This research investigated strategies for motorway congestion management from a different angle: that is, how to quickly recover motorway from congestion at the end of peak hours, given congestion cannot be eliminated due to excessive demand during the long peak hours nowadays. The project developed a zone recovery strategy using ramp metering for rapid congestion recovery, and a serious of traffic simulation investigations were included to evaluate the developed strategy. The results, from both microscopic and macroscopic simulation, demonstrated the effectiveness of the zone recovery strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retirement villages are regarded as a viable accommodation option for the ever increasing ageing population in Australia. This paper aims to identify sustainability features and practices adopted in retirement villages and associated benefits to improve the life quality of older people. A case study of an existing retirement village 10kms from Brisbane CBD was conducted involving a series of interviews with the village managers and residents together with documents relating to the village's operations and activities. The environmentally friendly features that were incorporated into the development mainly include green design for the site and floor plan and waste management in daily operation. More importantly, a variety of facilities are provided to strengthen the social engagement and interactions among the residents. Additionally, different daily services are provided to assist independent living and improve the health conditions of residents. Also, the relatively low vacancy rate in this village indicates that these sustainability features offer good value of money for the residents. The paper provides a first look at sustainable retirement villages in terms of triple bottom line sustainability with emphasis on social aspects, reveals the importance in maintaining an appropriate balance, and provides examples of how this can be achieved in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project was an initial stage in formulating and management of the optimum budget allocation during the operational, maintenance and rehabilitation phases in high rise residential property development in Malaysia. The principal objective of this project is to develop a framework of Whole Life Cycle Costing for high rise residential property development that will enhance the quality and cost effectiveness of this building type in Malaysia. The researcher investigated 13 building components from 6 high rise residential property developments in Johor, Malaysia to determine the affect and economic impact of component initial cost and quality by applying them to a Whole Life Cycle Cost model approach. The results provide valuable data in respect to the overall cost of specific components over the whole life of a large high rise building. In addition, Dr. Mat Noor also determined the impact and satisfaction of quality of building components through WLCC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The past decade has seen an increase in the number of significant natural disasters that have caused considerable loss of life as well as damage to all property markets in the affected areas. In many cases, these natural disasters have not only caused significant property damage, but in numerous cases, have resulted in the total destruction of the property in the location. With these disasters attracting considerable media attention, the public are more aware of where these affected property markets are, as well as the overall damage to properties that have been damaged or destroyed. This heightened level of awareness has to have an impact on the participants in the property market, whether a developer, vendor seller or investor. To assess this issue, a residential property market that has been affected by a significant natural disaster over the past 2 years has been analysed to determine the overall impact of the disaster on buyer, renter and vendor behaviour, as well as prices in these residential markets. This paper is based on data from the Brisbane flood in January 2011. This natural disaster resulted in loss of life and partial and total devastation of considerable residential property sectors. Data for the research have been based on the residential sales and rental listings for each week of the study period to determine the level of activity in the specific property sectors, and these are also compared to the median house prices for the various suburbs for the same period based on suburbs being either flood affected or flood free. As there are 48 suburbs included in the study, it has been possible to group these suburbs on a socio-economic basis to determine possible differences due to location and value. Data were accessed from realestate.com.au, a free real estate site that provides details of current rental and sales listings on a suburb basis, RP Data a commercial property sales database and the Australian Bureau of Statistics. The paper found that sales listings fell immediately after the flood in the affected areas, but there was no corresponding fall or increase in sales listings in the flood-free suburbs. There was a significant decrease in the number of rental listings follow the flood as affected parties sought alternate accommodation. The greatest fall in rental listings was in areas close to the flood-affected suburbs indicating the desire to be close to the flooded property during the repair period.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A total of 1,625 tornadoes occurred in the United States in 2011, resulting in economic losses that exceeded $25 billion. Two tornado outbreaks stand out because they caused more than half of those losses. The tornadoes that cut through Tuscaloosa, Alabama, on April 27 and Joplin, Missouri, on May 22 were responsible for a combined 223 fatalities and more than 13,000 damaged buildings in the two cities. Although the economic losses associated with tornado damage are well documented, the writers argue that the overall impact should encompass longer term, broader considerations such as the social disruption and psychological effects that impact communities. This paper examines observations by tornado damage assessment teams led by the first author in these two medium-sized cities and suggests that the evolution of building codes and past approaches to construction have led to conditions that made this extent of damage possible. The authors outline a multidisciplinary path forward that incorporates engineering research and social and economic studies into a new design paradigm leading to building code changes and social practices that will improve resistance and mitigate future losses at a community level from tornadoes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Standard Monte Carlo (sMC) simulation models have been widely used in AEC industry research to address system uncertainties. Although the benefits of probabilistic simulation analyses over deterministic methods are well documented, the sMC simulation technique is quite sensitive to the probability distributions of the input variables. This phenomenon becomes highly pronounced when the region of interest within the joint probability distribution (a function of the input variables) is small. In such cases, the standard Monte Carlo approach is often impractical from a computational standpoint. In this paper, a comparative analysis of standard Monte Carlo simulation to Markov Chain Monte Carlo with subset simulation (MCMC/ss) is presented. The MCMC/ss technique constitutes a more complex simulation method (relative to sMC), wherein a structured sampling algorithm is employed in place of completely randomized sampling. Consequently, gains in computational efficiency can be made. The two simulation methods are compared via theoretical case studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study unveils causes of accidents in repair, maintenance, alteration and addition (RMAA) work. RMAA work is playing an increasingly important role in developed societies, including Hong Kong. Safety problems associated with RMAA work in Hong Kong has reached an alarming level. In view of rapid expansion of the RMAA sector and rising proportion of accidents in the construction industry, there is a pressing need to investigate causes of RMAA accidents. Structured interviews were conducted with RMAA contractors to explore causes of accidents in the RMAA sector. A two-round Delphi method with 13 safety experts was subsequently employed to verify the interview findings and rank the relative degree of importance for various causes of accidents. Accidents happen in RMAA work due to intersection of reasons. One of the root causes of accidents in RMAA works is low safety awareness of RMAA workers; however, wider organizational and industrial factors are not negligible. This study sheds light on why accidents happen in the RMAA sector. Only when the factors leading to accidents are identified can effective measures be made.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Repair, maintenance, minor alteration, and addition work (RMAA) has become more and more important in developed societies, but its safety performance is alarming. For example, RMAA projects accounted for 53.2% of the total construction market and the percentage of RMAA accidents to all construction accidents in the Hong Kong Special Administrative Region (HKSAR) increased considerably in 2007. The RMAA sector has a huge potential for safety improvement. This study aims to explore and evaluate the difficulties of implementing safety practices in RMAA work. The mixed methods approach was adopted, and semistructured interviews and a two-round Delphi survey were conducted for the data collection. Major difficulties were identified, including limited safety resources for small and medium enterprises (SMEs), difficulty in changing the mindset of RMAA workers, and difficulty in performing safety supervision. These obstacles for implementing safety practices in the RMAA sector, if successfully removed, could significantly improve the safety performance of the RMAA sector and the construction industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Subcontractors contribute significantly to construction projects and their performance can seriously affect over-all project success. It is crucial, therefore, to appraise the performance of subcontractors to ensure they satisfy the client's expectations and project requirements. To increase the transparency and accuracy of subcontractor appraisal, the baseline and target performance levels should be set at the outset so that the appraisers and those being appraised realize exactly what standards are to be achieved. The balanced scorecard, being a powerful tool for performance appraisal, offers a potentially good approach for modeling the subcontractor appraisal process. In this paper, an approach to developing a balanced scorecard subcontractor appraisal model is proposed and demonstrated through a questionnaire survey administered in Hong Kong and from which the baseline and target performance levels for large-scale skilled subcontractors are identified. A case example is used to illustrate the operation of the model. Finally, a means by which the model may be validated is demonstrated through the use of field experts. The results demonstrate the feasibility of developing a balanced scorecard model that can help improve the transparency of subcontractor appraisal despite the baseline and target performance levels changing according to the project characteristics, subcontractor categories and size.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose The repair, maintenance, minor alteration and addition (RMAA) sector has been expanding in many developed cities. Safety problems of the RMAA sector have attracted the attention of many governments. This study has the objectives of comparing the level of safety climate of workers, supervisors and managers in the RMAA sector; and explaining/ predicting the impact of safety climate on injury occurrence of workers, supervisors and managers. Design/methodology/approach A questionnaire survey was administered to RMAA contracting companies in Hong Kong. Findings When comparing the safety climate perception of workers, supervisors and managers in the RMAA sector, the supervisors group had the lowest mean safety climate score. Results showed that a positive workforce safety attitude and acceptance of safety rules and regulations reduced the workers’ likelihood of having injuries. A reasonable production schedule led to a lower probability of supervisors being injured. Management commitment and effective safety management reduced the probability of managers being injured. Originality/value This study revealed variations of safety climate at the different levels in the organizational hierarchy and their varying influence on safety performance of the RMAA sector. Safety of RMAA works could be improved by promulgating specific safety measures at the different hierarchy levels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The importance of repair, maintenance, minor alteration, and addition (RMAA) works is increasing in many built societies. When the volume of RMAA works increases, the occurrence of RMAA accidents also increases. Safety of RMAA works deserves more attention; however, research in this important topic remains limited. Safety climate is considered a key factor that influences safety performance. The present study aims to determine the relationships between safety climate and safety performance of RMAA works, thereby offering recommendations on improving RMAA safety. Questionnaires were dispatched to private property management companies, maintenance sections of quasi-government developers and their subcontractors, RMAA sections of general contractors, small RMAA contractors, building services contractors and trade unions in Hong Kong. In total, data from 396 questionnaires were collected from RMAA workers. The sample was divided into two equal-sized sub-samples. On the first sub-sample SEM was used to test the model, which was validated on the second sub-sample. The model revealed a significant negative relationship between RMAA safety climate and incidence of self-reported near misses and injuries, and significant positive relationships between RMAA safety climate and safety participation and safety compliance respectively. Higher RMAA safety climate was positively associated with a lower incidence of self-reported near misses and injuries and higher levels of safety participation and safety compliance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The accident record of the repair, maintenance, minor alteration, and addition (RMAA) sector has been alarmingly high; however, research in the RMAA sector remains limited. Unsafe behavior is considered one of the key causes of accidents. Thus, the organizational factors that influence individual safety behavior at work continue to be the focus of many studies. The safety climate, which reflects the true priority of safety in an organization, has drawn much attention. Safety climate measurement helps to identify areas for safety improvement. The current study aims to identify safety climate factors in the RMAA sector. A questionnaire survey was conducted in the RMAA sector in Hong Kong. Data were randomly split into the calibration and the validation samples. The RMAA safety climate factors were determined by exploratory factor analysis on the calibration sample. Three safety climate factors of the RMAA works were identified: (1) management commitment to occupational health and safety (OHS) and employee involvement, (2) application of safety rules and work practices, and; (3) responsibility for health and safety. Confirmatory factor analysis (CFA) was then conducted on the validation sample. The CFA model showed satisfactory goodness of fit, reliability, and validity. The suggested RMAA safety climate factors can be utilized by construction industry practitioners in developed economies to measure the safety climate of their RMAA projects, thereby enhancing the safety of RMAA works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The occurrence of extreme water levels along low-lying, highly populated and/or developed coastlines can lead to considerable loss of life and billions of dollars of damage to coastal infrastructure. Therefore it is vitally important that the exceedance probabilities of extreme water levels are accurately evaluated to inform risk-based flood management, engineering and future land-use planning. This ensures the risk of catastrophic structural failures due to under-design or expensive wastes due to over-design are minimised. This paper estimates for the first time present day extreme water level exceedence probabilities around the whole coastline of Australia. A high-resolution depth averaged hydrodynamic model has been configured for the Australian continental shelf region and has been forced with tidal levels from a global tidal model and meteorological fields from a global reanalysis to generate a 61-year hindcast of water levels. Output from this model has been successfully validated against measurements from 30 tide gauge sites. At each numeric coastal grid point, extreme value distributions have been fitted to the derived time series of annual maxima and the several largest water levels each year to estimate exceedence probabilities. This provides a reliable estimate of water level probabilities around southern Australia; a region mainly impacted by extra-tropical cyclones. However, as the meteorological forcing used only weakly includes the effects of tropical cyclones, extreme water level probabilities are underestimated around the western, northern and north-eastern Australian coastline. In a companion paper we build on the work presented here and more accurately include tropical cyclone-induced surges in the estimation of extreme water level. The multi-decadal hindcast generated here has been used primarily to estimate extreme water level exceedance probabilities but could be used more widely in the future for a variety of other research and practical applications.