870 resultados para Asset allocation
Resumo:
In this contribution a novel iterative bit- and power allocation (IBPA) approach has been developed when transmitting a given bit/s/Hz data rate over a correlated frequency non-selective (4× 4) Multiple-Input MultipleOutput (MIMO) channel. The iterative resources allocation algorithm developed in this investigation is aimed at the achievement of the minimum bit-error rate (BER) in a correlated MIMO communication system. In order to achieve this goal, the available bits are iteratively allocated in the MIMO active layers which present the minimum transmit power requirement per time slot.
Resumo:
Singular-value decomposition (SVD)-based multiple-input multiple output (MIMO) systems, where the whole MIMO channel is decomposed into a number of unequally weighted single-input single-output (SISO) channels, have attracted a lot of attention in the wireless community. The unequal weighting of the SISO channels has led to intensive research on bit- and power allocation even in MIMO channel situation with poor scattering conditions identified as the antennas correlation effect. In this situation, the unequal weighting of the SISO channels becomes even much stronger. In comparison to the SVD-assisted MIMO transmission, geometric mean decomposition (GMD)-based MIMO systems are able to compensate the drawback of weighted SISO channels when using SVD, where the decomposition result is nearly independent of the antennas correlation effect. The remaining interferences after the GMD-based signal processing can be easily removed by using dirty paper precoding as demonstrated in this work. Our results show that GMD-based MIMO transmission has the potential to significantly simplify the bit and power loading processes and outperforms the SVD-based MIMO transmission as long as the same QAM-constellation size is used on all equally-weighted SISO channels.
Resumo:
El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.
Resumo:
Objectives: To compare the priorities of the general public, family doctors, and gastroenterologists in allocating donor livers to potential recipients of liver allograft.
Resumo:
Objectives To explore trial participants’ understandings of randomisation.
Resumo:
To study the direct effects of photosynthesis on allocation of biomass by altering photosynthesis without altering leaf N or nitrate content, phosphoribulokinase (PRK) activity was decreased in transgenic tobacco (Nicotiana tabacum L.) with an inverted tobacco PRK cDNA and plants were grown at different N levels (0.4 and 5 mm NH4NO3). The activation state of PRK increased as the amount of enzyme was decreased genetically at both levels of N. At high N a 94% decrease in PRK activity had only a small effect (20%) on photosynthesis and growth. At low N a 94% decrease in PRK activity had a greater effect on leaf photosynthesis (decreased by up to 50%) and whole-plant photosynthesis (decreased by up to 35%) than at high N. These plants were up to 35% smaller than plants with higher PRK activities because they had less structural dry matter and less starch, which was decreased by 3- to 4-fold, but still accumulated to 24% to 31% of dry weight; young leaves contained more starch than older leaves in older plants. Leaves had a higher ion and water content, and specific leaf area was higher, but allocation between shoot and root was unaltered. In conclusion, low N in addition to a 94% decrease in PRK by antisense reduces the activity of PRK sufficient to diminish photosynthesis, which limits biomass production under conditions normally considered sink limited.
Resumo:
Com as transformações ocorridas nas últimas décadas do século XX, notadamente a expansão financeira pela qual passou o capitalismo, o enfraquecimento fiscal dos Estados nacionais e o questionamento aos sistemas de previdência pública por repartição, ganham importância em todo o mundo os fundos de pensão. Estes fundos, ao lado de outros investidores institucionais, como seguradoras e fundos de investimentos, passam a cumprir papel central no mercado acionário e também no mercado de títulos públicos e privados. Com o objetivo de realizar lucros para pagar benefícios de aposentadoria para os seus participantes, os fundos de pensão arrecadam e concentram poupança privada pulverizada, transformando-a em um ativo poderoso. No Brasil, as Entidades Fechadas de Previdência Complementar nomenclatura jurídica dos fundos de pensão possuem um total de 702 bilhões de reais em ativos, que se concentram nas três maiores entidades do país: Previ, Petros e Funcef. Em comum, estes três fundos têm o fato de serem patrocinados por empresas estatais, o que, pela legislação vigente, dá ao Poder Executivo a competência de indicar metade de seus dirigentes, incluindo o seu presidente que possui voto de desempate. O presente trabalho pesquisou o papel que estas três EFPCs cumprem enquanto instrumento de atuação do Estado no domínio econômico, especialmente para o provimento de fundos para o desenvolvimento. Para isso, primeiramente, o estudo explora o movimento de expansão financeira do capitalismo e a crise no padrão de desenvolvimento brasileiro. Depois, investiga de maneira sistemática o arcabouço jurídico que regula os fundos de pensão; e, por fim, analisa a alocação dos seus investimentos e o perfil dos seus dirigentes.
Resumo:
This paper revises mainstream economic models which include time use in an explicit and endogenous manner, suggesting a extended theory which escape from the main problem existing in the literature. In order to do it, we start by presenting in section 2 the mainstream time use models in economics, showing their main features. Once this is done, we introduce the reader in the main problems this kind of well established models imply, within section 3, being the most highlighted the problem of joint production. Subsequently, we propose an extended theory which solves the problem of joint production; this is extensively described in section 4. Last, but not least, we apply this model to offer a time use analysis of the effect of a policy which increases the retirement age in a life-cycle perspective for a representative individual.
Resumo:
It is generally assumed that any capital needs discovered by the Asset Quality Review the ECB is scheduled to finish by the end of 2014 should be filled by public funding (= fiscal backstop). This assumption is wrong, however. Banks that do not have enough capital should be asked to obtain it from the market; or be restructured using the procedures and rules recently agreed. The Directorate-General for Competition at the European Commission should be particularly vigilant to ensure that no further state aid flows to an already oversized European banking system. The case for a public backstop was strong when the entire euro area banking system was under stress, but this is no longer the case. Banks with a viable business model can find capital; those without should be closed because any public-sector re-capitalisation would likely mean throwing good money after bad.