858 resultados para product lifecycle management
Resumo:
As user involvement becomes a necessary part of the product development process, various ways of accessing users' latent needs have been developed and studied. Reviews of literatures in user involvement and product development have revealed that accessing users' latent needs and transferring them into design process could be facilitated by effectively implementing user-designer collaboration during the early stage of the design process. In this paper, various types of user-designer collaboration were observed and then distinct characteristics of user-designer collaboration were classified into three categories. 1) Passive objectivity, 2) workplace democratisation, and 3) shared contexts were observed as strategies for better user-designer collaboration, which have been employed in the area of user-centred design, user participatory design and design for experiencing. Based on the literature review, this paper proposed a basic collaboration mechanism between the users and the designers during the early stage of the design process and then discussed how its mechanism will help to describe the interactions between the users and the designers during the user involvement sessions.
Resumo:
These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.
Resumo:
These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.
Resumo:
Polybrominated diphenyl ethers (PBDEs) are lipophilic, persistent pollutants found worldwide in environmental and human samples. Exposure pathways for PBDEs remain unclear but may include food, air and dust. The aim of this study was to conduct an integrated assessment of PBDE exposure and human body burden using 10 matched samples of human milk, indoor air and dust collected in 2007–2008 in Brisbane, Australia. In addition, temporal analysis was investigated comparing the results of the current study with PBDE concentrations in human milk collected in 2002–2003 from the same region. PBDEs were detected in all matrices and the median concentrations of BDEs -47 and -209 in human milk, air and dust were: 4.2 and 0.3 ng/g lipid; 25 and 7.8 pg/m3; and 56 and 291 ng/g dust, respectively. Significant correlations were observed between the concentrations of BDE-99 in air and human milk (r = 0.661, p = 0.038) and BDE-153 in dust and BDE-183 in human milk (r = 0.697, p = 0.025). These correlations do not suggest causal relationships — there is no hypothesis that can be offered to explain why BDE-153 in dust and BDE-183 in milk are correlated. The fact that so few correlations were found in the data could be a function of the small sample size, or because additional factors, such as sources of exposure not considered or measured in the study, might be important in explaining exposure to PBDEs. There was a slight decrease in PBDE concentrations from 2002–2003 to 2007–2008 but this may be due to sampling and analytical differences. Overall, average PBDE concentrations from these individual samples were similar to results from pooled human milk collected in Brisbane in 2002–2003 indicating that pooling may be an efficient, cost-effective strategy of assessing PBDE concentrations on a population basis. The results of this study were used to estimate an infant's daily PBDE intake via inhalation, dust ingestion and human milk consumption. Differences in PBDE intake of individual congeners from the different matrices were observed. Specifically, as the level of bromination increased, the contribution of PBDE intake decreased via human milk and increased via dust. As the impacts of the ban of the lower brominated (penta- and octa-BDE) products become evident, an increased use of the higher brominated deca-BDE product may result in dust making a greater contribution to infant exposure than it does currently. To better understand human body burden, further research is required into the sources and exposure pathways of PBDEs and metabolic differences influencing an individual's response to exposure. In addition, temporal trend analysis is necessary with continued monitoring of PBDEs in the human population as well as in the suggested exposure matrices of food, dust and air.
Resumo:
With the increasing growth of cultural events both in Australia and internationally, there has also been an increase in event management studies; in theory and in practice. Although a series of related knowledge and skills required specifically by event managers has already been identified by many researchers (Perry et al., 1996; Getz, 2002 & Silvers et al., 2006) and generic event management models proposed, including ‘project management’ strategies in an event context (Getz, 2007), knowledge gaps still exist in relation to identifying specific types of events, especially for not-for-profit arts events. For events of a largely voluntary nature, insufficient resources are recognised as the most challenging; including finance, human resources and infrastructure. Therefore, the concepts and principles which are adopted by large scale commercial events may not be suitable for not-for-profit arts events aiming at providing professional network opportunities for artists. Building partnerships are identified as a key strategy in developing an effective event management model for this type of event. Using the 2008 World Dance Alliance Global Summit (WDAGS) in Brisbane 13-18 July, as a case study, the level, nature and relationship of key partners are investigated. Data is triangulated from interviews with organisers of the 2008 WDAGS, on-line and email surveys of delegates, participant observation and analysis of formal and informal documents, to produce a management model suited to this kind of event.
Resumo:
Substance misuse in individuals with schizophrenia is very common, especially in young men, in communities where use is frequent and in people receiving inpatient treatment. Problematic use occurs at very low intake levels, so that most affected people are not physically dependent (with the exception of nicotine). People with schizophrenia and substance misuse have poorer symptomatic and functional outcomes than those with schizophrenia alone. Unless there is routine screening, substance misuse is often missed in assessments. Service systems tend to be separated, with poor inter-communication, and affected patients are often excluded from services because of their comorbidity. However, effective management of these disorders requires a fully integrated approach because of the close inter-relationship of the disorders. Use of atypical antipsychotics may be especially important in this population because of growing evidence (especially on clozapine and risperidone) that nicotine smoking, alcohol misuse and possibly some other substance misuse is reduced. Several pharmacotherapies for substance misuse can be used safely in people with schizophrenia, but the evidence base is small and guidelines for their use are necessarily derived from experience in the general population.
Resumo:
Business Process Management (BPM) has emerged as a popular management approach in both Information Technology (IT) and management practice. While there has been much research on business process modelling and the BPM life cycle, there has been little attention given to managing the quality of a business process during its life cycle. This study addresses this gap by providing a framework for organisations to manage the quality of business processes during different phases of the BPM life cycle. This study employs a multi-method research design which is based on the design science approach and the action research methodology. During the design science phase, the artifacts to model a quality-aware business process were developed. These artifacts were then evaluated through three cycles of action research which were conducted within three large Australian-based organisations. This study contributes to the body of BPM knowledge in a number of ways. Firstly, it presents a quality-aware BPM life cycle that provides a framework on how quality can be incorporated into a business process and subsequently managed during the BPM life cycle. Secondly, it provides a framework to capture and model quality requirements of a business process as a set of measurable elements that can be incorporated into the business process model. Finally, it proposes a novel root cause analysis technique for determining the causes of quality issues within business processes.