972 resultados para ZrO(2)center dot nH(2)O nanoparticles
Resumo:
The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five-Year Transportation Improvement Program (Five-Year Program) to inform Iowans of planned investments in our state’s multi-modal transportation system. The Five-Year Program is typically updated and approved each year in June. The Five-Year Program encompasses investments in aviation, transit, railroads, trails, and highways. This brochure describes the programming process used by the Commission and Iowa DOT to develop the highway section of the Five-Year Program.
High prevalence of osteoporosis in Swiss women aged 60 and older: a 2-year pilot screening campaign.
Resumo:
Background: Osteoporosis (OP) is frequent in postmenopausal women, but remains underdiagnosed and undertreated. In Switzerland, DXA is not reimbursed by the insurances for screening, even if it is recommended to test women's Bone Mineral Density (BMD) at the age of 65. Methods: To assess the feasibility of a screening program for OP, the Bone diseases center of Lausanne has been mandated to perform a 2-year information and screening campaign (3 days per months) for women age 60 and older through the state of Vaud using a mobile unit for bone assessment. This project is still ongoing. Women are informed by media for dates and screening locations. Appointments are taken by phone. Women known for osteoporosis or already treated are excluded. During the evaluation every women is assessed by a questionnaire for risk factors, by a DXA measurement (Discovery C, Hololgic), and by Vertebral Fracture Assessment (VFA) for Genant's grades 2 and 3 prevalent vertebral fractures (VF). Women are considered at high risk of fracture if they have a hip fracture, a VF, another fragility fracture with a BMD T-score ≤-2 or a BMD T-score ≤-2.5. Results: After 17 months (50 days of screening), 752 women were assessed, mean age 66±6 yrs, mean BMI 26±5 kg/m2, mean lowest T-score -1.6±1.0 SD. 215 women (29%) were considered at high risk, 92 of them (12%) having established OP and 50 (7%) having one or more fragility VF. VF were unknown for 83% of the women and discovered by VFA. The number needed to screen (NNS) were 3.5 for high risk women, 8.2 for established OP and 15 for VF. Conclusions: After near ¾ of the project, prevalence of women at high risk of fracture was high, with a NNS below 4. Knowing the global cost of OP and that current treatment have a high efficacy for fracture risk reduction, such a screening program could have a positive economic impact. VFA allowed discovering many women with unknown VF, who were at very high risk of further fractures. A systematic screening for VF should be added to BMD measurements after the age of 60.
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health.
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health.
Resumo:
The recommendations for the treatment of type 2 diabetic patients are often centered on the glycemia. These clinical trials based on this approach show only a beneficial effects on the prevention of microangiopathy. The coronary artery disease which is the main cause of mortality among these patients, is not reduced. These data should be interpreted with a systemic prospect. The diabetes vascular complications have multifactorial causes and these clinical trials are motivated for the promotion of hypoglycemic agents. Fortunately, the STENO study offers another glance on the treatment of the diabetes, associating multirisk approach and patients' accompaniment. It obliges to have a critical glance on the research often moved by economic issues and gives to the center a humanistic approach based on the therapeutic relation.
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health.
Resumo:
News from Main Street Iowa and the Iowa Downtown Resource Center
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Resumo:
The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health.
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health.
Resumo:
The Office of Special Investigations at Iowa Department of Transportation (DOT) collects FWD data on regular basis to evaluate pavement structural conditions. The primary objective of this study was to develop a fully-automated software system for rapid processing of the FWD data along with a user manual. The software system automatically reads the FWD raw data collected by the JILS-20 type FWD machine that Iowa DOT owns, processes and analyzes the collected data with the rapid prediction algorithms developed during the phase I study. This system smoothly integrates the FWD data analysis algorithms and the computer program being used to collect the pavement deflection data. This system can be used to assess pavement condition, estimate remaining pavement life, and eventually help assess pavement rehabilitation strategies by the Iowa DOT pavement management team. This report describes the developed software in detail and can also be used as a user-manual for conducting simulation studies and detailed analyses. *********************** Large File ***********************
Resumo:
IRENE’s mission is to improve the health and well-being of Iowans through collaboration in practice-based research on questions important to primary care physicians and their patients. IRENE’s purpose is to create and foster a network of research collaboration between the academic medical center and primary care physicians through out the state of Iowa with a particular focus on improving rural health.
Resumo:
IRENE’s mission is to improve the health and well-being of Iowans through collaboration in practice-based research on questions important to primary care physicians and their patients. IRENE’s purpose is to create and foster a network of research collaboration between the academic medical center and primary care physicians through out the state of Iowa with a particular focus on improving rural health.