1000 resultados para Petróleo - Transporte - Regulamentação
Resumo:
This scientific study deals about the oil and natural gas production participation payment impact in the county of Governador Dix-sept Rosado, Rio Grande do Norte, between 1998 to 2004, applied to family income and property. To do so, this analysis focus on the ricardian´s theory exposition which merges from the concept of the mineral income, in concern to the legal establishment of royalties. This paper also shows the world evolution oil exploration, inserting Brazil in this scene as a oil and natural gas producter. It identifies the productive site of oil and natural gas in Rio Grande do Norte as the Potiguar Oil Area, characterizing its components in the demographic, physical and social aspects, to reflect in the focus point of observation which is the Governador Dix-sept Rosado county. The participation payment on oil and natural gas is demonstrated in a qualitative analysis both in Brazil as in Rio Grande do Norte. The payments given to the land owners in this federative unity are shown in the period of analysis of this essay. The study tells, based in a field research, the benefaction impact of the payment to the land owners over the income and property. The family income were highly impacted, causing economic social classes change to some land owners. The property had less or none impact. It was found negative externalities as the income utilization to other county uses, not causing a multiplier effect in the studied county. The fact of the not utilization of the properties on productive investments in order to supply the finite characteristic of oil and this source of royalties, contradicts one of the reasons of its establishment which is the payment for its productive exhaustion of a land resource
Resumo:
A pesquisa analisa as possibilidades abertas pela exploração de petróleo na camada pré-sal, avaliando de que maneira a expansão do setor petrolífero poderá acelerar o crescimento econômico brasileiro e contribuir para novas estratégias de desenvolvimento. A hipótese inicial é que o Brasil enfrenta uma restrição estrutural de balanço de pagamentos, que poderá ser amenizada pela diminuição das importações de petróleo e derivados e pelo aumento do valor exportado no setor. Para avaliá-la são resgatados aspectos históricos e geopolíticos relacionados ao petróleo, assim como são tratadas as características microeconômicas dos recursos naturais não renováveis. Também se consideram questões de ordem macroeconômica, como a especialização produtiva da economia brasileira e sua inserção no comércio internacional, discutindo como o desenvolvimento da indústria petrolífera poderá afetá-las. Para tanto, a investigação fundamenta-se na teoria estruturalista e nos modelos de crescimento com ênfase na restrição externa. O trabalho examina ainda os casos da Rússia, Venezuela e México para avaliar a experiência de países exportadores de petróleo. Como contribuição, um modelo de crescimento é utilizado para realizar simulações acerca do Brasil, cobrindo o período 2013-2020 com a formulação de três cenários. A partir dos resultados discute-se que a necessidade de consecução das metas fiscal e de inflação pode desencadear políticas restritivas que limitam a utilização da folga fiscal e externa, oriundas do pré-sal, para induzir o crescimento. Conclui-se que um círculo virtuoso de desenvolvimento com mudança estrutural depende não apenas da modernização produtiva, mas também, e principalmente, da evolução político-institucional do país
Resumo:
Os objetivos do presente trabalho foram desenvolver rotina computacional para a solução da equação de Yalin e do diagrama de Shields e avaliar uma equação simplificada para modelar a capacidade de transporte de sedimento num Latossolo Vermelho Distrófico que possa ser utilizada no Water Erosion Prediction Project - WEPP, assim como em outros modelos de predição da erosão do solo. A capacidade de transporte de sedimento para o fluxo superficial foi representada como função-potência da tensão cisalhante, a qual revelou ser aproximação da equação de Yalin. Essa equação simplificada pôde ser aplicada em resultados experimentais oriundos de topografia complexa. A equação simplificada demonstrou acuracidade em relação à equação de Yalin, quando calibrada utilizando-se da tensão média cisalhante. Testes de validação com dados independentes demonstraram que a equação simplificada foi eficiente para estimar a capacidade de transporte de sedimento.
Resumo:
This master´s thesis presents a reliability study conducted among onshore oil fields in the Potiguar Basin (RN/CE) of Petrobras company, Brazil. The main study objective was to build a regression model to predict the risk of failures that impede production wells to function properly using the information of explanatory variables related to wells such as the elevation method, the amount of water produced in the well (BSW), the ratio gas-oil (RGO), the depth of the production bomb, the operational unit of the oil field, among others. The study was based on a retrospective sample of 603 oil columns from all that were functioning between 2000 and 2006. Statistical hypothesis tests under a Weibull regression model fitted to the failure data allowed the selection of some significant predictors in the set considered to explain the first failure time in the wells
Resumo:
The main goal of this dissertation is to develop a Multi Criteria Decision Aid Model to be used in Oils and Gas perforation rigs contracts choices. The developed model should permit the utilization of multiples criterions, covering problems that exist with models that mainly use the price of the contracts as its decision criterion. The AHP has been chosen because its large utilization, not only academic, but in many other areas, its simplicity of use and flexibility, and also fill all the requirements necessary to complete the task. The development of the model was conducted by interviews and surveys with one specialist in this specific area, who also acts as the main actor on the decision process. The final model consists in six criterions: Costs, mobility, automation, technical support, how fast the service could be concluded and availability to start the operations. Three rigs were chosen as possible solutions for the problem. The results reached by the utilizations of the model suggests that the utilization of AHP as a decision support system in this kind of situation is possible, allowing a simplifications of the problem, and also it s a useful tool to improve every one involved on the process s knowledge about the problem subject, and its possible solutions
Resumo:
This work has goal of analyzing the practices of Human Resources in the per missionary enterprises of urban transportation, by bus, in the metropolitan region of de Natal, based on the standard person of the National Program of Quality 2004 and points if they are able to take part as prize-winning in this standard. Also this work aims, through a theoretical evolution of people management and its current practices, the history of the National prize Quality and its main standards, the importance of the urban transportation, its characteristics and the system itself in the metropolitan region of Natal. The research was carried out in 11 enterprises that operated in the area, with several dimensions and forms of management. The research variations were based on the standard person of the 2004 NPQ that deals with the system of work, preparation and development and life quality. In the statistical treatment, discriminated and exploiting analyses were applied. The main obtained results through the research, we can verify an administrative centralization in managers and owners hands; that 45% of the enterprises don t have a Human Resources Department, however, on the other hand, they practice some human Resources politics, indicated by the variations; as to the items system of work, 55% of the enterprises are able; preparing and development, 43%
Resumo:
This work searches to offer a model to improve spare parts stock management for companies of urban passenger transport by bus, with the consequent progress in their maintenance management. Also known as MRO items (Maintenance, Repair and Operations), these spare parts, according their consumption and demand features, cost, criticity to operation, lead-time, quantity of suppliers, among other parameters, shouldn´t have managed their inventory like normal production items (work in process e final products), that because their features, are managed by more predictable models based, for example, in economic order quantity. In the case specifically of companies of urban passenger transport by bus, items MRO have significant importance in their assets and a bad management of these inventories can cause serious losses to company, leading it even bankrupticy business, in more severe situations which missing spare part provokes vehicles shutdown indefinitely. Given slight attention to the issue, which translates in little literature available about it when compared to that literature about normal items stocks, and due the fact that MRO items be critical to bus urban transport of passengers companies´, it is necessary, so, deepen in this theme searching to give technical and scientific subsidies to companies that work, in many times, empirically, with these so decisive inputs to their business. As a typical portfolio problem, in which there are n items, separated into critical and noncritical, while competing for the same resource, it was developed a new algorithm to aid in a better inventory management of spare parts used only in corrective maintenance (whose failures are unpredictable and random), by analyzing the cost-benefit ratio, which compares the level of service versus cost of each item. The model was tested in a company of urban passenger transport by bus from the city of Natal, who anonymously provided their real data to application in this work
Resumo:
Increased competition in the market of urban transport, characteristic of the Brazilian cities from years 90, has required actions of the managing agencies to ensure the universality of service, enhancing efficiency and consumer welfare. It grows in the Brazilian municipalities, the need to adopt a systematic performance evaluation in terms of management system of indicators and targets appropriate to the regulatory context, which has the purpose of evaluating the accomplishment and compliance by dealers, of the services granted during the contract period, marked by increasingly long periods. The introduction of an index operational performance in permission contracts/concession in urban buses is intended to establish a regulatory performance, giving the contract a pro-competitive feature and to allow the managing agency the systematic and continuous monitoring of the performance of the delegated service to avoid major deviations from desired performance. A performance assessment model of public transportation companies by bus, and applicable to the case of Natal is proposed. Sought to add the particularities found in the transport system in order to assess the performance of enterprises, contribute to improving the service quality to the population and enable decision-makers a detailed knowledge of the behavior of the licensees
Resumo:
This survey develops a study about the pro-environment behavior of a brazilian company of oil and gas sector, emphazing the Petróleo Brasileiro S/A PETROBRAS in its Unit of Business of Exploration and Production in the State of Rio Grande do Norte and Ceará − UN-RNCE. The work s development adopt the bibliographic research methodology with the descriptive exploratory analisys, with the purpouse of identifying related points with the knowledge and the analysed enterprise s staff conduct, by the aplication of the interview with a instrument of data colecting with closed variable questions from answers that varies from o to 10.The answers allowed us to know the employees knowledge about the related aspects of environmental responsability, knowing also the involvement of the employees with the politics of environmental managment that has been implemented in the operating area of the company. The research led us to an important verification of the pro-environmental behavior of the people interviewed. The results depends of a wise acting, not only inside the company, but also outside, where the results of this acting will be more perceived for the society. Finally, we conclude that the company has a politics of management with a great importance, emphasinzing that the employees are been in constant training about their behavior resulting in satisfaction
Resumo:
This work aims to "build" rostering urban bus crews to minimize the cost of overtime. For this purpose a mathematical model was developed based on case study in an urban transport company in the metropolitan region of Natal. This problem is usually known in the literature as the Crew Scheduling Problem (CSP) and classified as NP-hard. The mathematical programming takes into account constraints such as: completion of all trips, daily and maximum allowable range of home and / or food. We used the Xpress-MP software to implement and validate the proposed model. For the tested instances the application of the model allowed a reduction in overtime from 38% to 84%
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
Resumo:
The search for a sustainable development is result of the exhaustion of the natural resources of the planet that demands globalizated politics with practical of compatible economic development with the protection of the quality of life for the future generations. This work presents a study on the thematic on the environmental liabilities in the organizations with focus in the industry of the oil and the production of oil in land in the state of Rio Grande do Norte. Some types of environmental liabilities are presented, as well as, some estimates techniques. Moreover, this work presents surveys of some variable that stimulate the organizations to implant technologies of reduction of the impacts in the environment as: the environmental legislation, costs, the main impacts of the production of oil in land. On the basis of the bibliographical research and in the identified variable, it was carried a case study with state and municipal technician that act in the sectors of fiscalization (IBAMA-RN and IDEMA-RN) with the objective to deepen the discussion regarding the impacts of the industry of the oil, the effectiveness of the current law, the performance of the institutions the federal level and how to prevent impacts in the environment. It was observed that the environmental liabilities are a little spread subject in the organizations, perhaps to be unknown and of few theoretical referencees at the national level, regarding to the evaluation techniques. At the same time, absentee in the national politics that conducts the oil exploration
Resumo:
This thesis carries through an application of Analysis of Multicriterion Decision with use of the method of Analytical Hierarchy Process (AHP) in the problematic one of taking of decision of the adoption of electronic collecting in the system of urban transport in the country, a subject that has been controversial. A modeling of criteria and alternatives is carried through and applied a questionnaire based on method AHP the excellent actors in the system of urban transport - Leading of the Managing Agency Public Municipal theatre of Urban Transports, Controller of Company of Bus, Controller of Labor union, Controller of Union of Companies, Communitarian Leader. The considered alternatives were: the maintenance of the current state with collectors, the implementation of electronic collection without collectors, and the implementation of electronic collection with collectors. The used criteria were: job, impact in the fare, control of the system, easiness of use, information. The study was carried through in the city of Natal, RN, where if the adoption of electronic collection argues and where this implementation in some bus lines between Natal and Parnamirim exists, city that integrates the region of the great Natal. The main results of the method evidence in a dimension, the viability of use of method AHP with questionnaire by means of validation of the judgments with analysis of variance beyond proper the normal mechanisms of analysis of consistency to the method, and in another one, the contribution of the analysis boarding multicriterion to become the judgments more clearly. The main results of the analysis help to show that although to models of criteria and distinct judgments of the actors, the method evidenced that it has inclination the adoption of the electronic collection on the current situation, even so with divergences between the maintenance or not of the collector. The research points to the possibility of accomplishment of the application of the AHP in successive rounds of judgments
Resumo:
The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system
Resumo:
This work intends to analyze the behavior of the gas flow of plunger lift wells producing to well testing separators in offshore production platforms to aim a technical procedure to estimate the gas flow during the slug production period. The motivation for this work appeared from the expectation of some wells equipped with plunger lift method by PETROBRAS in Ubarana sea field located at Rio Grande do Norte State coast where the produced fluids measurement is made in well testing separators at the platform. The oil artificial lift method called plunger lift is used when the available energy of the reservoir is not high enough to overcome all the necessary load losses to lift the oil from the bottom of the well to the surface continuously. This method consists, basically, in one free piston acting as a mechanical interface between the formation gas and the produced liquids, greatly increasing the well s lifting efficiency. A pneumatic control valve is mounted at the flow line to control the cycles. When this valve opens, the plunger starts to move from the bottom to the surface of the well lifting all the oil and gas that are above it until to reach the well test separator where the fluids are measured. The well test separator is used to measure all the volumes produced by the well during a certain period of time called production test. In most cases, the separators are designed to measure stabilized flow, in other words, reasonably constant flow by the use of level and pressure electronic controllers (PLC) and by assumption of a steady pressure inside the separator. With plunger lift wells the liquid and gas flow at the surface are cyclical and unstable what causes the appearance of slugs inside the separator, mainly in the gas phase, because introduce significant errors in the measurement system (e.g.: overrange error). The flow gas analysis proposed in this work is based on two mathematical models used together: i) a plunger lift well model proposed by Baruzzi [1] with later modifications made by Bolonhini [2] to built a plunger lift simulator; ii) a two-phase separator model (gas + liquid) based from a three-phase separator model (gas + oil + water) proposed by Nunes [3]. Based on the models above and with field data collected from the well test separator of PUB-02 platform (Ubarana sea field) it was possible to demonstrate that the output gas flow of the separator can be estimate, with a reasonable precision, from the control signal of the Pressure Control Valve (PCV). Several models of the System Identification Toolbox from MATLAB® were analyzed to evaluate which one better fit to the data collected from the field. For validation of the models, it was used the AIC criterion, as well as a variant of the cross validation criterion. The ARX model performance was the best one to fit to the data and, this way, we decided to evaluate a recursive algorithm (RARX) also with real time data. The results were quite promising that indicating the viability to estimate the output gas flow rate from a plunger lift well producing to a well test separator, with the built-in information of the control signal to the PCV