906 resultados para ZINC ORTHOSILICATE
Resumo:
"References to technical literature":p. 165-193.
Resumo:
At head of title: Imperial Mineral Resources Bureau.
Resumo:
"Extrait de la Revue universelle des mines, etc., tome VI, 4e série, pagee 221, 48e année, 1904.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references (p. 32-35).
Resumo:
Cover title.
Resumo:
"Cooperative agreement number CR-815829."
Resumo:
"31642"--Colophon.
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
"September 2003."
Resumo:
"Contributions from the Chemical Laboratory of Harvard College."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.