieved after the treatment of metal-laden effluent, which reduces the costs associated with the process. This is a critical issue when we are looking for an effective, eco-friendly, and low-cost technology. The possibility of the bioremediation of industrial effluents linked with the selective recovery of metals, in a strategy of simultaneous minimisation of environmental hazard of industrial wastes with financial benefits from reselling or recycling the metals, is discussed.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
The electricity industry throughout the world, which has long been dominated by vertically integrated utilities, has experienced major changes. Deregulation, unbundling, wholesale and retail wheeling, and real-time pricing were abstract concepts a few years ago. Today market forces drive the price of electricity and reduce the net cost through increased competition. As power markets continue to evolve, there is a growing need for advanced modeling approaches. This article addresses the challenge of maximizing the profit (or return) of power producers through the optimization of their share of customers. Power producers have fixed production marginal costs and decide the quantity of energy to sell in both day-ahead markets and a set of target clients, by negotiating bilateral contracts involving a three-rate tariff. Producers sell energy by considering the prices of a reference week and five different types of clients with specific load profiles. They analyze several tariffs and determine the best share of customers, i.e., the share that maximizes profit. © 2014 IEEE.
Resumo:
Mestrado em Contabilidade e Análise Financeira
Resumo:
Waste oil recycling companies play a very important role in our society. Competition among companies is tough and process optimization is essential for survival. By equipping oil containers with a level monitoring system that periodically reports the level and alerts when it reaches the preset threshold, the oil recycling companies are able to streamline the oil collection process and, thus, reduce the operation costs while maintaining the quality of service. This paper describes the development of this level monitoring system by a team of four students from different engineering backgrounds and nationalities. The team conducted a study of the state of the art, draw marketing and sustainable development plans and, finally, designed and implemented a prototype that continuously measures the container content level and sends an alert message as soon as it reaches the preset capacity.
Resumo:
The electricity industry throughout the world, which has long been dominated by vertically integrated utilities, has experienced major changes. Deregulation, unbundling, wholesale and retail wheeling, and real-time pricing were abstract concepts a few years ago. Today market forces drive the price of electricity and reduce the net cost through increased competition. As power markets continue to evolve, there is a growing need for advanced modeling approaches. This article addresses the challenge of maximizing the profit (or return) of power producers through the optimization of their share of customers. Power producers have fixed production marginal costs and decide the quantity of energy to sell in both day-ahead markets and a set of target clients, by negotiating bilateral contracts involving a three-rate tariff. Producers sell energy by considering the prices of a reference week and five different types of clients with specific load profiles. They analyze several tariffs and determine the best share of customers, i.e., the share that maximizes profit. © 2014 IEEE.
Resumo:
The most active phase of the fluid catalytic cracking (FCC) catalyst, used in oil refinery, is zeolite-Y which is an aluminosilicate with a high internal and external surface area responsible for its high reactivity. Waste FCC catalyst is potentially able to be reused in cement-based materials - as an additive - undergoing a pozzolanic reaction with calcium hydroxide (Ca(OH)2) formed during cement hydration [1-3]. This reaction produces additional strength-providing reaction products i.e., calcium silicate hydrate (C-S-H) and hydrous calcium aluminates (C-A-H) which exact chemical formula and structure are still unknown. Partial replacement of cement by waste FCC catalyst has two key advantages: (1) lowering of cement production with the associated pollution reduction as this industry represents one of the largest sources of man-made CO2 emissions, and (2) improving the mechanical properties and durability of cement-based materials. Despite these advantages, there is a lack of fundamental knowledge on pozzolanic reaction mechanisms as well as spatial distribution of porosity and solid phases interactions at the microstructural level and consequently their relationship with macroscopical engineering properties of catalyst/cement blends. Within this scope, backscattered electron (BSE) images acquired in a scanning electron microscope (SEM) equipped with Energy-Dispersive Spectroscopy (EDS) and by X-ray diffraction were used to investigate chemical composition of hydration products and to analyse spatial information of the microstructure of waste FCC catalyst blended cement mortars. For this purpose mortars with different levels of cement substitution by waste catalyst as well as with different hydration ages, were prepared. The waste FCC catalyst used is produced by the Portuguese refinery company Petrogal S.A.
Resumo:
The present paper shows preliminary results of an ongoing project which one of the goals is to investigate the viability of using waste FCC catalyst (wFCC), originated from Portuguese oil refinery, to produce low carbon blended cements. For this purpose, four blended cements were produced by substituting cement CEM I 42.5R up to 20% (w/w) by waste FCC catalyst. Initial and final setting times, consistency of standard paste, soundness and compressive strengths after 2, 7 and 28 days were measured. It was observed that the wFCC blended cements developed similar strength, at 28 days, compared to the reference cement, CEM I 42.5R. Moreover, cements with waste FCC catalyst incorporation up to 15% w/w meet European Standard EN 197-1 specifications for CEM II/A type cement, in the 42.5R strength class.