910 resultados para uniform energy distribution


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent changes in the operation and planning of power systems have been motivated by the introduction of Distributed Generation (DG) and Demand Response (DR) in the competitive electricity markets' environment, with deep concerns at the efficiency level. In this context, grid operators, market operators, utilities and consumers must adopt strategies and methods to take full advantage of demand response and distributed generation. This requires that all the involved players consider all the market opportunities, as the case of energy and reserve components of electricity markets. The present paper proposes a methodology which considers the joint dispatch of demand response and distributed generation in the context of a distribution network operated by a virtual power player. The resources' participation can be performed in both energy and reserve contexts. This methodology contemplates the probability of actually using the reserve and the distribution network constraints. Its application is illustrated in this paper using a 32-bus distribution network with 66 DG units and 218 consumers classified into 6 types of consumers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The smart grid concept is a key issue in the future power systems, namely at the distribution level, with deep concerns in the operation and planning of these systems. Several advantages and benefits for both technical and economic operation of the power system and of the electricity markets are recognized. The increasing integration of demand response and distributed generation resources, all of them mostly with small scale distributed characteristics, leads to the need of aggregating entities such as Virtual Power Players. The operation business models become more complex in the context of smart grid operation. Computational intelligence methods can be used to give a suitable solution for the resources scheduling problem considering the time constraints. This paper proposes a methodology for a joint dispatch of demand response and distributed generation to provide energy and reserve by a virtual power player that operates a distribution network. The optimal schedule minimizes the operation costs and it is obtained using a particle swarm optimization approach, which is compared with a deterministic approach used as reference methodology. The proposed method is applied to a 33-bus distribution network with 32 medium voltage consumers and 66 distributed generation units.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The power systems operation in the smart grid context increases significantly the complexity of their management. New approaches for ancillary services procurement are essential to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. These approaches should include market mechanisms which allow the participation of small and medium distributed energy resources players in a competitive market environment. In this paper, an energy and ancillary services joint market model used by an aggregator is proposed, considering bids of several types of distributed energy resources. In order to improve economic efficiency in the market, ancillary services cascading market mechanism is also considered in the model. The proposed model is included in MASCEM – a multi-agent system electricity market simulator. A case study considering a distribution network with high penetration of distributed energy resources is presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a methodology to increase the probability of delivering power to any load point through the identification of new investments. The methodology uses a fuzzy set approach to model the uncertainty of outage parameters, load and generation. A DC fuzzy multicriteria optimization model considering the Pareto front and based on mixed integer non-linear optimization programming is developed in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power to all customers in the distribution network at the minimum possible cost for the system operator, while minimizing the non supplied energy cost. To illustrate the application of the proposed methodology, the paper includes a case study which considers an 33 bus distribution network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A methodology to increase the probability of delivering power to any load point through the identification of new investments in distribution network components is proposed in this paper. The method minimizes the investment cost as well as the cost of energy not supplied in the network. A DC optimization model based on mixed integer non-linear programming is developed considering the Pareto front technique in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power for any customer in the distribution system at the minimum possible cost for the system operator, while minimizing the energy not supplied cost. Thus, a multi-objective problem is formulated. To illustrate the application of the proposed methodology, the paper includes a case study which considers a 180 bus distribution network

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, such as the use of more distributed generators and electric vehicles connected to the distribution network. This paper proposes a methodology to be used by Virtual Power Players (VPPs), regarding the energy resource scheduling in smart grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gradually smart grids and smart meters are closer to the home consumers. Several countries has developed studies focused in the impacts arising from the introduction of these technologies and one of the main advantages are related to energy efficiency, observed through the awareness of the population on behalf of a more efficient consumption. These benefits are felt directly by consumers through the savings on electricity bills and also by the concessionaires through the minimization of losses in transmission and distribution, system stability, smaller loading during peak hours, among others. In this article two projects that demonstrate the potential energy savings through smart meters and smart grids are presented. The first performed in Korea, focusing on the installation of smart meters and the impact of use of user interfaces. The second performed in Portugal, focusing on the control of loads in a residence with distributed generation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and of massive electric vehicle is envisaged. The present paper proposes a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and Vehicle-to-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with their owners. It takes into account these contracts, the users' requirements subjected to the VPP, and several discharge price steps. The full AC power flow calculation included in the model takes into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33-bus distribution network and V2G is used to illustrate the good performance of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The determination of characteristic cardiac parameters, such as displacement, stress and strain distribution are essential for an understanding of the mechanics of the heart. The calculation of these parameters has been limited until recently by the use of idealised mathematical representations of biventricular geometries and by applying simple material laws. On the basis of 20 short axis heart slices and in consideration of linear and nonlinear material behaviour we have developed a FE model with about 100,000 degrees of freedom. Marching Cubes and Phong's incremental shading technique were used to visualise the three dimensional geometry. In a quasistatic FE analysis continuous distribution of regional stress and strain corresponding to the endsystolic state were calculated. Substantial regional variation of the Von Mises stress and the total strain energy were observed at all levels of the heart model. The results of both the linear elastic model and the model with a nonlinear material description (Mooney-Rivlin) were compared. While the stress distribution and peak stress values were found to be comparable, the displacement vectors obtained with the nonlinear model were generally higher in comparison with the linear elastic case indicating the need to include nonlinear effects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The research towards efficient, reliable and environmental-friendly power supply solutions is producing growing interest to the “Smart Grid” approach for the development of the electricity networks and managing the increasing energy consumption. One of the novel approaches is an LVDC microgrid. The purpose of the research is to analyze the possibilities for the implementation of LVDC microgrids in public distribution networks in Russia. The research contains the analysis of the modern Russian electric power industry, electricity market, electricity distribution business, regulatory framework and standardization, related to the implementation of LVDC microgrid concept. For the purpose of the economic feasibility estimation, a theoretical case study for comparing low voltage AC and medium voltage AC with LVDC microgrid solutions for a small settlement in Russia is presented. The results of the market and regulatory framework analysis along with the economic comparison of AC and DC solutions show that implementation of the LVDC microgrid concept in Russia is possible and can be economically feasible. From the electric power industry and regulatory framework point of view, there are no serious obstacles for the LVDC microgrids in Russian distribution networks. However, the most suitable use cases at the moment are expected to be found in the electrification of remote settlements, which are isolated from the Unified Energy System of Russia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nous avons observé une augmentation ‘’transient’’du taux de cristallisation interfacique de l’a-Si lorsqu’on réimplante du Si à proximité de l’interface amorphe/cristal. Après amorphisation et traitement thermique à 650°C pendant 5s de la couche a-Si crée par implantation ionique, une partie a été réimplantée. Les défauts produits par auto-réimplantation à 0.7MeV se trouvent à (302±9) nm de l’interface initiale. Cela nous a permis d’étudier d’avantage la variation initiale de la vitesse SPE (Épitaxie en phase solide). Avec des recuit identiques de 4h à 500°C, nous avons déterminé les positions successives des interfaces et en déduit les taux de cristallisation SPE. La cristallisation débute à l’interface et continue graduellement vers la surface. Après le premier recuit, (252±11) nm s’est recristallisé dans la zone réimplantée soit un avancement SPE de 1.26x10^18at./cm2. Cette valeur est environ 1.50 fois plus importante que celle dans l’état relaxé. Nous suggérons que la présence de défauts à proximité de l’interface a stimulé la vitesse initiale. Avec le nombre de recuit, l’écart entre les vitesses diminue, les deux régions se cristallisent presque à la même vitesse. Les mesures Raman prises avant le SPE et après chaque recuit ont permis de quantifier l’état de relaxation de l’a-Si et le transfert de l’état dé-relaxé à relaxé.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An attempt is made to determine the relative power distribution in a step-index parabolic cylindrical waveguide (PCW) with high deformation across the direction of propagation. The guide is assumed to be made of silica. The scalar field approximation is employed for the analysis under which a vanishing refractive-index (RI) difference in the waveguide materials is considered. Further, no approximation for folds- is used in the analytical treatment. Due to the geometry of such waceguides, PCWs lose the well-defined modal discreteness, and a kind of mode bunching is observed instead, which becomes much more prominent in PCWs with high bends. However, with the increase in cross-sectional size, the mode-bunching tendency is slightly reduced. The general expressions for power in the guiding and nonguiding sections are obtained, and the fractional power patterns in all of the sections are presented for PCWs of various cross-sectional dimensions. It is observed that the confinement of power in the core section is increased for PCWs of larger cross-sectional size. Moreover, a fairly uniform distribution of power is seen over the modes having intermediate values of propagation constants

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Time resolved optical emission spectroscopy is employed to study the expansion dynamics of C2 species in a graphite plasma produced during the Nd : YAG ablation. At low laser fluences a single peak distribution with low kinetic energy is observed. At higher fluences a twin peak distribution is found. It has been noted that these double peak time of flight distribution splits into a triple peak structure at distances >_ 17mm from the target surface. The reason for the occurrence of multiple peak is due to different formation mechanisms of C2 species