978 resultados para Power resources


Relevância:

20.00% 20.00%

Publicador:

Resumo:

12th European Conference on Wireless Sensor Networks (EWSN 2015). 9 to 11, Feb, 2015. Porto, Portugal

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, three approaches for the assessment of credibility in a web environment will be presented, namely the checklists model, the cognitive authority model and the contextual model. This theoretical framework was used to conduct a study about the assessment of web resources credibility among a sample of 195 students, from elementary and secondary schools in a municipality in Oporto district (Portugal). The practices that young people and children claim to use regarding the use of criteria for web resources selection will be presented. In addition, these results will be discussed and compared with the perceptions that these respondents have demonstrated for the use of criteria to establish or assess authorship, originality, or information resources structure. These results will be also discussed and compared with the perceptions that these respondents have demonstrated for the elements that make up each of these criteria.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

First IFAC Workshop on Fractional Differentiation and Its Application - 19-21 July 2004, Enseirb, Bordeaux, France - FDA'04

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports investigation on the estimation of the short circuit impedance of power transformers, using fractional order calculus to analytically study the influence of the diffusion phenomena in the windings. The aim is to better characterize the medium frequency range behavior of leakage inductances of power transformer models, which include terms to represent the magnetic field diffusion process in the windings. Comparisons between calculated and measured values are shown and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consumer-electronics systems are becoming increasingly complex as the number of integrated applications is growing. Some of these applications have real-time requirements, while other non-real-time applications only require good average performance. For cost-efficient design, contemporary platforms feature an increasing number of cores that share resources, such as memories and interconnects. However, resource sharing causes contention that must be resolved by a resource arbiter, such as Time-Division Multiplexing. A key challenge is to configure this arbiter to satisfy the bandwidth and latency requirements of the real-time applications, while maximizing the slack capacity to improve performance of their non-real-time counterparts. As this configuration problem is NP-hard, a sophisticated automated configuration method is required to avoid negatively impacting design time. The main contributions of this article are: 1) An optimal approach that takes an existing integer linear programming (ILP) model addressing the problem and wraps it in a branch-and-price framework to improve scalability. 2) A faster heuristic algorithm that typically provides near-optimal solutions. 3) An experimental evaluation that quantitatively compares the branch-and-price approach to the previously formulated ILP model and the proposed heuristic. 4) A case study of an HD video and graphics processing system that demonstrates the practical applicability of the approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A presente dissertação insere-se no âmbito da unidade curricular de “Dissertação/Projeto/Estágio”, do 2º ano do mestrado em Engenharia Eletrotécnica – Sistemas Elétricos de Energia. Com o crescente aumento do consumo energético a nível mundial, e consequente esgotamento dos recursos fósseis, surge a necessidade de procurar soluções alternativas para a produção de energia. As energias renováveis aparecem como uma solução sustentável na produção de eletricidade, pois a sua produção representa um menor custo. Este trabalho tem como principais objetivos o dimensionamento de uma central de produção fotovoltaica para o ISEP nos regimes de exploração em autoconsumo e pequena produção, tendo em conta o atual Decreto-Lei (DL) n.º 153/2014, e também a análise de viabilidade económica dessa mesma instalação. O sistema fotovoltaico usado no dimensionamento em autoconsumo e pequena produção foi realizado com recurso ao software PVsyst. Tendo em conta que os consumos do ISEP são bastante inferiores nos períodos de férias escolares e fins-de-semana, e também por haver uma limitação de área disponível para a colocação dos módulos fotovoltaicos, a melhor opção a adotar será um sistema fotovoltaico de 237 kWp, tanto para autoconsumo como para pequena produção. Outro objetivo é a realização de um estudo de viabilidade económica do sistema fotovoltaico dimensionado. Os resultados obtidos permitem então clarificar qual dos regimes de exploração é mais viável para o ISEP, sendo que esses resultados poderão servir de apoio a uma futura decisão, caso o ISEP decida instalar um sistema deste tipo.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we apply the following four power indices to the Portuguese Parliament: Shapley–Shubik index, Banzhaf index, Deegan–Packel index and Public Good Index. We also present the main notions related with simple games and discuss the features of each power index by means of their axiomatic characterizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the traditional paradigm, the large power plants supply the reactive power required at a transmission level and the capacitors and transformer tap changer were also used at a distribution level. However, in a near future will be necessary to schedule both active and reactive power at a distribution level, due to the high number of resources connected in distribution levels. This paper proposes a new multi-objective methodology to deal with the optimal resource scheduling considering the distributed generation, electric vehicles and capacitor banks for the joint active and reactive power scheduling. The proposed methodology considers the minimization of the cost (economic perspective) of all distributed resources, and the minimization of the voltage magnitude difference (technical perspective) in all buses. The Pareto front is determined and a fuzzy-based mechanism is applied to present the best compromise solution. The proposed methodology has been tested in the 33-bus distribution network. The case study shows the results of three different scenarios for the economic, technical, and multi-objective perspectives, and the results demonstrated the importance of incorporating the reactive scheduling in the distribution network using the multi-objective perspective to obtain the best compromise solution for the economic and technical perspectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho de projecto apresentado como requisito parcial para obtenção do grau de Mestre em Ciência e Sistemas de Informação Geográfica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Further improvements in demand response programs implementation are needed in order to take full advantage of this resource, namely for the participation in energy and reserve market products, requiring adequate aggregation and remuneration of small size resources. The present paper focuses on SPIDER, a demand response simulation that has been improved in order to simulate demand response, including realistic power system simulation. For illustration of the simulator’s capabilities, the present paper is proposes a methodology focusing on the aggregation of consumers and generators, providing adequate tolls for the demand response program’s adoption by evolved players. The methodology proposed in the present paper focuses on a Virtual Power Player that manages and aggregates the available demand response and distributed generation resources in order to satisfy the required electrical energy demand and reserve. The aggregation of resources is addressed by the use of clustering algorithms, and operation costs for the VPP are minimized. The presented case study is based on a set of 32 consumers and 66 distributed generation units, running on 180 distinct operation scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study proposes a new methodology to increase the power delivered to any load point in a radial distribution network, through the identification of new investments in order to improve the repair time. This research work is innovative and consists in proposing a full optimisation model based on mixed-integer non-linear programming considering the Pareto front technique. The goal is to achieve a reduction in repair times of the distribution networks components, while minimising the costs of that reduction as well as non-supplied energy costs. The optimisation model considers the distribution network technical constraints, the substation transformer taps, and it is able to choose the capacitor banks size. A case study based on a 33-bus distribution network is presented in order to illustrate in detail the application of the proposed methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O âmbito deste trabalho envolve o teste do modelo BIM numa obra em construção pela Mota-Engil – Engenharia, na extração experimental de peças desenhadas de preparação e apoio à execução de obra. No capítulo 1 deste relatório são definidos o âmbito e os objetivos deste trabalho, é feito um enquadramento histórico do tema e abordados conceitos e atividades da preparação de obra, na sua forma tradicional. O estado do conhecimento da preparação de obras e mais em concreto da tecnologia BIM a nível nacional e internacional é abordado no capítulo 2. Nesse sentido procura-se definir os conceitos principais inerentes a esta nova metodologia, que passa por identificar e caraterizar a tecnologia envolvida e o seu nível de desenvolvimento. Com suporte em casos práticos de preparação de obra na sua forma tradicional, identificados e desenvolvidos no capítulo 3, foi compilado um processo tipo de peças desenhadas de suporte identificadas e caracterizadas no capítulo 4, frequentes e comuns à execução de diversos tipos de obras de edifícios. Assente na compilação baseada em casos práticos e no estudo do projeto de execução da empreitada que sustenta o presente trabalho, com base no qual o modelo BIM foi concebido, identificou-se um conjunto de peças desenhadas de preparação e apoio à execução dos trabalhos, em 2D, a extrair do modelo. No capítulo 5, é feita uma descrição do modo como foi estudado o projeto da obra, com evidência para os fatores mais relevantes, especificando os desenhos a extrair. Suportada pelo programa de modelação ArchiCAD, a extração do conjunto de desenhos identificados anteriormente foi conseguida com recurso às funcionalidades disponíveis no software, que permite a criação de desenhos 2D atualizáveis ou não automaticamente a partir do modelo. Qualquer alteração introduzida no modelo virtual é automaticamente atualizada nos desenhos bidimensionais, caso o utilizador assim o pretenda. Ao longo desse trabalho foram detetados e analisados os condicionalismos inerentes ao processo de extração, referidos no capítulo 6, para estabelecimento de regras de modelação padrão a adotar em futuras empreitadas, que possam simplificar a obtenção dos elementos desenhados de preparação necessários à sua execução. No ponto 6.3 são identificadas melhorias a introduzir no modelo. Em conclusão no capítulo 7 são abordadas especificidades do setor da construção que sustentam e evidenciam cada vez mais a necessidade de utilizar as novas tecnologias com vista à adoção de práticas e ferramentas padrão de apoio à execução de obras. Sendo a tecnologia BIM, transversal a todo o setor, a sua utilização com regras padrão na conceção dos modelos e na extração de dados, potencia a otimização dos custos, do tempo, dos recursos e da qualidade final de um empreendimento, ao longo de todo o seu ciclo de vida, para além de apoiar com elevada fiabilidade as tomadas de decisão ao longo desse período. A tecnologia BIM, possibilita a antevisão do edifício a construir com um elevado grau de pormenor, com todas as vantagens que daí advêm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transformers may be classified according to dielectric insulation material as follows: • Oil-filled transformers • Dry type transformers

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Informática