860 resultados para Mining reserves
Resumo:
Software repositories have been getting a lot of attention from researchers in recent years. In order to analyze software repositories, it is necessary to first extract raw data from the version control and problem tracking systems. This poses two challenges: (1) extraction requires a non-trivial effort, and (2) the results depend on the heuristics used during extraction. These challenges burden researchers that are new to the community and make it difficult to benchmark software repository mining since it is almost impossible to reproduce experiments done by another team. In this paper we present the TA-RE corpus. TA-RE collects extracted data from software repositories in order to build a collection of projects that will simplify extraction process. Additionally the collection can be used for benchmarking. As the first step we propose an exchange language capable of making sharing and reusing data as simple as possible.
Resumo:
In a cross-cultural study perceptions of local people living in the surroundings of biosphere reserves in Switzerland and Ukraine were examined using the method of qualitative interviews. In the UNESCO Biosphere Entlebuch in Switzerland people stated that they hoped for a better regional economic development due to the existence of the biosphere reserve. However, at the same time people feared further restrictions regarding land-use. In the Carpathian Biosphere Reserve located in Transcarpathia/Ukraine people tended to connect certain conditions – such as the high price for wood – directly to the existence of the biosphere reserve, when in fact these conditions and the biosphere reserve were separate, parallel developments. In both case studies three key-categories influencing local residents’ perceptions and evaluations of biosphere reserves could be identified. These categories are (1) the economic situation, (2) the history of nature protection, and (3) the power balance between the involved stakeholders. Paying close attention to those three categories will help planners and managers of protected areas to better understand the reasoning of local residents for or against a biosphere reserve in their area.
Resumo:
The electrical power source is a critical component of the scoping level study as the source affects both the project economics and timeline. This paper proposes a systematic approach to selecting an electrical power source for a new mine. Orvana Minerals Copperwood project is used as a case study. The Copperwood results show that the proposed scoping level approach is consistent with the subsequent much more detailed feasibility study.
Resumo:
Public participation is an important component of Michigan’s Part 632 Nonferrous Mining law and is identified by researchers as important to decision-making processes. The Kennecott Eagle Project, which is located near Marquette, Michigan, is the first mine permitted under Michigan’s new mining regulation, and this research examines how public participation is structured in regulations, how the permitting process occurred during the permitting of the Eagle Project, and how participants in the permitting process perceived their participation. To understand these issues, this research implemented a review of existing mining policy and public participation policy literature, examination of documents related to the Kennecott Eagle Project and completion of semi-structured, ethnographic interviews with participants in the decision-making process. Interviewees identified issues with the structure of participation, the technical nature of the permitting process, concerns about the Michigan Department of Environmental Quality’s (DEQ) handling of mine permitting, and trust among participants. This research found that the permitting of the Kennecott Eagle Mine progressed as structured by regulation and collected technical input on the mine permit application, but did not meet the expectations of some participants who opposed the project. Findings from this research indicated that current mining regulation in Michigan is resilient to public opposition, there is need for more transparency from the Michigan DEQ during the permitting process, and current participatory structures limit the opportunities for some stakeholder groups to influence decision-making.
Resumo:
This study investigates the compressive properties of concrete incorporating Mature Fine Tailings (MFTs) waste stream from a tar sands mining operation. The objectives of this study are to investigate material properties of the MFT material itself, as well as establish general feasibility of the utilization of MFT material in concrete mixtures through empirical data and visual observations. Investigations undertaken in this study consist of moisture content, materials finer than No. 200 sieve, Atterburg Limits as well as visual observations performed on MFT material as obtained. Control concrete mixtures as well as MFT replacement mixture designs (% by wt. of water) were guided by properties of the MFT material that were experimentally established. The experimental design consists of compression testing of 4”-diameter concrete cylinders of a control mixture, 30% MFT, 50% MFT and 70% MFT replacement mixtures with air-entrainer additive, as well as a control mixture and 30% MFT replacement mixture with no air-entrainer. A total of 6 mixtures (2 control mixtures, 4 replacement mixtures) moist-cured in lime water after 24 hours initial curing were tested for ultimate compressive strength at 7 days and 28 days in accordance to ASTM C39. The test results of fresh concrete material show that the addition of air-entrainer to the control mixture increases slump from 4” to 5.5”. However, the use of MFT material in concrete mixtures significantly decreases slump as compared to controls. All MFT replacement mixtures (30%, 50%, and 70%) with air-entrainer present slumps of 1”. 30% MFT with no air-entrainer presents a slump of 1.5”. It was found that 7-day ultimate compressive stress was not a good predictor of 28-day ultimate compressive stress. 28-day results indicate that the use of MFT material in concrete with air-entrainer decreases ultimate compressive stress for 30%, 50% and 70% MFT replacement amounts by 14.2%, 17.3% and 25.1% respectively.
Resumo:
Dolomite [CaMg(CO3)2] is an intolerable impurity in phosphate ores due to its MgO content. Traditionally, the Florida phosphate industry has avoided mining high-MgO phosphate reserves due to the lack of an economically viable process for removal of dolomite. However, as the high grade phosphate reserves become depleted, more emphasis is being put on the development of a cost effective method for separating dolomite from high-MgO phosphate ores. In general, the phosphate industry demands a phosphate concentrate containing less than 1%MgO. Dolomite impurities have mineralogical properties that are very similar to the desired phosphate minerals (francolite), making the separation of the two minerals very difficult. Magnesium is primarily found as distinct dolomite-rich pebbles, very fine dolomite inclusions in predominately francolite pebbles, and magnesium substituted into the francolite structure. Jigging is a gravity separation process that attempts to take advantage of the density difference between the dolomite and francolite pebbles. A unique laboratory scale jig was designed and built at Michigan Tech for this study. Through a series of tests it was found that a pulsation rate of 200 pulse/minute, a stroke length of 1 inch, a water addition rate of 0.5gpm, and alumina ragging balls were optimum for this study. To investigate the feasibility of jigging for the removal of dolomite from phosphate ore, two high-MgO phosphate ores were tested using optimized jigging parameters: (1) Plant #1 was sized to 4.00x0.85mm and contained 1.55%MgO; (2) Plant #2 was sized to 3.40mmx0.85mm and contained 3.07% MgO. A sample from each plant was visually separated by hand into dolomite and francolite rich fractions, which were then analyzed to determine the minimum achievable MgO levels. For Plant #1 phosphate ore, a concentrate containing 0.89%MgO was achieved at a recovery of 32.0%BPL. For Plant #2, a phosphate concentrate containing 1.38%MgO was achieved at a recovery of 74.7%BPL. Minimum achievable MgO levels were determined to be 0.53%MgO for Plant #1 and 1.15%MgO for Plant #2.
Resumo:
While the 1913-1914 copper country miners’ strike undoubtedly plays an important role in the identity of the Keweenaw Peninsula, it is worth noting that the model of mining corporations employing large numbers of laborers was not a foregone conclusion in the history of American mining. Between 1807 and 1847, public mineral lands in Missouri, in the Upper Mississippi Valley, and along the southern shore of Lake Superior were reserved from sale and subject to administration by the nation’s executive branch. By decree of the federal government, miners in these regions were lessees, not landowners. Yet, in the Wisconsin lead region especially, federal authorities reserved for independent “diggers” the right to prospect virtually unencumbered. In doing so, they preserved a comparatively egalitarian system in which the ability to operate was determined as much by luck as by financial resources. A series of revolts against federal authority in the early nineteenth century gradually encouraged officers in Washington to build a system in the copper country in which only wealthy investors could marshal the resources to both obtain permits and actually commence mining operations. This paper will therefore explore the role of the federal government in establishing a leasing system for public mineral lands in the years previous to the California Gold Rush, highlighting the development of corporate mining which ultimately set a stage for the wave of miners’ strikes in the late nineteenth and early twentieth centuries.
Resumo:
During the second half of the nineteenth century fraternal and benevolent associations of numerous descriptions grew and prospered in mining communities everywhere. They played an important, but neglected role, in assisting transatlantic migration and movement between mining districts as well as building social capital within emerging mining communities. They helped to build bridges between different ethnic communities, provided conduits between labour and management, and networked miners into the non-mining community. Their influence spread beyond the adult males that made up most of their membership to their wives and families and provided levels of social and economic support otherwise unobtainable at that time. Of course, the influence of these organisations could also be divisive where certain groups or religions were excluded and they may have worked to exacerbate, as much as ameliorate, the problems of community development. This paper will examine some of these issues by looking particularly at the role of Freemasonry and Oddfellowry in Cornwall, Calumet, and Nevada City between 1860 and 1900. Work on fraternity in the Keweenaw was undertaken in Houghton some years ago with a grant from the Copper Country Archive and has since been continued by privately funded research in California and other Western mining states. Some British aspects of this research can be found in my article on mining industrial relations in Labour History Review April 2006
Resumo:
The Cardwell Mining District is part of the greater Whitehall Mining District. The district is situated about four miles to the east and northeast of Whitehall in the southern end of the Bull Mountains which are near the Continental Divide. The first reported production was in 1896 after the discovery of the Mayflower Mine. Mining has been carried on intermittently and on a small scale since that time.
Resumo:
This report includes the results of geological investigation of a small area in the northern part of the Argenta mining district. Approximately two square miles were mapped. The underground working of the three mines only were accessible: the Goldfinch. Golden Era, and Mayday mines.
Resumo:
It is surprising to learn that so large a variety of igneous rocks is present in the Jardine and Crevasse Mountain mining districts, a region that is generally thought of as consisting principally of schists.
Resumo:
From 1888 until 1893 the district was a booming mining camp. Seven stamp mills were running and ore was being mined from the Independence, King Solomon, Poorman, Golden, Hidden Treasure and Crown claims. The town of Independence, which was on the Boulder River at the fork of Basin Creek, boasted a population of 400 people.