858 resultados para Power management


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Infrastructure organisations are operating in an increasingly challenging business environment as a result of globalisation, privatisation and deregulation. Under such circumstances, asset managers need to manage their infrastructure assets effectively in order to contribute to the overall performance of their organisation. In an external business environment that is constantly changing, extant literature on strategic management advocates a resourced--�]based view (RBV) approach that focuses on factors internal to the organisation such as resources and capabilities to sustain organisation performance. The aim of this study is to explore the core capabilities needed in the management of infrastructure assets. Using a multiple case study research strategy focusing on transport infrastructure, this research firstly examines the goals of infrastructure asset management and their alignment with broader corporate goals of an infrastructure organisation. It then examines the strategic infrastructure asset management processes that are needed to achieve these goals. The core capabilities that can support the strategic infrastructure asset management processes are then identified. This research produced a number of findings. First, it provided empirical evidence that asset management goals are being pursued with the aim of supporting the broader business goals of infrastructure organisations. Second, through synthesising the key asset management processes deemed necessary to achieve the asset management goals, a strategic infrastructure asset management model is proposed. Third, it identified five core capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information management capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building for a sustainable environment requires sustainable infrastructure assets. Infrastructure capacity management is the process of ensuring optimal provision of such infrastructure assets. Effectiveness in this process will enable the infrastructure asset owners and its stakeholders to receive full value on their investment. Business research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With limited access to resources, the challenge for infrastructure organisations is to identify and develop core capabilities to enable infrastructure capacity management. This chapter explores the concept of capability and identifies the core capability needed in infrastructure capacity management. Through a case study of the Port of Brisbane, this chapter shows that infrastructure organisations must develop their intelligence gathering capability to effectively manage the capacity of their infrastructure assets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this chapter we propose clipping with amplitude and phase corrections to reduce the peak-to-average power ratio (PAR) of orthogonal frequency division multiplexed (OFDM) signals in high-speed wireless local area networks defined in IEEE 802.11a physical layer. The proposed techniques can be implemented with a small modification at the transmitter and the receiver remains standard compliant. PAR reduction as much as 4dB can be achieved by selecting a suitable clipping ratio and a correction factor depending on the constellation used. Out of band noise (OBN) is also reduced.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Parallel combinatory orthogonal frequency division multiplexing (PC-OFDM yields lower maximum peak-to-average power ratio (PAR), high bandwidth efficiency and lower bit error rate (BER) on Gaussian channels compared to OFDM systems. However, PC-OFDM does not improve the statistics of PAR significantly. In this chapter, the use of a set of fixed permutations to improve the statistics of the PAR of a PC-OFDM signal is presented. For this technique, interleavers are used to produce K-1 permuted sequences from the same information sequence. The sequence with the lowest PAR, among K sequences is chosen for the transmission. The PAR of a PC-OFDM signal can be further reduced by 3-4 dB by this technique. Mathematical expressions for the complementary cumulative density function (CCDF)of PAR of PC-OFDM signal and interleaved PC-OFDM signal are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managing service quality is of primary importance for organizations that are increasingly service oriented, and offering a growing range of services to external and internal customers. Managing service quality requires the capacity to measure service quality, concomitantly requiring explicit conceptions of ‘service’ and ‘service quality’. This white-paper explores three keys areas of service and service marketing literature: service definition and conceptualisation, service classifications, and service quality models, and make the following observations and proposals.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chemical and physical restraints are frequently used in the intensive care unit (ICU) to control agitated patients and to prevent self-harm and unplanned extubations. Published work relating to the numerous issues of the care and treatment strategies for these patients remains conflicting and unclear. Literature regarding sedation and chemical restraint reveals a trend towards management with lighter sedation, use of sedation assessment tools and sedation protocols. It remains unclear which treatment is best for agitated and delirious patients, and the evidence on the effect of sedation is conflicting. A large portion of the literature on the use of physical restraint is from general hospital wards and residential homes, and not from the ICU environment. The purpose of this paper is to provide a summary of the existing literature on the use of physical and chemical restraints in the ICU setting. In Part 1 of this two-part paper, the evidence on chemical and physical restraints is explored with specific focus on definition of terms, unplanned

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An important goal of the care for the mechanically ventilated patient is to minimize patient discomfort and anxiety. This is partly achieved by frequent use of chemical and physical restraints. The majority of patients in intensive care will receive some form of sedation. The goal and use of sedation has changed considerably over the past few decades with literature evidencing trends toward overall lighter sedation levels and daily interruption of sedation. Conversely, the use of physical restraint for the ventilated patient in ICU differs considerably between nations and continents. A large portion of the literature on the use of physical restraint is from general hospital wards and residential homes, and not from the ICU environment. Recent literature suggests minimal use of physical restraint in the ICU, and that reduction programmes have been initiated. However, very few papers illuminate the patient's experience of physical and chemical restraints as a treatment strategy. In Part 1 of this two-part review, the evidence on chemical and physical restraints was explored with specific focus on definitions of terms, unplanned extubation, agitation, delirium as well as the impact of nurse–patient ratios in the ICU on these issues. This paper, Part 2, examines the evidence related to chemical and physical restraints from the mechanically ventilated patient's perspective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We propose a digital rights management approach for sharing electronic health records for research purposes and argue advantages of the approach. We give an outline of our implementation, discuss challenges that we faced and future directions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Not all companies in Australia are amenable to a winding up order pursuant to the Corporations Act 2001 (Cth). The Supreme Court of New South Wales has previously dealt with such winding up applications by apparently focusing on the inherent jurisdiction of the court to consider whether the court has jurisdiction to firstly consider the winding up application. This article proposes an original alternative paradigm: the plenary power provided to the court by s 23 of the Supreme Court Act 1970 (NSW) can be utilised to initially attract the jurisdiction of the court and subsequently the inherent jurisdiction specifically utilising the equitable “just and equitable” ground is available to the court to consider and make such a winding up order if appropriate. Variation of such a paradigm may also be available to the court when considering the inherent jurisdiction in relation to corporation matters more generally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Our objective was to determine the factors that lead users to continue working with process modeling grammars after their initial adoption. We examined the explanatory power of three theoretical models of IT usage by applying them to two popular process modeling grammars. We found that a hybrid model of technology acceptance and expectation-confirmation best explained user intentions to continue using the grammars. We examined differences in the model results, and used them to provide three contributions. First, the study confirmed the applicability of IT usage models to the domain of process modeling. Second, we discovered that differences in continued usage intentions depended on the grammar type instead of the user characteristics. Third, we suggest implications and practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fishers are faced with multiple risks, including unpredictability of future catch rates, prices and costs. While the latter are largely beyond the control of fisheries managers, effective fisheries management should reduce uncertainty about future catches. Different management instruments are likely to have different impacts on the risk perception of fishers, and this should manifest itself in their implicit discount rate. Assuming licence and quota values represent the net present value of the flow of expected future profits, then a proxy for the implicit discount rate of vessels in a fishery can be derived by the ratio of the average level of profits to the average licence/quota value. From this, an indication of the risk perception can be derived, assuming higher discount rates reflect higher levels of systematic risk. In this paper, we apply the capital asset pricing model (CAPM) to determine the risk premium implicit in the discount rates for a range of Australian fisheries, and compare this with the set of management instruments in place. We test the assumption that rights based management instruments lower perceptions of risk in fisheries. We find little evidence to support this assumption. although the analysis was based on only limited data.