924 resultados para Distribution system restoration
Resumo:
Open access philosophy applied by regulatory agencies may lead to a scenario where captive consumers will solely face the responsibility on distribution network's losses even with Independent Energy Producers (also known as Distributed Generation) and Independent Energy Consumers connected to the system. This work proposes the utilization of a loss allocation method in distribution systems where open access is allowed, in which cross-subsidies, that appear due to the influence the generators have over the system losses, are minimized. Thus, guaranteeing to some extent the efficiency and transparency of the economic signals of the market. Results obtained through the Zbus loss allocation method adapted for distribution networks are processed in such a way that the corresponding allocation to the generation buses is divided among the consumer buses, while still considering consumers spatial characteristics. © 2007 IEEE.
Resumo:
This paper presents the comparison of three topologies of multilevel inverters applied to drive an induction motor of 500 kVA/4.16 kV. The multilevel inverters analyzed are: a neutral point clamped inverter, a symmetrical cascaded multilevel inverter and a hybrid asymmetrical cascaded multilevel inverter. The performance indexes used in the comparison are total harmonic distortion, first order distortion factor, semiconductors power losses distribution and heat-sink volume. The comparison is developed with the purpose of finding the efficiency and the heat-sink volume where the three systems present the same output filter. ©2008 IEEE.
Resumo:
In this paper, a methodology based on Unconstrained Binary Programming (UBP) model and Genetic Algorithms (GAs) is proposed for estimating fault sections in automated distribution substations. The UBP model, established by using the parsimonious set covering theory, looks for the match between the relays' protective alarms informed by the SCADA system and their expected states. The GA is developed to minimize the UBP model and estimate the fault sections in a swift and reliable manner. The proposed methodology is tested by utilizing a real-life automated distribution substation. Control parameters of the GA are tuned to achieve maximum computational efficiency and reduction of processing time. Results show the potential and efficiency of the methodology for estimating fault section in real-time at Distribution Control Centers. ©2009 IEEE.
Resumo:
Unbalance and harmonics are two major distortions in the three-phase distribution systems. In this paper an investigation into unbalance phenomena in the distribution networks using instantaneous space vector theory, is presented. Power oscillation index (POI) and effective power factor (PFe) are calculated in the network nodes for several unbalance loading conditions. For system analysis a general power flow algorithm for three-phase four-wire radial distribution networks, based on backward-forward technique, is applied. Results obtained from several case studies using medium and low voltage test feeder with unbalanced load, are presented and discussed. © 2010 Praise Worthy Prize S.r.l. - All rights reserved.
Resumo:
This paper presents the work in progress of an on-demand software deployment system based on application virtualization concepts which eliminates the need of software installation and configuration on each computer. Some mechanisms were created, such as mapping of utilization of resources by the application to improve the software distribution and startup; a virtualization middleware which give all resources needed for the software execution; an asynchronous P2P transport used to optimizing distribution on the network; and off-line support where the user can execute the application even when the server is not available or when is out of the network. © Springer-Verlag Berlin Heidelberg 2010.
Resumo:
Includes bibliography
Resumo:
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. © 2010 Elsevier Ltd.
Resumo:
This paper proposes a new approach for optimal phasor measurement units placement for fault location on electric power distribution systems using Greedy Randomized Adaptive Search Procedure metaheuristic and Monte Carlo simulation. The optimized placement model herein proposed is a general methodology that can be used to place devices aiming to record the voltage sag magnitudes for any fault location algorithm that uses voltage information measured at a limited set of nodes along the feeder. An overhead, three-phase, three-wire, 13.8 kV, 134-node, real-life feeder model is used to evaluate the algorithm. Tests show that the results of the fault location methodology were improved thanks to the new optimized allocation of the meters pinpointed using this methodology. © 2011 IEEE.
Resumo:
This paper presents an approach for probabilistic analysis of unbalanced three-phase weakly meshed distribution systems considering uncertainty in load demand. In order to achieve high computational efficiency this approach uses both an efficient method for probabilistic analysis and a radial power flow. The probabilistic approach used is the well-known Two-Point Estimate Method. Meanwhile, the compensation-based radial power flow is used in order to extract benefits from the topological characteristics of the distribution systems. The generation model proposed allows modeling either PQ or PV bus on the connection point between the network and the distributed generator. In addition allows control of the generator operating conditions, such as the field current and the power delivery at terminals. Results on test with IEEE 37 bus system is given to illustrate the operation and effectiveness of the proposed approach. A Monte Carlo Simulations method is used to validate the results. © 2011 IEEE.
Resumo:
This paper presents small-signal stability studies of a multimachine power system, considering Static Synchronous Compensators (STATCOM)and discussed control modes of the STATCOM. The Power Sensitivity Model(PSM)is used to represent the electric power system. The study is based on modal analysis and time domain simulations. The results obtained allow concluding that the STATCOM improves the stabilization in the electric power system. © 2011 IEEE.
Resumo:
Multinodal load forecasting deals with the loads of several interest nodes in an electrical network system, which is also known as bus load forecasting. To perform this demand, it is necessary a technique that is precise, trustable and has a short-time processing. This paper proposes two methodologies based on general regression neural networks for short-term multinodal load forecasting. The first individually forecast the local loads and the second forecast the global load and individually forecast the load participation factors to estimate the local loads. To design the forecasters it wasn't necessary the previous study of the local loads. Tests were made using a New Zealand distribution subsystem and the results obtained are compatible with the ones founded in the specialized literature. © 2011 IEEE.
Resumo:
With the arrival of self-etch adhesives systems, there has been a rise in interest among clinicians, making it imperative for health professionals to have knowledge of the properties, characteristics, the association as well as the dental structures of these materials, in order to select them and use them correctly. The self-etch adhesive systems show good values of bond strength, microleakage and performance, and have therefore become an option in direct adhesive restorations. In the regard, this case study aims to describe the technique involving the use of selfetch adhesives system for direct restoration of anterior teeth.
Resumo:
This study evaluated using of Multicriteria Evaluation in a GIS, specifically by Weighted Linear Combination Method for generation of map of priority areas for forest restoration in the initial part of River Pardo Basin, SP, in order to water resources conservation. Aiming to define criteria and restrictions it was used Participatory Techniques, and the following factors had been selected: proximity of the hydrographic network, proximity of forest cover, slope and erodibility of soil. To calculate the weight to each factor it was used the decision-making process, known as Analytic Hierarchy Analysis, this method consists of a paired comparison of factors to determine the relative importance of each. According to Weighted Linear Combination, the very high priority areas have a more limited spatial distribution, with an apparent concentration around the water bodies, outlining a buffer to the river system. The proximity factor of the hydrographic network, and enables the connection forestry, contributed, along with the factor of proximity to forest cover, so there would be the definition of most of the areas with the highest priority in the basin, which concentrate the largest areas of forest and native riparian areas along the hydrographic.
Resumo:
Purpose: To evaluate the stress distribution in peri-implant bone by simulating the effect of an implant with microthreads and platform switching on angled abutments through tridimensional finite element analysis. The postulated hypothesis was that the presence of microthreads and platform switching would reduce the stress concentration in the cortical bone. Methods: Four mathematical models of a central incisor supported by an implant (5.0mm×13mm) were created in which the type of thread surface in the neck portion (microthreaded or smooth) and the diameter of the angled abutment connection (5.0 and 4.1mm) were varied. These models included the RM (regular platform and microthreads), the RS (regular platform and smooth neck surface), the SM (platform switching and microthreads), and the SS (platform switching and smooth neck). The analysis was performed using ANSYS Workbench 10.0 (Swanson Analysis System). An oblique load (100N) was applied to the palatine surface of the central incisor. The bone/implant interface was considered to be perfectly integrated. Values for the maximum (σmax) and minimum (σmin) principal stress, the equivalent von Mises stress (σvM), and the maximum principal elastic strain (e{open}max) for cortical and trabecular bone were obtained. Results: For the cortical bone, the highest σmax (MPa) were observed for the RM (55.1), the RS (51.0), the SM (49.5), and the SS (44.8) models. The highest σvM (MPa) were found for the RM (45.4), the SM (42.1), the RS (38.7), and the SS models (37). The highest values for σmin were found for the RM, SM, RS and SS models. For the trabecular bone, the highest σmax values (MPa) were observed in the RS model (6.55), followed by the RM (6.37), SS (5.6), and SM (5.2) models. Conclusion: The hypothesis that the presence of microthreads and a switching platform would reduce the stress concentration in the cortical bone was partially rejected, mainly because the microthreads increased the stress concentration in cortical bone. Only platform switching reduced the stress in cortical bone. © 2012 Japan Prosthodontic Society.
Resumo:
In trickle irrigation systems, the design is based on the pre-established emission uniformity (EU) which is the combined result of the equipment characteristics and its hydraulic configuration. However, this desired value of the EU may not be confirmed by the final project (in field conditions) and neither by the yield uniformity. The hypotheses of this research were: a) the EU of a trickle irrigation system at field conditions is equal to the emission uniformity pre-established in the its design; b) EU has always the lowest value when compared with other indicators of uniformity; c) the discharge variation coefficient (VC) is not equal to production variation coefficient in the operational unit; d) the difference between the discharge variation coefficient and the productivity variation coefficient depends on the water depth applied. This study aimed to evaluate the relationship between EU used in the irrigation system design and the final yield uniformity. The uniformity indicators evaluated were: EU, distribution uniformity (UD) and the index proposed by Barragan & Wu (2005). They were compared estimating the performance of a trickle irrigation system applied in a citrus orchard with dimensions of 400m x 600m. The design of the irrigation system was optimized by a Linear Programming model. The tree rows were leveled in the larger direction and the spacing adopted in the orchard was 7m x 4m. The manifold line was always operating on a slope condition. The sensitivity analysis involved different slopes, 0, 3, 6, 9 and 12%, and different values of emission uniformity, 60, 70, 75, 80, 85, 90 and 94%. The citrus yield uniformity was evaluated by the variation coefficient. The emission uniformity (EU) after design differed from the EU pre-established, more sharply in the initial values lower than 90%. Comparing the uniformity indexes, the EU always generated lower values when compared with the UD and with the index proposed by Barragan. The emitter variation coefficient was always lower than the productivity variation coefficient. To obtain uniformity of production, it is necessary to consider the irrigation system uniformity and mainly the water depth to be applied.