992 resultados para Genetic map construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sickle cell disease (SCD) is a genetic disorder with recessive transmission, caused by the mutation HBB:c.20A>T. It originates hemoglobin S that forms polymers inside the erythrocyte, upon deoxygenation, deforming it and ultimately leading to premature hemolysis. The disease presents with high heterogeneity of clinical manifestations, the most devastating of which, ischemic stroke, occurs in 11% of patients until 20 years of age. In this study, we tried to identify genetic modifiers of risk and episodes of stroke by studying 66 children with SCD, grouped according to the degree of cerebral vasculopathy (Stroke, Risk and Control). Association studies were performed between the three phenotypic groups and hematological and biochemical parameters of patients, as well as with 23 polymorphic regions in genes related to vascular cell adhesion (VCAM-1, THBS-1 and CD36), vascular tonus (NOS3 and ET-1) and inflammation (TNF-α and HMOX-1). Relevant data was collected from patient’s medical records. Known genetic modulators of SCD (beta-globin cluster haplotype and HBA and BCL11A genotypes) and putative genetic modifiers of cerebral vasculopathy were characterized. Differences in their distribution among groups were assessed. VCAM-1 rs1409419 allele C and NOS3 rs207044 allele C were associated to stroke events, while VCAM-1 rs1409419 allele T was found to be protective. Alleles 4a and 4b of NOS3 27 bp VNTR appeared to be respectively associated to stroke risk and protection. HMOX-1 longer STRs seemed to predispose to stroke. Higher hemoglobin F levels were found in Control group, as a result of Senegal haplotype or of BCL11A rs11886868 allele T, and higher lactate dehydrogenase levels, marker of hemolysis, were found in Risk group. Molecular mechanisms underlying the modifier functions of the relevant genetic variants are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mycobacterium avium Complex (MAC) comprises microorganisms that affect a wide range of animals including humans. The most relevant are Mycobacterium avium subspecies hominissuis (Mah) with a high impact on public health affecting mainly immunocompromised individuals and Mycobacterium avium subspecies paratuberculosis (Map) causing paratuberculosis in animals with a high economic impact worldwide. In this work, we characterized 28 human and 67 porcine Mah isolates and evaluated the relationship among them by Multiple-Locus Variable number tandem repeat Analysis (MLVA). We concluded that Mah population presented a high genetic diversity and no correlations were inferred based on geographical origin, host or biological sample. For the first time in Portugal Map strains, from asymptomatic bovine faecal samples were isolated highlighting the need of more reliable and rapid diagnostic methods for Map direct detection. Therefore, we developed an IS900 nested real time PCR with high sensitivity and specificity associated with optimized DNA extraction methodologies for faecal and milk samples. We detected 83% of 155 faecal samples from goats, cattle and sheep, and 26% of 98 milk samples from cattle, positive for Map IS900 nested real time PCR. A novel SNPs (single nucleotide polymorphisms) assay to Map characterization based on a Whole Genome Sequencing analysis was developed to elucidate the genetic relationship between strains. Based on sequential detection of 14 SNPs and on a decision tree we were able to differentiate 14 phylogenetic groups with a higher discriminatory power compared to other typing methods. A pigmented Map strain was isolated and characterized evidencing for the first time to our knowledge the existence of pigmented Type C strains. With this work, we intended to improve the ante mortem direct molecular detection of Map, to conscientiously aware for the existence of Map animal infections widespread in Portugal and to contribute to the improvement of Map and Mah epidemiological studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present Working Project aims at studying the topic of assurance mapping in a specific organizational context of a Portuguese retail company. For this purpose, an assurance map framework was designed to support the decision making process of stakeholders, through the delivery of comfort concerning risks, operations and control. In the end, the framework was successfully implemented for the process sourcing of goods in two business units of the company. Although, further implementation of the framework proved not to be feasible during the project’s timespan, it is expected to occur in the near future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The stylistic categorization of the Estado Novo has been intensely discussed by Portuguese art historians. The square Alameda Dom Afonso Henriques in Lisbon (Alameda) can be seen as paradigmatic for the architecture of power of the Estado Novo. The Alameda forms a gardened valley between two hills. There you find two prominent and highly propagandist buildings: The Instituto Superior Técnico (IST) and the Fonte Luminosa are dedicated to modern sciences and respectively to the harmonious contribution of nature to the city. The iconography of the Alameda as well as its incorporation into the propagandist use of urban planning in the 1930s and 1940s exemplify the visual politics during Salazarism. Urban planning programs intended to create cities that would preserve the character of a traditional catholic society and at the same time answer to the need to modernize the country and evoke the image of a progressive state. Thus, public buildings and urban squares such as the Alameda contributed to design a corporate image and to the ‘spirit’ of the regime.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ship tracking systems allow Maritime Organizations that are concerned with the Safety at Sea to obtain information on the current location and route of merchant vessels. Thanks to Space technology in recent years the geographical coverage of the ship tracking platforms has increased significantly, from radar based near-shore traffic monitoring towards a worldwide picture of the maritime traffic situation. The long-range tracking systems currently in operations allow the storage of ship position data over many years: a valuable source of knowledge about the shipping routes between different ocean regions. The outcome of this Master project is a software prototype for the estimation of the most operated shipping route between any two geographical locations. The analysis is based on the historical ship positions acquired with long-range tracking systems. The proposed approach makes use of a Genetic Algorithm applied on a training set of relevant ship positions extracted from the long-term storage tracking database of the European Maritime Safety Agency (EMSA). The analysis of some representative shipping routes is presented and the quality of the results and their operational applications are assessed by a Maritime Safety expert.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recaí sob a responsabilidade da Marinha Portuguesa a gestão da Zona Económica Exclusiva de Portugal, assegurando a sua segurança da mesma face a atividades criminosas. Para auxiliar a tarefa, é utilizado o sistema Oversee, utilizado para monitorizar a posição de todas as embarcações presentes na área afeta, permitindo a rápida intervenção da Marinha Portuguesa quando e onde necessário. No entanto, o sistema necessita de transmissões periódicas constantes originadas nas embarcações para operar corretamente – casos as transmissões sejam interrompidas, deliberada ou acidentalmente, o sistema deixa de conseguir localizar embarcações, dificultando a intervenção da Marinha. A fim de colmatar esta falha, é proposto adicionar ao sistema Oversee a capacidade de prever as posições futuras de uma embarcação com base no seu trajeto até à cessação das transmissões. Tendo em conta os grandes volumes de dados gerados pelo sistema (históricos de posições), a área de Inteligência Artificial apresenta uma possível solução para este problema. Atendendo às necessidades de resposta rápida do problema abordado, o algoritmo de Geometric Semantic Genetic Programming baseado em referências de Vanneschi et al. apresenta-se como uma possível solução, tendo já produzido bons resultados em problemas semelhantes. O presente trabalho de tese pretende integrar o algoritmo de Geometric Semantic Genetic Programming desenvolvido com o sistema Oversee, a fim de lhe conceder capacidades preditivas. Adicionalmente, será realizado um processo de análise de desempenho a fim de determinar qual a ideal parametrização do algoritmo. Pretende-se com esta tese fornecer à Marinha Portuguesa uma ferramenta capaz de auxiliar o controlo da Zona Económica Exclusiva Portuguesa, permitindo a correta intervenção da Marinha em casos onde o atual sistema não conseguiria determinar a correta posição da embarcação em questão.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The intensity of construction of foraging access holes by two leaf-litter feeding, soil- inhabiting termite species, Syntermes molestus and Syntermes spinosus, in a Central Amazonian rain forest, was observed on consecutive nights for two weeks. Between 11 and 48 nest entrances per m2 were counted. Interaction between the two species was intense; some entrance holes were overtaken by the larger species during the observations; however, both species coexist in the area. A calculated minimum of 35 entrances/m2 is built every year by both species, emphasizing the importance of soil-burrowing termites for soil structure, aeration and water regime.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The assessment of concrete mechanical properties during construction of concrete structures is of paramount importance for many intrinsic operations. However many of the available non-destructive methods for mechanical properties have limitations for use in construction sites. One of such methodologies is EMM-ARM, which is a variant of classic resonant frequency methods. This paper aims to demonstrate the efforts towards in-situ applicability of EMMARM, as to provide real-time information about concrete mechanical properties such as E-modulus and compressive strength. To achieve the aforementioned objective, a set of adaptations to the method have been successfully implemented and tested: (i) the reduction of the beam span; (ii) the use of a different mould material and (iii) a new support system for the beams. Based on these adaptations, a reusable mould was designed to enable easier systematic use of EMMARM. A pilot test was successfully performed under in-situ conditions during a bridge construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The authors would like to thank the anonymous reviewers for their valuable comments and suggestions to improve the paper. The authors would like to thank Dr. Elaine DeBock for reviewing the manuscript.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Ecuadorean Amazonas, Crematogaster ants (Myrmicinae) were observed to construct shelters of debris and plant trichomes covering and hiding extrafloral nectaries of Passiflora auriculata vines. This is seen as an advanced way of excluding competing ants from a food source.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs and duration of earthworks in infrastructure construction, the optimal usage of every resource in these tasks is paramount. Considering the characteristics of an earthwork construction, it can be looked at as a production line based on resources (mechanical equipment) and dependency relations between sequential tasks, hence being susceptible to optimization. Up to the present, the steady development of Information Technology areas, such as databases, artificial intelligence and operations research, has resulted in the emergence of several technologies with potential application bearing that purpose in mind. Among these, modern optimization methods (also known as metaheuristics), such as evolutionary computation, have the potential to find high quality optimal solutions with a reasonable use of computational resources. In this context, this work describes an optimization algorithm for earthworks equipment allocation based on a modern optimization approach, which takes advantage of the concept that an earthwork construction can be regarded as a production line.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In highway construction, earthworks refer to the tasks of excavation, transportation, spreading and compaction of geomaterial (e.g. soil, rockfill and soil-rockfill mixture). Whereas relying heavily on machinery and repetitive processes, these tasks are highly susceptible to optimization. In this context Artificial Intelligent techniques, such as Data Mining and modern optimization can be applied for earthworks. A survey of these applications shows that they focus on the optimization of specific objectives and/or construction phases being possible to identify the capabilities and limitations of the analyzed techniques. Thus, according to the pinpointed drawbacks of these techniques, this paper describes a novel intelligent earthwork optimization system, capable of integrating DM, modern optimization and GIS technologies in order to optimize the earthwork processes throughout all phases of design and construction work. This integration system allows significant savings in time, cost and gas emissions contributing for a more sustainable construction.