922 resultados para Engineering Asset Management, Optimisation, Preventive Maintenance, Reliability Based Preventive Maintenance, Multiple Criteria Decision Making


Relevância:

100.00% 100.00%

Publicador:

Resumo:

There are many applications in aeronautical/aerospace engineering where some values of the design parameters states cannot be provided or determined accurately. These values can be related to the geometry(wingspan, length, angles) and or to operational flight conditions that vary due to the presence of uncertainty parameters (Mach, angle of attack, air density and temperature, etc.). These uncertainty design parameters cannot be ignored in engineering design and must be taken into the optimisation task to produce more realistic and reliable solutions. In this paper, a robust/uncertainty design method with statistical constraints is introduced to produce a set of reliable solutions which have high performance and low sensitivity. Robust design concept coupled with Multi Objective Evolutionary Algorithms (MOEAs) is defined by applying two statistical sampling formulas; mean and variance/standard deviation associated with the optimisation fitness/objective functions. The methodology is based on a canonical evolution strategy and incorporates the concepts of hierarchical topology, parallel computing and asynchronous evaluation. It is implemented for two practical Unmanned Aerial System (UAS) design problems; the flrst case considers robust multi-objective (single disciplinary: aerodynamics) design optimisation and the second considers a robust multidisciplinary (aero structures) design optimisation. Numerical results show that the solutions obtained by the robust design method with statistical constraints have a more reliable performance and sensitivity in both aerodynamics and structures when compared to the baseline design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of adaptive wing/aerofoil designs is being considered as promising techniques in aeronautic/aerospace since they can reduce aircraft emissions, improve aerodynamic performance of manned or unmanned aircraft. The paper investigates the robust design and optimisation for one type of adaptive techniques; Active Flow Control (AFC) bump at transonic flow conditions on a Natural Laminar Flow (NLF) aerofoil designed to increase aerodynamic efficiency (especially high lift to drag ratio). The concept of using Shock Control Bump (SCB) is to control supersonic flow on the suction/pressure side of NLF aerofoil: RAE 5243 that leads to delaying shock occurrence or weakening its strength. Such AFC technique reduces total drag at transonic speeds due to reduction of wave drag. The location of Boundary Layer Transition (BLT) can influence the position the supersonic shock occurrence. The BLT position is an uncertainty in aerodynamic design due to the many factors, such as surface contamination or surface erosion. The paper studies the SCB shape design optimisation using robust Evolutionary Algorithms (EAs) with uncertainty in BLT positions. The optimisation method is based on a canonical evolution strategy and incorporates the concepts of hierarchical topology, parallel computing and asynchronous evaluation. Two test cases are conducted; the first test assumes the BLT is at 45% of chord from the leading edge and the second test considers robust design optimisation for SCB at the variability of BLT positions and lift coefficient. Numerical result shows that the optimisation method coupled to uncertainty design techniques produces Pareto optimal SCB shapes which have low sensitivity and high aerodynamic performance while having significant total drag reduction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fibre composite structures have become the most attractive candidate for civil engineering applications. Fibre reinforced plastic polymer (FRP) composite materials have been used in the rehabilitation and replacement of the old degrading traditional structures or build new structures. However, the lack of design standards for civil infrastructure limits their structural applications. The majority of the existing applications have been designed based on the research and guidelines provided by the fibre composite manufacturers or based on the designer’s experience. It has been a tendency that the final structure is generally over-designed. This paper provides a review on the available studies related to the design optimization of fibre composite structures used in civil engineering such as; plate, beam, box beam, sandwich panel, bridge girder, and bridge deck. Various optimization methods are presented and compared. In addition, the importance of using the appropriate optimization technique is discussed. An improved methodology, which considering experimental testing, numerical modelling, and design constrains, is proposed in the paper for design optimization of composite structures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Airports worldwide represent key forms of critical infrastructure in addition to serving as nodes in the international aviation network. While the continued operation of airports is critical to the functioning of reliable air passenger and freight transportation, these infrastructure systems face a number of sources of disturbance that threaten their operational viability. Recent examples of high magnitude events include the eruption of Iceland’s Eyjafjallajokull volcano eruption (Folattau and Schofield 2010), the failure of multiple systems at the opening of Heathrow’s Terminal 5 (Brady and Davies 2010) and the Glasgow airport 2007 terrorist attack (Crichton 2008). While these newsworthy events do occur, a multitude of lower-level more common disturbances also have the potential to cause significant discontinuity to airport operations. Regional airports face a unique set of challenges, particularly in a nation like Australia where they serve to link otherwise remote and isolated communities to metropolitan hubs (Wheeler 2005), often without the resources and political attention received by larger capital city airports. This paper discusses conceptual relationships between Business Continuity Management (BCM) and High Reliability Theory, and proposes BCM as an appropriate risk-based management process to ensure continued airport operation in the face of uncertainty. In addition, it argues that that correctly implemented BCM can lead to highly reliable organisations. This is framed within the broader context of critical infrastructures and the need for adequate crisis management approaches suited to their unique requirements (Boin and McConnell 2007).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundamental studies on constructability issue done in United States, United Kingdom and Australia illustrate capability of this concept to affect overall objectives of construction projects. It can result in significant cost and time savings and improved final quality by consideration of construction contractors experiences during conceptual planning and design phases. As intensive as these studies are, they do not attempt to investigate importance of these activities in order to find each of their specific barriers separately. This research explores Constructability Activities (CAs) in all project phases separately based on amount of contractors involvement in each activity and also amount of gap that exists between target and actual effects of each activity on achieving the final objectives of building projects in Malaysia. It ends to development of Critical Constructability Activities (CCAs). This research is crucial to gaining a better understanding of CCAs which are caused based on contractors higher participation percentage and larger gaps between their target and actual effects on achieving the final aims of the project. This research highlights the need to overcome barriers of CAs implementation in building projects. This study recommends construction stakeholders to concentrate more on CCAs in order to achieve the overall objectives of the project much faster and easier.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The concept of constructability integrates individual construction functions and experiences through suitable and timely inputs into early stages of project planning and design. It aims to ease construction processes for a more effective and efficient achievement of overall project objectives. Similarly, the concepts of operability and maintainability integrate the functions and experiences of Operation and Maintenance (O&M) into project planning and design. Various studies suggested that these concepts have been implemented in isolation of each other and thus preventing optimum result in delivering infrastructure projects. This paper explores the integration of these three concepts in order to maximize the benefits of their implementation. It reviews the literature to identify the main O&M concerns, and assesses their association with constructability principles. This provides a structure to develop an extended constructability model that includes O&M concerns. It is anticipated that an extended constructability model that include O&M considerations can lead to a more efficient and effective delivery of infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current conceptualizations of organizational processes consider them as internally optimized yet static systems. Still, turbulences in the contextual environment of a firm often lead to adaptation requirements that these processes are unable to fulfil. Based on a multiple case study of the core processes of two large organizations, we offer an extended conceptualisation of business processes as complex adaptive systems. This conceptualization can enable firms to optimise business processes by analysing operations in different contexts and by examining the complex interaction between external, contextual elements and internal agent schemata. From this analysis, we discuss how information technology can play a vital goal in achieving this goal by providing discovery, analysis, and automation support. We detail implications for research and practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Acoustic emission (AE) analysis is one of the several diagnostic techniques available nowadays for structural health monitoring (SHM) of engineering structures. Some of its advantages over other techniques include high sensitivity to crack growth and capability of monitoring a structure in real time. The phenomenon of rapid release of energy within a material by crack initiation or growth in form of stress waves is known as acoustic emission (AE). In AE technique, these stress waves are recorded by means of suitable sensors placed on the surface of a structure. Recorded signals are subsequently analysed to gather information about the nature of the source. By enabling early detection of crack growth, AE technique helps in planning timely retrofitting or other maintenance jobs or even replacement of the structure if required. In spite of being a promising tool, some challenges do still exist behind the successful application of AE technique. Large amount of data is generated during AE testing, hence effective data analysis is necessary, especially for long term monitoring uses. Appropriate analysis of AE data for quantification of damage level is an area that has received considerable attention. Various approaches available for damage quantification for severity assessment are discussed in this paper, with special focus on civil infrastructure such as bridges. One method called improved b-value analysis is used to analyse data collected from laboratory testing.