998 resultados para 1108
Resumo:
Purpose - The purpose of this paper is to provide a quantitative multicriteria decision-making approach to knowledge management in construction entrepreneurship education by means of an analytic knowledge network process (KANP) Design/methodology/approach- The KANP approach in the study integrates a standard industrial classification with the analytic network process (ANP). For the construction entrepreneurship education, a decision-making model named KANP.CEEM is built to apply the KANP method in the evaluation of teaching cases to facilitate the case method, which is widely adopted in entrepreneurship education at business schools. Findings- The study finds that there are eight clusters and 178 nodes in the KANP.CEEM model, and experimental research on the evaluation of teaching cases discloses that the KANP method is effective in conducting knowledge management to the entrepreneurship education. Research limitations/implications- As an experimental research, this paper ignores the concordance between a selected standard classification and others, which perhaps limits the usefulness of KANP.CEEM model elsewhere. Practical implications- As the KANP.CEEM model is built based on the standard classification codes and the embedded ANP, it is thus expected that the model has a wide potential in evaluating knowledge-based teaching materials for any education purpose with a background from the construction industry, and can be used by both faculty and students. Originality/value- This paper fulfils a knowledge management need and offers a practical tool for an academic starting out on the development of knowledge-based teaching cases and other teaching materials or for a student going through the case studies and other learning materials.
Resumo:
Purpose – To evaluate the control strategy for a hybrid natural ventilation wind catchers and air-conditioning system and to assess the contribution of wind catchers to indoor air environments and energy savings if any. Design/methodology/approach – Most of the modeling techniques for assessing wind catchers performance are theoretical. Post-occupancy evaluation studies of buildings will provide an insight into the operation of these building components and help to inform facilities managers. A case study for POE was presented in this paper. Findings – The monitoring of the summer and winter month operations showed that the indoor air quality parameters were kept within the design target range. The design control strategy failed to record data regarding the operation, opening time and position of wind catchers system. Though the implemented control strategy was working effectively in monitoring the operation of mechanical ventilation systems, i.e. AHU, did not integrate the wind catchers with the mechanical ventilation system. Research limitations/implications – Owing to short-falls in the control strategy implemented in this project, it was found difficult to quantify and verify the contribution of the wind catchers to the internal conditions and, hence, energy savings. Practical implications – Controlling the operation of the wind catchers via the AHU will lead to isolation of the wind catchers in the event of malfunctioning of the AHU. Wind catchers will contribute to the ventilation of space, particularly in the summer months. Originality/value – This paper demonstrates the value of POE as indispensable tool for FM professionals. It further provides insight into the application of natural ventilation systems in building for healthier indoor environments at lower energy cost. The design of the control strategy for natural ventilation and air-conditioning should be considered at the design stage involving the FM personnel.
Resumo:
A combined windcatcher and light pipe (SunCatcher) was installed in the seminar room at the University of Reading, UK. Monitoring of indoor environment in real weather conditions was conducted to evaluate the application of windcatchers for natural ventilation. In addition, a subjective occupancy survey was undertaken. External weather conditions and internal indoor air quality indicators were recorded. The “tracer-gas decay” method using SF6 was used to establish air change rate for various conditions. The results indicated that the ventilation rate achieved through the windcatcher depends on the difference between internal and external air temperatures, and on wind speed and direction, in agreement with other published work in the area. The indoor air quality parameters were found to be within acceptable levels when the windcatcher was in operation. The measured air change rate was between 1.5ac/h and 6.8ac/h. Occupants’ questionnaires showed 75 per cent satisfaction with the internal conditions and welcomed the installation of the systems in UK buildings.
Resumo:
Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.
Resumo:
Requirements management (RM), as practised in the aerospace and defence sectors, attracts interest from construction researchers in response to longstanding problems of project definition. Doubts are expressed whether RM offers a new discipline for construction practitioners or whether it repeats previous exhortations to adopt a more disciplined way of working. Whilst systems engineering has an established track record of addressing complex technical problems, its extension to socially complex problems has been challenged. The dominant storyline of RM is one of procedural rationality and RM is commonly presented as a means of controlling dilettante behaviour. Interviews with RM practitioners suggest a considerable gulf between the dominant storyline in the literature and how practitioners operate in practice. The paper challenges construction researchers interested in RM to reflect more upon the theoretical debates that underpin current equivalent practices in construction and the disparity between espoused and enacted practice.
Resumo:
Facilities managers have a host of skills to sustain the functionality of complex buildings, often not provided by them directly, but by the team of specialists they draw upon to effectively plan for the future, whether the resource be money, space or technology. Building intelligence presents a challenge in terms of understanding a wholly new approach to the building management. This paper asks if the intelligent building of today meets the needs of the facilities management team. Does it enable them to manage their asset more effectively? New technologies are converging that will enable a radically new approach to maintenance, enabling remote smart sensing or remote condition based monitoring (CBM). Some of the design and economic issues that arise from this radically new approach to managing built assets are highlighted and the possibilities for a maintenance environment, where wires, power cables and data loggers become a thing of the past, is described.
Resumo:
Because of the importance and potential usefulness of construction market statistics to firms and government, consistency between different sources of data is examined with a view to building a predictive model of construction output using construction data alone. However, a comparison of Department of Trade and Industry (DTI) and Office for National Statistics (ONS) series shows that the correlation coefcient (used as a measure of consistency) of the DTI output and DTI orders data and the correlation coefficient of the DTI output and ONS output data are low. It is not possible to derive a predictive model of DTI output based on DTI orders data alone. The question arises whether or not an alternative independent source of data may be used to predict DTI output data. Independent data produced by Emap Glenigan (EG), based on planning applications, potentially offers such a source of information. The EG data records the value of planning applications and their planned start and finish dates. However, as this data is ex ante and is not correlated with DTI output it is not possible to use this data to describe the volume of actual construction output. Nor is it possible to use the EG planning data to predict DTI construc-tion orders data. Further consideration of the issues raised reveal that it is not practically possible to develop a consistent predictive model of construction output using construction statistics gathered at different stages in the development process.
Resumo:
The RIBA Plan of Work describes the way a construction process should be organized. Although not officially approved by the RIBA council, a new plan of work was published in 2000 with the intention of replacing the RIBA Plan of Work, so it is useful to analyse both in terms of the organizational structure they impose upon construction projects. Using analytical principles from organizational theory, both plans are analysed by converting them into organizational matrices and assessing their relative complexities, the load on participants, decentralization of responsibility, number of interfaces and the extent to which they provide for co-ordination and control. This demonstrates first, that the analysis of organizational structure is an appropriate approach for undertaking comparisons of such documents; and second, that while both plans of work are of roughly equal complexity, the new one is more demanding on the participants; produces a higher number of interfaces between processes, and provides for more co-ordination than the old one. Neither plan deals with controlling the output of individuals, leaving it as an internal matter for each participating organization.
Resumo:
Purpose – This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems. Design/methodology/approach – The use of ILS within a through-life business model (TLBM) is a better framework to achieve a well-designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed. Findings – The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies. Originality/value – The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.
Resumo:
Purpose – For many academics in UK universities the nature and orientation of their research is overwhelmingly determined by considerations of how that work will be graded in research assessment exercises (RAEs). The grades awarded to work in a particular subject area can have a considerable impact on the individual and their university. There is a need to better understand those factors which may influence these grades. The paper seeks to address this issue. Design/methodology/approach – The paper considers relationships between the grades awarded and the quantitative information provided to the assessment panels for the 1996 and 2001 RAEs for two subject areas, built environment and town and country planning, and for three other subject areas, civil engineering, geography and archaeology, in the 2001 RAE. Findings – A simple model demonstrating strong and consistent relationships is established. RAE performance relates to numbers of research active staff, the production of books and journal papers, numbers of research studentships and graduations, and research income. Important differences between subject areas are identified. Research limitations/implications – Important issues are raised about the extent to which the new assessment methodology to be adopted for the 2008 RAE will capture the essence of good quality research in architecture and built environment. Originality/value – The findings provide a developmental perspective of RAEs and show how, despite a changed methodology, various research activities might be valued in the 2008 RAE. The basis for a methodology for reviewing the credibility of the judgements of panels is proposed.
Resumo:
Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.
Resumo:
Purpose – Facilities managers have less visibility of how buildings are being used due to flexible working and unpredictable workers. The purpose of this paper is to examine the current issues in workspace management and an automatic solution through radio frequency identification (RFID) that could provide real time information on the volume and capacity of buildings. Design/methodology/approach – The study described in this paper is based on a case study at a facilities management (FM) department. The department is examining a ubiquitous technology in the form of innovative RFID for security and workspace management. Interviews and observations are conducted within the facilities department for the initial phase of the implementation of RFID technology. Findings – Research suggests that work methods are evolving and becoming more flexible. With this in mind, facilities managers face new challenges to create a suitable environment for an unpredictable workforce. RFID is one solution that could provide facilities managers with an automatic way of examining space in real time and over a wider area than currently possible. RFID alone for space management is financially expensive but by making the application multiple for other areas makes more business sense. Practical implications – This paper will provide practicing FM and academics with the knowledge gained from the application of RFID in this organisation. While the concept of flexible working seems attractive, there is an emerging need to provide various forms of spaces that enable employees' satisfaction and enhance the productivity of the organisation. Originality/value – The paper introduces new thinking on the subject of “workspace management”. It highlights the current difficulties in workspace management and how an RFID solution will benefit workspace methods.
Resumo:
Purpose – The purpose of this paper is to propose a process model for knowledge transfer in using theories relating knowledge communication and knowledge translation. Design/methodology/approach – Most of what is put forward in this paper is based on a research project titled “Procurement for innovation and knowledge transfer (ProFIK)”. The project is funded by a UK government research council – The Engineering and Physical Sciences Research Council (EPSRC). The discussions are mainly grounded on a thorough review of literature accomplished as part of the research project. Findings – The process model developed in this paper has built upon the theory of knowledge transfer and the theory of communication. Knowledge transfer, per se, is not a mere transfer of knowledge. It involves different stages of knowledge transformation. Depending on the context of knowledge transfer, it can also be influenced by many factors; some positive and some negative. The developed model of knowledge transfer attempts to encapsulate all these issues in order to create a holistic framework. Originality/value of paper – An attempt has been made in the paper to combine some of the significant theories or findings relating to knowledge transfer together, making the paper an original and valuable one.
Resumo:
The purpose of this paper is to provide an insight into the growth stage of facilities management (FM) in the South East Asia region. A questionnaire study of local and international firms operating in South East Asia was used. South East Asia needs to open up to change, particularly with respect to parity in issues of global competition in FM standards. This study is based on a limited sample size using a self-reporting methodology. Further research is needed to further investigate the findings. This paper addresses a unique insight into the contrasting approach to FM in the South East Asia region.
Resumo:
Purpose – The purpose of this paper is to focus on the Fédération Internationale des Ingénieurs-Conseils (FIDIC) White Book standard form of building contract. It tracks the changes to this contract over its four editions, and seeks to identify their underlying causes. Design/methodology/approach – The changes made to the White Book are quantified using a specific type of quantitative content analysis. The amended clauses are then examined to understand the nature of the changes made. Findings – The length of the contract increased by 34 per cent between 1990 and 2006. A large proportion of the overall increase can be attributed to the clauses dealing with “conflict of interest/corruption” and “dispute resolution”. In both instances, the FIDIC drafting committees have responded to international developments to discourage corruption, and to encourage the use of alternative dispute resolution. Between 1998 and 2006, the average length of the sentences increased slightly, raising the question of whether long sentences are easily understood by users of contracts. Research limitations/implications – Quantification of text appears to be particularly useful for the analysis of documents which are regularly updated because changes can be clearly identified and the length of sentences can be determined, leading to conclusions about the readability of the text. However, caution is needed because changes of great relevance can be made to contract clauses without actually affecting their length. Practical implications – The paper will be instructive for contract drafters and informative for users of FIDIC's White Book. Originality/value – Quantifying text has been rarely used regarding standard-form contracts in the field of construction.