964 resultados para Jersey (Prison-ship)
Resumo:
Report year ends June 30.
Resumo:
"July, 1993."
Resumo:
Description based on: 1985; title from cover.
Resumo:
Submitted pursuant to 42 U.S.C. 4332(2)(c) by the U.S. Dept. of Transportation, Federal Highway Administration and Illinois Dept. of Transportation.
Resumo:
Pamphlet is in a question answer format.
Resumo:
"31642"--Colophon.
Resumo:
Mode of access: Internet.
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
"September 2003."
Resumo:
"Foster's report"--Spine.
Resumo:
Includes index.
Resumo:
Bradford was warden of the Massachusetts State Prison from 1813 until his death.
Resumo:
Includes bibliographical references.
Resumo:
In Phillips, Richard. New voyages and travels. London, 1819-23. Vol. IV, no. 6.
Resumo:
"List of vessels engaged in the slave trade captured by the British Squadron employed on the western coast of Africa, in the year 1829": p. [268-271]