994 resultados para barrier repair cost


Relevância:

20.00% 20.00%

Publicador:

Resumo:

An ideal substitute to treat a nerve gap has not been found. Initially, silicone conduits were employed. Later, conduits were fabricated from collagen or polyesters carbonates. More recently, it has been shown that a bioresorbable material, poly-3-hydroxybutyrate (PHB), can enhance nerve repair. The present investigation shows the use of fibrin as a conduit to guide nerve regeneration and bridge nerve defects. In this study we prepared and investigated a novel nerve conduit made from fibrin glue. Using a rodent sciatic nerve injury model (10-mm gap), we compared the extent of nerve regeneration through the new fibrin conduits versus established PHB conduits. After 2 and 4 weeks, conduits containing proximal and distal stumps were harvested. We evaluated the initial axon and Schwann cell stimulation using immunohistochemistry. The conduits presented full tissue integration and were completely intact. Axons crossed the gap after 1 month. Immunohistochemistry using the axonal marker PGP 9.5 showed a superior nerve regeneration distance in the fibrin conduit compared with PHB (4.1 mm versus 1.9 mm). Schwann cell intrusion (S100 staining) was similarly enhanced in the fibrin conduits, both from the proximal (4.2 mm versus 2.1 mm) and distal ends (3.2 mm versus 1.7 mm). These findings suggest an advantage of the new fibrin conduit for the important initial phase of peripheral nerve regeneration. The use of fibrin glue as a conduit is a step toward a usable graft to bridge peripheral nerve lesions. This might be clinically interesting, given the widespread acceptance of fibrin glue among the surgical community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES: The aims of this study were to assess the 1-year cost-effectiveness of a new combined immunosuppressive and anti-infectious regimen in kidney transplantation to prevent both rejection and infectious complications. METHODS: Patients (pts) transplanted from January 2000 to March 2003 (Group A) and treated with a conventional protocol were compared with pts submitted to a combined regimen including universal cytomegalovirus (CMV) prophylaxis between April 2003 and July 2005 (Group B). Costs were computed from the hospital accounting system for hospital stays, and official tariffs for outpatient visits. Patients with incomplete costs data were excluded from analysis. RESULTS: Fifty-three patients were analyzed in Group A, and 60 in Group B. Baseline characteristics including CMV serostatus were not significantly different between the two groups. Over 12 months after transplantation, acute rejections decreased from 41.5 percent in Group A to 6.7 percent in Group B (p < .001), and CMV infections from 47 percent to 15 percent (p < .001). Overall, readmissions decreased from 68 percent to 55 percent (p = .160), and average hospital days from 28 +/- 19 to 20 +/- 11 days (p < .007). The average number of outpatient visits decreased from 49 +/- 10 to 39 +/- 8 (p < .001). Average 1-year immunosuppressive and CMV prophylaxis costs (per patient) increased from CHF20,402 +/- 7,273 to 27,375 +/- 6,063 (p < .001), graft rejection costs decreased from CHF4,595 +/- 10,182 to 650 +/- 3,167 (p = .005), CMV treatment costs from CHF2,270 +/- 6,161 to 101 +/- 326 (p = .008), and outpatient visits costs from CHF8,466 +/- 1'721 to 6,749 +/- 1,159 (p < .001). Altogether, 1-year treatment costs decreased from CHF39'957 +/- 16,573 to 36,204 +/- 6,901 (p = .115). CONCLUSIONS: The new combined regimen administered in Group B was significantly more effective, and its additional costs were more than offset by savings associated with complications avoidance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To review the presentation and evaluation of laryngotracheoesophageal clefts as well as their treatment modalities, especially endoscopic closure. STUDY DESIGN: retrospective case series. METHODS: All patients treated for laryngotracheoesophageal clefts in our clinic during the last 15 years were included. Analysis of preoperative data, surgical success and functional outcome was performed. RESULTS: A total of 18 patients were included in our study. Cleft distribution was: type I (n=1), type II (n=3), type IIIa (n=5), type IIIb (n=8) and type IVa (n=1). All clefts were closed endoscopically by CO2 laser repair except for two patients who benfited from open surgery (one type I, one type IIIb). 7 of our 18 patients (39%) experienced a complication necessitating reoperation. Surgical treatment of LTEC allowed cessation of feeding tube assistance and artificial ventilation in 47% and 42% of patients respectively. CONCLUSION: Surgical treatement of laryngotracheoesophageal clefts remains a complex procedure with a high rate of morbidity for high grade clefts. Post-surgical difficulties in feeding and breathing are associated with concomitant congenital anomalies. Endoscopic repair is a successful technique for treating up to grade IIIa laryngeal clefts. Further investigation is needed to assess the best approach for treating longer clefts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyzes the possibilities of integrating cost information and engineering design. Special emphasis is put on finding the potential of using the activity-based costing (ABC) method. Today, the problem of cost estimation in engineering design is that there are two separate extremes of knowledge. On the one extreme, the engineers model the technical parametres behindcosts in great detail but do not get appropriate cost information to their elegant models. On the other extreme, the accounting professionals are stuck with traditional cost accounting methods driven by the procedures and cycles of financial accounting. Therefore, in many cases, the cost information needs of various decision making groups, for example design engineers, are not served satisfactorily. This paper studies if the activity-based costing (ABC) method could offer a compromise between the two extremes. Recognizing activities and activity chains as well as activity and cost drivers could be specially beneficial for design engineers. Also, recognizing the accurate and reliable product costs of existing products helps when doing variant design. However, ABC is not at its best if the cost system becomes too complicated. This is why a comprehensive ABC-cost information system with detailed cost information for the use of design engineers should be examined critically. ABC is at its best when considering such issues as which activities drive costs, the cost of product complexity, allocating indirect costs on the products, the relationships between processes and costs, and the cost of excess capacity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this study is to present an Activity-Based Costing spreadsheet tool for analyzing the logistics costs. The tool can be used both by customer-companies and logistics service providers. The study discusses the influence of different activity models on costs. Additionally this paper discusses about the logistical performance across the total supply chain This study is carried out using ananalytical research approach and literature material has been used for supplementing the concerned research approach. Cost structure analysis was based on the theory of activity-based management. This study was outlined to spare part logistics in machine-shop industry. The outlines of logistics services and logisticalperformance discussed in this report are based on the new logistics business concept (LMS-concept), which has been presented earlier in the Valssi-project. Oneof the aims of this study is to increase awareness of different activity modelson logistics costs. The report paints an overall picture about the business environment and requirements for the new logistics concept.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyzes the possibilities of integrating cost information and engineering design. Special emphasis is on finding the potential of using the activity-based costing (ABC) method when formulating cost information for the needs of design engineers. This paper suggests that ABC is more useful than the traditional job order costing, but the negative issue is the fact that ABC models become easily too complicated, i.e. expensive to build and maintain, and difficult to use. For engineering design the most suitable elements of ABC are recognizing activities of the company, constructing acitivity chains, identifying resources, activity and cost drivers, as wellas calculating accurate product costs. ABC systems including numerous cost drivers can become complex. Therefore, a comprehensive ABC based cost information system for the use of design engineers should be considered criticaly. Combining the suitable ideas of ABC with engineering oriented thinking could give competentresults.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este trabalho foi realizado com o objetivo de estabelecer a melhor concentração de sais do meio MS e da citocinina BAP para a multiplicação dos porta-enxertos de Prunus sp. 'Barrier' e 'Cadaman'. Segmentos nodais foram introduzidos em tubos de ensaio contendo 10 mL de meio de cultura com variações na concentração de sais (MS; ½MS; e 2/3MS) combinadas com cinco concentrações de BAP (0; 1,5; 2,5; 3,5 e 4,5 miM). Utilizou-se um fatorial 2x3x5, distribuído em blocos casualizados, compostos por quatro repetições contendo cinco tubos de ensaio cada uma, sendo inoculado um segmento nodal por tubo. As avaliações foram realizadas após cinco semanas de cultivo em ambiente com intensidade luminosa de 20 miE m-2 s-1, fotoperíodo de 16 horas e temperatura de 24 ± 4ºC. Verificou-se maior número médio de gemas e de brotações para a cultivar Barrier. À medida que se reduziu a concentração de sais do meio de cultura, obteve-se maior número de brotações, porém com menor tamanho. As regressões polinomiais das variáveis número de gemas, brotações por explante e comprimento das brotações apresentaram um ajustamento quadrático para níveis de BAP, atingindo os pontos de máximo 31,2 gemas/explante; 4,6 brotações por explante, e 8,1 mm de comprimento nas concentrações 3,3; 3,1, e 3,1 miM de BAP, respectivamente.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this thesis is to analyse activity-based costing (ABC) and possible modified versions ofit in engineering design context. The design engineers need cost information attheir decision-making level and the cost information should also have a strong future orientation. These demands are high because traditional management accounting has concentrated on the direct actual costs of the products. However, cost accounting has progressed as ABC was introduced late 1980s and adopted widely bycompanies in the 1990s. The ABC has been a success, but it has gained also criticism. In some cases the ambitious ABC systems have become too complex to build,use and update. This study can be called an action-oriented case study with some normative features. In this thesis theoretical concepts are assessed and allowed to unfold gradually through interaction with data from three cases. The theoretical starting points are ABC and theory of engineering design process (chapter2). Concepts and research results from these theoretical approaches are summarized in two hypotheses (chapter 2.3). The hypotheses are analysed with two cases (chapter 3). After the two case analyses, the ABC part is extended to cover alsoother modern cost accounting methods, e.g. process costing and feature costing (chapter 4.1). The ideas from this second theoretical part are operationalized with the third case (chapter 4.2). The knowledge from the theory and three cases is summarized in the created framework (chapter 4.3). With the created frameworkit is possible to analyse ABC and its modifications in the engineering design context. The framework collects the factors that guide the choice of the costing method to be used in engineering design. It also illuminates the contents of various ABC-related costing methods. However, the framework needs to be further tested. On the basis of the three cases it can be said that ABC should be used cautiously when formulating cost information for engineering design. It is suitable when the manufacturing can be considered simple, or when the design engineers are not cost conscious, and in the beginning of the design process when doing adaptive or variant design. If the design engineers need cost information for the embodiment or detailed design, or if manufacturing can be considered complex, or when design engineers are cost conscious, the ABC has to be always evaluated critically.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is generally accepted that between 70 and 80% of manufacturing costs can be attributed to design. Nevertheless, it is difficult for the designer to estimate manufacturing costs accurately, especially when alternative constructions are compared at the conceptual design phase, because of the lack of cost information and appropriate tools. In general, previous reports concerning optimisation of a welded structure have used the mass of the product as the basis for the cost comparison. However, it can easily be shown using a simple example that the use of product mass as the sole manufacturing cost estimator is unsatisfactory. This study describes a method of formulating welding time models for cost calculation, and presents the results of the models for particular sections, based on typical costs in Finland. This was achieved by collecting information concerning welded products from different companies. The data included 71 different welded assemblies taken from the mechanical engineering and construction industries. The welded assemblies contained in total 1 589 welded parts, 4 257 separate welds, and a total welded length of 3 188 metres. The data were modelled for statistical calculations, and models of welding time were derived by using linear regression analysis. Themodels were tested by using appropriate statistical methods, and were found to be accurate. General welding time models have been developed, valid for welding in Finland, as well as specific, more accurate models for particular companies. The models are presented in such a form that they can be used easily by a designer, enabling the cost calculation to be automated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Finland has large forest fuel resources. However, the use of forest fuels for energy production has been low, except for small-scale use in heating. According to national action plans and programs related to wood energy promotion, the utilization of such resources will be multiplied over the next few years. The most significant part of this growth will be based on the utilization of forest fuels, produced from logging residues of regeneration fellings, in industrial and municipal power and heating plants. Availability of logging residues was analyzed by means of resource and demand approaches in order to identify the most suitable regions with focus on increasing the forest fuel usage. The analysis included availability and supply cost comparisons between power plant sites and resource allocation in a least cost manner, and between a predefined power plant structure under demand and supply constraints. Spatial analysis of worksite factors and regional geographies were carried out using the GIS-model environment via geoprocessing and cartographic modeling tools. According to the results of analyses, the cost competitiveness of forest fuel supply should be improved in order to achieve the designed objectives in the near future. Availability and supply costs of forest fuels varied spatially and were very sensitive to worksite factors and transport distances. According to the site-specific analysis the supply potential between differentlocations can be multifold. However, due to technical and economical reasons ofthe fuel supply and dense power plant infrastructure, the supply potential is limited at plant level. Therefore, the potential and supply cost calculations aredepending on site-specific matters, where regional characteristics of resourcesand infrastructure should be taken into consideration, for example by using a GIS-modeling approach constructed in this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Breast cancer (BC) causes more deaths than any other cancer among women in Catalonia. Early detection has contributed to the observed decline in BC mortality. However, there is debate on the optimal screening strategy. We performed an economic evaluation of 20 screening strategies taking into account the cost over time of screening and subsequent medical costs, including diagnostic confirmation, initial treatment, follow-up and advanced care. Methods: We used a probabilistic model to estimate the effect and costs over time of each scenario. The effect was measured as years of life (YL), quality-adjusted life years (QALY), and lives extended (LE). Costs of screening and treatment were obtained from the Early Detection Program and hospital databases of the IMAS-Hospital del Mar in Barcelona. The incremental cost-effectiveness ratio (ICER) was used to compare the relative costs and outcomes of different scenarios. Results: Strategies that start at ages 40 or 45 and end at 69 predominate when the effect is measured as YL or QALYs. Biennial strategies 50-69, 45-69 or annual 45-69, 40-69 and 40-74 were selected as cost-effective for both effect measures (YL or QALYs). The ICER increases considerably when moving from biennial to annual scenarios. Moving from no screening to biennial 50-69 years represented an ICER of 4,469€ per QALY. Conclusions: A reduced number of screening strategies have been selected for consideration by researchers, decision makers and policy planners. Mathematical models are useful to assess the impact and costs of BC screening in a specific geographical area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Helminth parasites can cause considerable damage when migrating through host tissues, thus making rapid tissue repair imperative to prevent bleeding and bacterial dissemination particularly during enteric infection. However, how protective type 2 responses targeted against these tissue-disruptive multicellular parasites might contribute to homeostatic wound healing in the intestine has remained unclear. Here, we observed that mice lacking antibodies (Aid-/-) or activating Fc receptors (Fcrg-/-) displayed impaired intestinal repair following infection with the murine helminth Heligmosomoides polygyrus bakeri (Hpb), whilst transfer of immune serum could partially restore chemokine production and rescue wound healing in Aid-/- mice. Impaired healing was associated with a reduced expression of CXCR2 ligands (CXCL2/3) by macrophages (MΦ) and myofibroblasts (MF) within intestinal lesions. Whilst antibodies and helminths together triggered CXCL2 production by MΦ in vitro via surface FcR engagement, chemokine secretion by intestinal MF was elicited by helminths directly via Fcrg-chain/dectin2 signaling. Blockade of CXCR2 during Hpb challenge infection reproduced the delayed wound repair observed in helminth infected Aid-/- and Fcrg-/- mice. Finally, conditioned media from human MΦ stimulated with infective larvae of the helminth Ascaris suum together with immune serum, promoted CXCR2-dependent scratch wound closure by human MF in vitro. Collectively our findings suggest that helminths and antibodies instruct a chemokine driven MΦ-MF crosstalk to promote intestinal repair, a capacity that may be harnessed in clinical settings of impaired wound healing.