973 resultados para test construction
Resumo:
The purpose of this paper is to describe a new decomposition construction for perfect secret sharing schemes with graph access structures. The previous decomposition construction proposed by Stinson is a recursive method that uses small secret sharing schemes as building blocks in the construction of larger schemes. When the Stinson method is applied to the graph access structures, the number of such “small” schemes is typically exponential in the number of the participants, resulting in an exponential algorithm. Our method has the same flavor as the Stinson decomposition construction; however, the linear programming problem involved in the construction is formulated in such a way that the number of “small” schemes is polynomial in the size of the participants, which in turn gives rise to a polynomial time construction. We also show that if we apply the Stinson construction to the “small” schemes arising from our new construction, both have the same information rate.
Resumo:
We present two unconditional secure protocols for private set disjointness tests. In order to provide intuition of our protocols, we give a naive example that applies Sylvester matrices. Unfortunately, this simple construction is insecure as it reveals information about the intersection cardinality. More specifically, it discloses its lower bound. By using the Lagrange interpolation, we provide a protocol for the honest-but-curious case without revealing any additional information. Finally, we describe a protocol that is secure against malicious adversaries. In this protocol, a verification test is applied to detect misbehaving participants. Both protocols require O(1) rounds of communication. Our protocols are more efficient than the previous protocols in terms of communication and computation overhead. Unlike previous protocols whose security relies on computational assumptions, our protocols provide information theoretic security. To our knowledge, our protocols are the first ones that have been designed without a generic secure function evaluation. More important, they are the most efficient protocols for private disjointness tests in the malicious adversary case.
Resumo:
The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.
Resumo:
The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.
Resumo:
Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.
Resumo:
As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).
Resumo:
Population increase and economic developments can lead to construction as well as demolition of infrastructures such as buildings, bridges, roads, etc resulting in used concrete as a primary waste product. Recycling of waste concrete to obtain the recycled concrete aggregates (RCA) for base and/or sub-base materials in road construction is a foremost application to be promoted to gain economical and sustainability benefits. As the mortar, bricks, glass and reclaimed asphalt pavement (RAP) present as constituents in RCA, it exhibits inconsistent properties and performance. In this study, six different types of RCA samples were subjected classification tests such as particle size distribution, plasticity, compaction test, unconfined compressive strength (UCS) and California bearing ratio (CBR) tests. Results were compared with those of the standard road materials used in Queensland, Australia. It was found that material type ‘RM1-100/RM3-0’ and ‘RM1-80/RM3-20’ samples are in the margin of the minimum required specifications of base materials used for high volume unbound granular roads while others are lower than that the minimum requirement.
Resumo:
Lower extremities are particularly susceptible to injury in an under‐vehicle explosion. Operational fitness of military vehicles is assessed through anthropometric test devices (ATDs) in full‐scale blast tests. The aim of this study was to compare the response between the Hybrid‐III ATD, the MiL‐Lx ATD and cadavers in our traumatic injury simulator, which is able to replicate the response of the vehicle floor in an under‐vehicle explosion. All specimens were fitted with a combat boot and tested on our traumatic injury simulator in a seated position. The load recorded in the ATDs was above the tolerance levels recommended by NATO in all tests; no injuries were observed in any of the 3 cadaveric specimens. The Hybrid‐III produced higher peak forces than the MiL‐Lx. The time to peak strain in the calcaneus of the cadavers was similar to the time to peak force in the ATDs. Maximum compression of the sole of the combat boot was similar for cadavers and MiL‐Lx, but significantly greater for the Hybrid‐III. These results suggest that the MiL‐Lx has a more biofidelic response to under‐vehicle explosive events compared to the Hybrid‐III. Therefore, it is recommended that mitigation strategies are assessed using the MiL‐Lx surrogate and not the Hybrid‐III.
Resumo:
The design activities of the development of the SCRAMSPACE I scramjet-powered free-flight experiment are described in this paper. The objectives of this flight are first described together with the definition of the primary, secondary and tertiary experiments. The Scramjet configuration studied is first discussed together with the rocket motor system selected for this flight. The different flight sequences are then explained, highlighting the SCRAMSPACE I free-flyer separation and re-orientation procedures. A design trade-off study is then described considering vehicle stability, packaging, thermo-structural analysis and trajectory, discussing the alignment of the predicted performance with the mission scientific requirements. The global system architecture and instrumentation of the vehicle are then explained. The conclusions of this design phase are that a vehicle design has been produced which is able to meet the mission scientific goals and the procurement & construction of the vehicle are ongoing.
Resumo:
We present efficient protocols for private set disjointness tests. We start from an intuition of our protocols that applies Sylvester matrices. Unfortunately, this simple construction is insecure as it reveals information about the cardinality of the intersection. More specifically, it discloses its lower bound. By using the Lagrange interpolation we provide a protocol for the honest-but-curious case without revealing any additional information. Finally, we describe a protocol that is secure against malicious adversaries. The protocol applies a verification test to detect misbehaving participants. Both protocols require O(1) rounds of communication. Our protocols are more efficient than the previous protocols in terms of communication and computation overhead. Unlike previous protocols whose security relies on computational assumptions, our protocols provide information theoretic security. To our knowledge, our protocols are first ones that have been designed without a generic secure function evaluation. More importantly, they are the most efficient protocols for private disjointness tests for the malicious adversary case.
Resumo:
Global climate change is one of the most significant environmental issues that can harm human development. One central issue for the building and construction industry to address global climate change is the development of a credible and meaningful way to measure greenhouse gas (GHG) emissions. While Publicly Available Specification (PAS) 2050, the first international GHG standard, has been proven to be successful in standardizing the quantification process, its contribution to the management of carbon labels for construction materials is limited. With the recent publication of ISO 14067: Greenhouse gases – carbon footprint of products – requirements and guidelines for quantification and communication in May 2013, it is necessary for the building and construction industry to understand the past, present and future of the carbon labelling practices for construction materials. A systematic review shows that international GHG standards have been evolving in terms of providing additional guidance on communication and comparison, as well as less flexibility on the use of carbon labels. At the same time, carbon labelling schemes have been evolving on standardization and benchmarking. In addition, future actions are needed in the aspect of raising consumer awareness, providing benchmarking, ensuring standardization and developing simulation technologies in order for carbon labelling schemes for construction materials to provide credible, accurate and transparent information on GHG emissions.
Resumo:
The contemporary default materials for multi-storey buildings – namely concrete and steel – are all significant generators of carbon and the use of timber products provides a technically, economically and environmentally viable alternative. In particular, timber’s sustainability can drive increased use and subsequent evolution of the Blue economy as a new economic model. National research to date, however, indicates a resistance to the uptake of timber technologies in Australia. To investigate this further, a preliminary study involving a convenience sample of 15 experts was conducted to identify the main barriers involved in the use of timber frames in multi-storey buildings. A closed-ended questionnaire survey involving 74 experienced construction industry participants was then undertaken to rate the relative importance of the barriers. The survey confirmed the most significant barriers to be a perceived increase in maintenance costs and fire risk, together with a limited awareness of the emerging timber technologies available. It is expected that the results will benefit government and the timber industry, contributing to environmental improvement by developing strategies to increase the use of timber technologies in multi-storey buildings by countering perceived barriers in the Australian context.
Resumo:
This paper investigates the teaching and learning of fractions to Indigenous adult learners in a Civil Construction Certificate Course. More specifically it explores why the use of materials is critical to building knowledge and understanding. This focus is important for two reasons. First, it allows for considerations of a trainer’s approach for teaching fractions and, second it provides insights into how adult learners can be supported with representing their practical experiences of fractions to make generalisation thus building on their knowledge and learning experiences. The paper draws on teaching episodes from an Australian Research Council funded Linkage project that investigates how mathematics is taught and learned in Certificate Courses, here, Certificate 11 in Civil Construction. Action research and decolonising methods (Smith, 1999) were used to conduct the research. Video excerpts which feature one trainer and three students are analysed and described. Findings from the data indicate that adult learners need to be supported with materials to assist with building their capacity to know and apply understandings of fractions in a range of contexts, besides construction. Without materials and where fractions are taught via pen and paper tasks, students are less likely to retain and apply fraction ideas to their Certificate Course. Further they are less likely to understand decimals because of limited understanding of fractions.
Resumo:
Safety has long been a problem in the construction industry. Repair, maintenance, alteration and addition (RMAA) sector has emerged to play an important role in the construction industry. It accounted for 53% of the total construction market in Hong Kong in 2007. Safety performance of the RMAA words has been alarming. Statistics indicate that the percentage of fatal industrial accidents arising from RMAA work in Hong Kong was over 56% in 2006 while the remaining 44% was from new works. Effective safety measures to address the safety problems and improve safety performance of the RMAA sector are urgently needed. Unsafe behaviour has been attributed to one of the major causes of accidents. Traditional cost-benefit analysis of workers' safety behaviour seems to be inadequate. This paper proposes to adopt a game theoretical approach to analyse safety behaviour of RMAA workers. Game theory is concerned with the decision-making process in situations where outcomes depend upon choices made by one or more players. A game theoretical model between contractor and worker has been proffered. Mathematical analysis of this game model has been done and implications of the analysis have been discussed.